"Numerical Flow Simulation in FDA's \"Critical Path\" benchmark blood pump "

Language: English

Published by GRIN Verlag, 2021

3346238075 / 9783346238078

  • Softcover
  • New
See all details

Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH

5-star seller

AbeBooks seller since August 14, 2006

Softcover

Condition: New

£ 24.37

£ 51.21 shipping 
Ships from Germany to U.S.A.

Quantity: 1 available

Add to basket
Free 30-day returns

Item description from seller

Druck auf Anfrage Neuware - Printed after ordering - Master's Thesis from the year 2019 in the subject Engineering - Mechanical Engineering, grade: 1.3, University of Rostock, course: Computational Science and Engineering, language: English, abstract: The work focuses on the analysis of the flow fields in the Food and Drug Administrations (FDA) 'Critical Path' benchmark blood pump. The CAD model of the pump is an opensource material, so the thesis works started with the mesh generation. A block-structured hexahedral mesh has been created using ANSYS ICEM CFD 15.0. An unsteady (URANS) incompressible blood flow simulation has been performed using k- SST turbulence model, with one of the operating conditions prescribed by the experimental literature. The simulations were performed using ANSYS CFX 19.1 solver. The validated results for the flow field show promising results in the blade passage region and the diffuser regions but the pressure head obtained has some discrepancies which were analyzed and justified. In addition, a study on hemolysis prediction using Power Law was performed, and the blood damage values of the benchmark blood pump were calculated for the stress-based model in the Eulerian approach.The role of Computational Fluid Dynamics (CFD) in the biomedical field has increased a lot in recent years. The problems related to biocompatibility in medical and biological industries capture the attention of CFD engineers. One such biocompatible device is a Ventricular Assist Device (VAD). The development phase of VAD's associates CFD to make it more robust. VADs generally incorporated with blood pumps, so it is essential to examine the dynamics of the blood flow in the pump and also to analyze the damages concerned with the blood cells.The U.S. Food and Drug Administration (FDA)and the Center of Devices and Radiological Health (CDRH) have sponsored certain CFD'round-robins' to validate the efficiency of computer simulations in biomedical applications. The 'Computational round-robin #2' concerns with a 'Critical Path' benchmark blood Pump.…

Seller Inventory # 9783346238078

Title
"Numerical Flow Simulation in FDA's \"Critical Path\" benchmark blood pump "
Author
Krishnaraj Narayanaswamy
Publisher
GRIN Verlag
Publication year
2021
Condition
Neu
Binding
Taschenbuch
Language
English
ISBN 10
3346238075
ISBN 13
9783346238078
Item weight
101 grams
Dimensions
210x148x5 mm

AHA-BUCH GmbH

Einbeck, Germany

5-star seller

AbeBooks seller since August 14, 2006

Shipping rates from Germany to U.S.A.

Item30 to 40 business days7 to 14 business days
First item£ 51.21£ 59.67
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.

Payment methods

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Bank Wire Transfer
  • Check
  • Paypal

Store description

Das Unternehmen AHA-BUCH GmbH: Seit der Gründung von AHA-BUCH im Juli 2005 ist unser Hauptziel, zufriedenen Kunden so schnell und so preisgünstig wie möglich ihren Bücherwunsch zu erfüllen. Unsere Firma beschäftigt 16 Mitarbeiter, die nur ein Ziel kennen: den Kunden und seine Wünsche! Auf über 3700 m2 Fläche haben wir über 100.000 Bücher, Modernes Antiquariat und Spiele auf Lager.

Specialty

Kinderbücher & Kinderhör Casetten, German Books, Software, Natur & Tiere, Ratgeber, Sachbücher, Englische Bücher, Medizin & Gesundheit, Universität & Studium

Seller's business information

AHA-BUCH GmbH

Garlebsen 48
Einbeck, Germany 37574