Oil workers Technical Q & A Series: Drilling Well Control Technology Answers(Chinese Edition)
- Softcover
- New

Condition: New
£ 34.44
- Bank Wire Transfer
- Paypal
Quantity: 1 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date: 2012 Pages: 119 Publisher: Petroleum Industry Press the oil workers Technical Q & A Series: Drilling Well Control Technology Answers describes the knowledge of the drilling well control technology. including drilling well control technology. drilling wells control equipment. hydrogen sulfide protection. rich in content. and practical. Contents: The first part of drilling well control technology. Well control? 2 What was once a well-control? Do well control key is it? 4 What is the secondary well control? What is the core of the secondary well control? .6 What is the three well control? What is well invasion? 8 What is the overflow? 9 What is the kick? 10 What is a blowout? 11 What is the blowout on the ground? 12 What is the underground blowout? 13 What is the uncontrolled blowout? 14 uncontrolled blowout. which has several manifestations? 15 decided to overflow the severity of the main factors is it? - .16. Decision of the main factors of the formation fluid flow conditions is it? 17. Geological design defects associated with well control? 18 related to well control engineering defects? 19 uncontrolled blowout What is the harm? 20 What is a blowout? 21 What is the two blowout? 22 What are the three blowout? 23 What is the four blowout? 24 well control include? 25 What is the positive well control? 26 how to implement the concept of positive well control work in the field? 27 What is the hydrostatic pressure? What are the factors affecting the hydrostatic pressure? 28 hydrostatic pressure calculated? 29 What is the pressure gradient? 30 What is the equivalent fluid density? 31 What is the pressure coefficient? 32 Pressure what kinds of representation? 33. Pressure gradient in the fluid equivalent density transformation? 34 What is the formation pressure. normal pressure formations and abnormal pressure formation how to define? 35 What is the overburden pressure? 36 What is the bedrock stress? 37. Between the overburden pressure and formation pressure? 38 What is the formation collapse pressure? 39 What is the the formation leakage pressure? 40 What is the formation fracture pressure? 41 What is the pressure loss? 42. Pressure loss of the size of the impact factors? 43 conventional drilling. drilling fluid the most pressure loss in the cycle in which parts? 44 What is the pumping pressure? 45 Under normal circumstances. the pumping pressure equivalent density for how much? 46 What is inflammatory pressure? What are the factors of 47. Affect pumping drain pressure and excitement pressure? 48 What is the bottom-hole pressure? Bottomhole pressure is the pressure by which? 49 common drilling conditions bottomhole pressure OK? 50 in the same parameters. which conditions the minimum bottom hole pressure? 51 What is the bottom-hole pressure difference? 52. Bottomhole pressure is too large. what is the harm? 53 drilling fluid density is how to provide value-added security? 54. The choice of drilling fluid density value-added security. you should consider what factors? 55 What is a near-balanced drilling? 56 near-balanced drilling What are the advantages? 57 formation pressure testing What is the purpose and meaning? 58 is generally formed abnormally high pressure formation should have what conditions? 59 What is the role of the trap layer? 60 What are the reasons for the formation of abnormal pressure? 61 What is the shallow pressurized? 62 What are the characteristics of rock salt? What is the principle of detecting abnormal formation pressure? 63. 64 predicted before drilling the formation pressure which two methods? 65 shale density to detect abnormal high pressure formation What is the rationale? 66 What is the purpose of formation strength test? 67. Formation strength test methods are there? 68 Why not brittle rock the rupture pressure test? 69 How formation leakage pressure test? 70 What is the the formatio.…
Seller Inventory # NG026167
- Title
- Oil workers Technical Q & A Series: Drilling Well Control Technology Answers(Chinese Edition)
- Author
- YANG BAO LIN . ZHANG FA ZHAN
- Condition
- New
- Binding
- paperback
- ISBN 10
- 750219276X
- ISBN 13
- 9787502192761
"Synopsis" may belong to another edition of this title.
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.63 | £ 22.71 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.