NEW ASPECTS OF DESALINATION & MULTIGENER
AMIDPOUR,MAJID
Sold by Speedyhen, Hertfordshire, United Kingdom
AbeBooks Seller since 26 November 2009
New - Soft cover
Condition: New
Ships from United Kingdom to U.S.A.
Quantity: 2 available
Add to basketSold by Speedyhen, Hertfordshire, United Kingdom
AbeBooks Seller since 26 November 2009
Condition: New
Quantity: 2 available
Add to basketNew Aspects of Desalination and Multigeneration Technologies: Energy Analysis, Hybrid Desalination, Multigeneration explores energy modeling and analysis of desalination systems in both standalone and hybrid states. Fundamentals of renewable desalination technologies for developing solar and other renewable desalination plants are covered, along with comprehensive information on freshwater systems powered from renewable and non-renewable energy. In addition, hybridization of desalination plants, power generation systems and various energy resources are featured as well as thermodynamic modeling of integrated power plants and desalination systems.
Other topics covered include the application of freshwater production methods from an energy point of view; cogeneration technologies; economic and thermoeconomic analysis; and integration of fresh water and power production plants. This reference is useful for energy and mechanical engineers as well as all those working in renewable, environmental and water engineering research.
Majid Amidpour is a Professor of Energy Systems Engineering at KN Toosi University of Technology in Tehran, Iran. Prof. Amidpour has made significant contributions to the field through his research on the integration of energy and freshwater production systems, cogeneration and polygeneration systems, and energy systems upgrading considering environmental issues. Additionally, he has published over 370 national and international conference and journal articles, authored a book on "Cogeneration and Polygeneration Systems," and has been recognized as one of the world's top 1% scientists by Essential Science Indicators (ESI).
Sajedeh Rooholamini Ahangar received her Bachelors from the Faculty of Mechanical Engineering, Babol Noshirvani University of Technology (NIT), Iran, in 2012, and Master of Energy Systems Engineering from Amol University of Special Modern Technologies, Iran, in 2021. She is currently completing her PhD in Energy Systems Engineering at K.N. Toosi University of Technology, Tehran, Iran, with a thesis focusing on the performance of adsorption desalination systems with zero liquid discharge in cogeneration of fresh water and cooling effect. With research interests in desalination, renewable energy, energy systems, hydrogen production, thermodynamic analysis, LNG regasification, and zero liquid discharge, Ms. Rooholamini has six publications to date.
"About this title" may belong to another edition of this title.
Orders usually ship within 2 business days. Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Speedyhen, Eastbourne, United Kingdom, +44 02031763822, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.
| Order quantity | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 41.00 | £ 43.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.