The New Polar Order
Bernd Riemann
Sold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: Over 20 available
Add to basketSold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
Condition: New
Quantity: Over 20 available
Add to basketNew Book. Shipped from UK. Established seller since 2000.
Seller Inventory # L2-9798258903938
In The New Polar Order, Bernd Riemann provides a geopolitical examination of the systemic collapse of polar exceptionalism. As the High North transitions from a frozen rampart to a theater of active competition, the traditional geographic protections of the Northern Hemisphere are being erased. This work moves beyond climate alarmism to deliver a cold-blooded analysis of the thermodynamics of sovereignty and the reconfiguration of global strategic depth.
Riemann meticulously documents the transition from ice-scape to sea-scape, identifying a 4x velocity factor in Arctic amplification forcing a radical pivot in global logistics and military posture. From the NATO Lake revolution in the Baltic to the Near-Arctic ambitions of Beijing, the author maps the new coordinates of power.
Key Themes and Technical Analysis Included:
The Thermodynamics of Sovereignty: An investigation into the collapse of the albedo feedback loop and the Methane Clathrate Gun hypothesis. The text analyzes how meteorological destabilization and biogeochemical risks rewrite the rules of territorial integrity and state survival.
Blue Water Logistics and Great Circle Disruption: An anatomy of the death of the chokepoint. The work provides a comparative cost model of the Northern Sea Route (NSR) versus the Northwest Passage (NWP), evaluating the specialized hull bottleneck and the polar risk premium against the traditional Malacca Dilemma.
Institutional Paralysis: A forensic look at the breakdown of the Arctic Council between 2024 and 2026, the emergence of the great scientific blind spot, and the resulting reliance on algorithmic guesswork as shared environmental intelligence networks fracture.
The Sino-Russian Axis: A deep dive into the National Transport Artery doctrine and the Rosatomflot monopoly on atomic cleavage. The analysis explores the transition from a marriage of convenience to a strategic stabilizer, underpinned by dual-use infrastructure and scientific research masks for surveillance.
Asian Polar Architecture: Examination of the RELOS Pact and India’s pursuit of Arctic strategic depth, alongside South Korea’s role as the ice-class industrial engine. The text addresses the Asian voice in polar management and the ISA proxy battles over seabed mining.
The Antarctic Stressor: A critical assessment of the 1959 Antarctic Treaty System and the 2048 horizon. It maps the geometry of claimants and the contested triangles of the South American-British overlap as major powers eye the sub-glacial resource vault.
NATO’s Arctic Sentry: The geopolitical enclosure of the North Atlantic and the strategic shift of JFC Norfolk. The work traces the escalation ladder and the security dilemma defining the Arctic 7’s strategic mineral protection through 2050.
Unlike standard geopolitical texts, Riemann integrates an analysis of sub-glacial resource vaults—including rare earth elements in Greenland and hydrocarbon endowments—with a realistic assessment of the specialized engineering premiums defining the ghost economy of the High North. The work evaluates the Just-in-Time versus Just-in-Case paradox, analyzing how sanction-proofing and strategic contingencies reshape maritime commerce.
Through the analysis of the Lomonosov Ridge and extended continental shelf claims under UNCLOS III, the book clarifies the legal friction points between the Arctic Five. It highlights the paradox of the United States as a non-signatory and the sovereignty challenges faced by Canada, Denmark, and Norway along the Svalbard and Greenland axis.
The New Polar Order concludes that in a system that has fundamentally shifted from its previous equilibrium, dominance is no longer achieved through territorial expansion, but through the technical and institutional capability to maintain operational continuity amid permanent environmental and political flux.
"About this title" may belong to another edition of this title.
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to PBShop.store US, Springfield Gardens, New York, U.S.A., +44 1285 712917, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Books are shipped from our US or UK warehouses. Delivery estimates allow for delivery from either location.
| Order quantity | 7 to 14 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.