Novel Technology and Whole-Process Management in Prefabricated Building
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 25-30 days. Excellent Customer Service.
Seller Inventory # POD-400856
This open access book discusses the challenges, methodologies, applications in construction, technology and whole-process management of prefabricated buildings. It is a valuable resource for building engineers looking to understand the effective use of technology, construction methods, and management systems. The contributions in this book highlight numerous exciting ideas that will spur novel research directions and foster multidisciplinary collaboration, ultimately advancing the industrialization of buildings and information technology.
Xiang Ping, a professor at the School of Civil Engineering, Central South University, his research interests includes dynamics of rail-rail coupling system of high-speed railway, traffic safety of high-speed railway bridge under earthquake action, Finite element Method of computational mechanics, meshless method of computational mechanics, prefabricated building, composite structure, Computational micro and nano mechanics and biomechanics. He is the Deputy director of the National Engineering Laboratory of High-speed Railway Construction Technology, and the selected expert of Hunan Province's Introduction of Overseas High-level Talents Program. He received his PhD from City University of Hong Kong in 2012, and served as a postdoctoral researcher and associate researcher in City University of Hong Kong from 2012 to 2017. He presided over the National Natural Science Foundation of China, published more than 100 SCI papers, including ESI high citation and a number of top Region I SCI papers, and obtained 3 patent authorization, 3 software copyright. As the representative of outstanding teachers of Central South University, he was cordially received by the vice Chairman of the National Committee of the Chinese People's Political Consultative Conference. He is the Associate editor of the SCI journals Frontiers in Materials and Structural Materials,and also the Guest editor of SCI journals Crystals, Frontiers in Materials, Advances in Civil Engineering, Coatings.
Liangdong Zuo, born in Dezhou, Shandong, is a senior engineer and a postdoctoral fellow at Shanghai Jiao Tong University with a Ph.D. in engineering. He mainly engages in research on structural damage identification and monitoring technology. He has successively hosted and participated in more than 10 science and technology projects, including the National Natural Science Foundation of China, the Western Science and Technology Project of the Ministry of Transporte, the Chongqing Natural Science Foundation, and the Chongqing Transportation Science and Technology Project. Dr. Zuo has published more than 20 academic papers in domestic and foreign academic journals and obtained 5 patents. With rich engineering practice experience, he participated in the design, consultation, and construction of more than 30 engineering projects, including Chongqing Garden Expo Park, Longxing Park of Chongqing Liang Jiang New Area, and the regulation of Jialing River Channel in Chongqing, with a total investment of more than 1 billion yuan.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.