Navigating Performance Engineering: The Collapse of Performance Value (1)
Language: English
Published by PerfBytes Press, 2026
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 33.60
Quantity: 2 available
Add to basketItem description from seller
130 pages. 7.00x0.35x10.00 inches. In Stock.
Seller Inventory # x-1964222079
- Title
- Navigating Performance Engineering: The Collapse of Performance Value (1)
- Author
- Pulley, James L (Author)
- Publisher
- PerfBytes Press
- Publication year
- 2026
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1964222079
- ISBN 13
- 9781964222073
- Item weight
- 0.32 kilograms
Software systems increasingly determine whether organizations succeed or fail. Yet the discipline responsible for understanding how those systems behave under pressure-performance engineering-has quietly lost much of the authority it once held.
Navigating Performance Engineering: The Collapse of Performance Value examines how that loss occurred and what it means for modern software organizations.
Drawing on more than three decades of experience in enterprise performance engineering, James L. Pulley III argues that the profession did not fail because systems became too complex. It failed because the scientific foundations of measurement-reproducibility, control, and experimental discipline-were gradually replaced by tooling convenience and compressed delivery schedules.
The result is a profession that often produces activity rather than value: dashboards without decisions, reports without change, and tests that measure performance without influencing outcomes.
This book reconstructs the original purpose of performance engineering as a discipline of risk discovery and operational truth. Through a series of practical and conceptual explorations, the author shows how modern organizations drifted away from measurement science and toward instrumentation theater.
Topics include:
• Why performance engineering is fundamentally a risk discipline, not a testing phase
• How tool-centric workflows replaced experimental thinking
• Why reproducibility, control, and validation disappeared from practice
• The structural effects of compressed delivery pipelines on performance work
• The role of requirements in defining measurable performance truth
• Why modern observability emerged as a reaction to declining pre-production confidence
Rather than proposing yet another testing methodology or toolset, this book focuses on restoring the intellectual foundations of performance engineering itself.
Performance engineering is not about producing charts. It is about producing change.
When measurement cannot influence decisions, the discipline loses authority-and organizations pay the price in production failures, operational instability, and lost trust.
For performance engineers, architects, SREs, and technology leaders, Navigating Performance Engineering provides a clear and challenging examination of how the profession reached this point-and how it can recover its original purpose.
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 10.00 | £ 30.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.