Optimization of Gridshells Against Instability Considering Joints' Mechanical Performance
Language: English
Published by Springer, Springer Jul 2025, 2025
- Hardcover
- New

Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germanybuchversandmimpf2000
AbeBooks seller since January 23, 2017
Condition: New
£ 28.35
Quantity: 1 available
Add to basketItem description from seller
This item is printed on demand - Print on Demand Titel. Neuware -1. Introduction.- 2. The stability mechanism of single-layer gridshells based on the theory of configuration vulnerability.- 3. Stability Optimization of Single-layer Lattice Shell Structure Based on Rigid Joints.- 4 Stability Optimization and Collapse Resistance Verification of Large Single-layer Lattice Shell Structure.- 5. Topology Optimization Design of Joints of Single-Layer Gridshells.- 6. Optimization of Stability of Single-Layer Gridshells Considering Joint Stiffness.- 7 Conclusion and Prospects.Springer-Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg 200 pp. Englisch.
Seller Inventory # 9789819682034
- Title
- Optimization of Gridshells Against Instability Considering Joints' Mechanical Performance
- Author
- Mingfei Lu
- Publisher
- Springer, Springer Jul 2025
- Publication year
- 2025
- Condition
- Neu
- Binding
- Buch
- Language
- English
- ISBN 10
- 9819682037
- ISBN 13
- 9789819682034
- Item weight
- 505 grams
- Dimensions
- 241x160x16 mm
This open access book introduces external factors such as loads and constraints into the theory of configurational vulnerability, thereby overcoming the classical theory's inability to account for external influences. Stability is a governing factor in the design of single-layer gridshells, becoming increasingly critical as the span grows. However, current design methodologies address stability primarily through post-design verification, which severs the intrinsic link between member design and overall structural stability. This disjointed approach leads to iterative cycles of design and verification, reducing efficiency. Concurrently, advances in industrialized construction have spurred the development of numerous innovative joints tailored for prefabricated construction. These joints are neither ideally rigid nor ideally hinged. Yet, prevailing design methods and stability verification processes still assume ideal rigid connections, failing to incorporate the mechanical properties of joints and thereby constraining the adoption and application of these new designs. This integration provides a novel perspective on instability mechanisms. Based on the instability mechanisms of gridshells, a stability optimization model is developed under the rigid joint assumption. Due to the large number of variables involved in the optimization model, conventional algorithms often prove inadequate. To address this, the study enhances the standard genetic algorithm by replacing its random mutation mechanism with a directed mutation mechanism, significantly improving search efficiency. The improved algorithm efficiently solves large-scale stability optimization problems for single-layer gridshells, as validated using three gridshells of varying scales and two constructed examples. To expand the forms of gridshell joints, the study employs advanced topology optimization techniques to enhance rotational stiffness. Simultaneously, the study integrates the requirements of prefabricated construction by designing a universal connection interface capable of accommodating members from diverse orientations. This effort culminates in the development of novel joint designs for spatial grid structures that are both mechanically efficient and construction-friendly.
"Synopsis" may belong to another edition of this title.
About the Author
Lu Mingfei, born in 1991, is a senior engineer with a master's and doctorate from the School of Civil Engineering at Southeast University. He specializes in spatial structures and underground space development. Currently, he is a senior researcher at the Underground Space Science Research Institute of CCCC First Highway Engineering Group and a postdoctoral fellow at CUMT/CCCC First Highway Engineering Group. He has published over 10 papers, including 6 indexed by SCI/EI, holds 3 software copyrights, and owns 11 invention patents. He has participated in 3 national projects, led 2 provincial-level projects, and was selected for the CCCC Young Talent Support Program.
Ye Jihong, female, of Han ethnicity, was born in January 1967 in Meixian, Guangdong Province. She is a member of the Communist Party of China, a professor, and a doctoral supervisor. She currently serves as a member of the Standing Committee of the Party Committee and Vice President of China University of Mining and Technology.
Her academic and research work focuses on fire resistance, seismic performance, and wind resistance of long-span spatial structures and light steel structures. She has led a number of major national research projects, including a National Natural Science Foundation (NSFC) Major Research Instrumentation Project, an NSFC Key Project, a Major Research Plan of the NSFC, and a subproject of the National Science and Technology Support Program. She is the chief editor of one provincial-level engineering construction standard.
Li Hui, Deputy Director of the Institute of Underground Space Science at CCCC Tunnel Engineering Bureau, holds the title of Senior Engineer. He has long been deeply engaged in the technical management of urban rail transit and super-large diameter shield tunneling. Over the years, he has participated in numerous major tunneling projects, including the Weisan Road Yangtze River Crossing in Nanjing, Beijing Metro Line 8, and Tianjin Metro Line 11. He has taken a leading role in coordinating technical management and scientific research efforts in rail transit, super-large diameter shield tunneling, and underground engineering. Notably, he has been extensively involved in technical planning, support, knowledge accumulation, and standardization for several key super-large diameter shield projects, such as the Nanjing Heyan Road Tunnel, Beijing East Sixth Ring Road Reconstruction Project, Shanghai Airport Link Line, and the Jiangyin–Jingjiang Yangtze River Tunnel.
"About the title" may belong to another edition of this title.
buchversandmimpf2000
Emtmannsberg, BAYE, Germany
AbeBooks seller since January 23, 2017
Shipping rates from Germany to U.S.A.
| Item | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 51.47 | £ 64.34 |
Payment methods
- Check
- Paypal
Store description
Impressum Thorsten Retsch Buchversand Mimpf2000 Oberölschnitz 16 95517 Emtmannsberg Deutschland Telefon: 09209-2023188 Email: mimpf2000@online.de USt-ID-Nr.: DE 235096871 Wir führen gebrauchte Bücher aus allen Sparten der Literatur
Specialty
Modernes Antiquariat - Bücher von 1960 bis heuteSeller's business information
buchversandmimpf2000
Germany
Terms of sale
Impressum
Gesetzliche Anbieterkennung:
Thorsten Retsch
Buchversand Mimpf2000
Oberölschnitz 16
95517 Emtmannsberg
Deutschland
Telefon: 092092023188
E-Mail: order@buchversandmimpf2000.de
USt-IdNr.: DE 235096871
Alternative Streitbeilegung:
Die Europäische Kommission stellt eine Plattform für die außergerichtliche Online-Streitbeilegung (OS-Plattform) bereit, aufrufbar unter http://ec.europa.eu/odr.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to buchversandmimpf2000, Emtmannsberg, BAYE, Germany, +49 09209-2023188, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Soweit in der Artikelbeschreibung keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Werktagen nach Vertragsschluss, bei Vorauszahlung erst nach Eingang des vollständigen Kaufpreises und der Versandkosten. Alle Preise inkl. MwSt.