Offsite Production And Manufacturing For Innovative Construction
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 4 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
Condition: New
Quantity: 4 available
Add to basketThe offsite and modular market is continuing to grow. This book builds on the success of a number of initiatives, including formative findings from literature, research and development and practice-based evidence (success stories). It presents new thinking and direction from leading experts in the fields of: design, process, construction, engineering, manufacturing, logistics, robotics, delivery platforms, business and transformational strategies, change management, legislation, organisational learning, software design, innovation and biomimetics. This book is particularly novel and timely, as it brings together a number of cogent subjects under one collective ‘umbrella’. Each of these chapters contain original findings, all of which culminate in three 'Key Learning Points' which provide new insight into the cross-cutting themes, interrelationships and symbiotic forces that exist between each of these chapters. This approach also provides readers with new contextualised understanding of the wider issues affecting the offsite market, from the need to embrace societal challenges, through to the development of rich value-laden solutions required for creating sector resilience.
Content includes a balance between case studies and practice-based work, through to technical topics, theoretical propositions, pioneering research and future offsite opportunities ready for exploitation. This work includes: stakeholder integration, skills acquisition, new business models and processes, circularity and sustainable business strategies, robotics and automation, innovation and change, lean production methodologies and new construction methods, Design for Manufacturing and Assembly, scaled portfolio platforms and customisability, new legal regulatory standards and conformance issues and offsite feasibility scenario development/integration.
Jack S. Goulding is Professor of Construction Project Management at the University of Wolverhampton (UK) and Joint Coordinator of CIB W121: Offsite Construction. He works closely with industry developing new business models, strategies and change programmes, including technology transfer, organisational learning and offsite manufacturing.
Farzad Pour Rahimian is an Associate Professor at Northumbria University (UK), with expertise in the mainstream areas of: BIM, IT Integrated Design and Construction, Virtual-Reality, Automation, Simulation and Optimisation. He has led various publicly funded research projects, supervised numerous industry-based PhD students and published more than 120 research outputs.
"About this title" may belong to another edition of this title.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books Puddle, New York, New York, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 2.96 | £ 5.19 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.