New Energy Power Generation Automation and Intelligent Technology
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2614781047
This book collects papers from the 9th China Nuclear Power Plant Digital Technology and Application Seminar held in Ningbo, China in September 2025. This seminar aims to explore the software and hardware of digital and instrument control (I&C) systems in nuclear power plants, such as inspection, testing, certification and research of sensors, actuators and control systems, and the application of electrical and intelligent operation and maintenance technologies. It aims to provide a platform for experts, scholars and nuclear power practitioners to exchange technology and share experience. At the same time, it also provides a platform for the combination of universities and enterprises in the aspects of production, education and research, and promotes the safe development of nuclear power plants. In addition, readers will encounter new ideas to achieve more efficient and safer instruments and control systems.
Yang Xu received his doctoral degree from Department of Engineering Physics of Tsinghua University, Beijing, China, in 2003. After obtaining his degrees, Dr. Xu worked for Institute of Nuclear and New Energy Technology (INET) of Tsinghua University from year 2003 to 2014, and after that, he returned to Department of Engineering Physics. Since December 2010, he served as Associate Professor and National Registered Consulting Engineer. Dr. Xu’s research focuses on the nuclear fuel cycle and instrument control. His research work has won the third-grade prize of national defense science and technology.
Guo Lin, Senior Engineer (highest grade), currently works at the Instrumentation and Control Design Institute of China Nuclear Power Engineering Co., Ltd., serving as Director of the Instrumentation and Control Design Institute, Chief Engineer of Instrumentation and Control Systems, Expert Member of the IEC/TC45/SC45A Standards Committee of the International Electrotechnical Commission (IEC), and Expert Member of TC30/SC1 of the National Standardization Administration (SAC). He has long been engaged in the research and design of instrumentation and control systems and equipment for nuclear power plants. He has published 8 papers in core journals, obtained 10 invention patents (including 2 UK invention patents), received over 10 science and technology progress awards from various societies/associations and group companies, and led the development and revision of the international standard "IEC 62397 - Safety Important Instrumentation for Nuclear Power Plants - Resistance Temperature Detectors".
Zheming Liu studied enterprise financial accounting at Jilin Finance and Taxation College and computer software and application at Jilin University between 1996 and 2013. He was Secretary General of the Product Information Working Committee of China Instrumentation Society and is now Deputy Director and Secretary General of the Enterprise Science and Technology Industry Committee of China Technology Market Association.
Weihua Chen's research focuses on nuclear power instrumentation and informatization, and he was awarded the title of Local Leader in Shenzhen. In recent years, he has won 4 first prizes and 5 second prizes at the provincial and ministerial level, 1 patent gold prize in China, and 1 patent silver prize in Guangdong Province and participated in the publication of 3 SCI papers.
Yanyang Liu, Professor Senior Engineer, Doctoral Supervisor at Nuclear Power Institute of China, serves as Assistant Director of Design and Research Sub-institute, Chairman of the Nuclear Instrument, Control and Electrical Branch of the Sichuan Nuclear Society, and Director of Sichuan Nuclear Power Instrument and Control Engineering and Technology Research Center. Mr. Liu was previously appointed by the institute as Chief Expert in the field of reactor I&C and Chief Engineer of China Nuclear Control System Engineering Co., Ltd. Mr. Liu graduated from Engineering Physics Department of Tsinghua University in 1992 and has long been engaged in the research of reactor I&C system. Mr. Liu has led the design of reactor I&C systems for multiple nuclear power projects including Qinshan phase II, Fangjiashan, Fuqing, etc.
Yongbin Sun, High-Level Engineer of researcher’s grade, is Chairman and General Manager of CGN Digital Technology Co., Ltd. Dr. Sun has extensive experience in I&C system design and has been involved in general design and preliminary design for more than 20 nuclear units in China, including CPR1000, CPR1000+, ACPR1000, HPR1000, VVER-1200, etc. He is also Project Manager for more than 14 units of 100MW NPPs. Dr. Sun has presided over a number of national scientific research projects and the laboratory construction work. He is also In Charge of compiling the top-level standard in the nuclear I&C field initiated by the National Energy Administration of China.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.38 | £ 42.38 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.