Multi-physical and Non-orthogonal Geotechnical Plasticity Modeling and Algorithms
Lu, Dechun; Zhou, Xin; Liang, Jingyu; Du, Xiuli
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2027923904
This book primarily introduces innovative multi-physical plastic modeling for geomaterials in unsteady environments and advanced numerical methods for elastoplastic models, topics not systematically covered in other literature. The constitutive models in the form of stress-strain-environment will be interesting to students and researchers in geotechnical engineering and rock and soil mechanics. The book provides a thorough exploration of modeling techniques and algorithmic flowcharts, facilitating a deeper understanding of both theoretical models and numerical methods. It also guides readers in applying these tools to describe the mechanical behavior of geomaterials in various unsteady environments and addresses computational challenges in elastoplastic numerical analysis.
Dechun Lu: Professor Dechun Lu earned his PhD degree in 2006 from Beihang University and then worked as a teacher at the College of Architecture and Civil Engineering of Beijing University of Technology up to now. Prof. Lu is the leader of the Beijing Academic Innovation Team and the winner of the National Science Fund for Distinguished Young Scholars. His expertise spans multi-physical geotechnical engineering, computational geotechnical mechanics, urban underground engineering, and intelligent geotechnical engineering. He has published more than 100 academic papers in internationally renowned journals, such as Géotechnique, Journal of the Mechanics and Physics of Solids, Computer Methods in Applied Mechanics and Engineering, and Computers and Geotechnics. Prof. Lu has undertaken more than 10 national-funded projects in China, including 5 key projects. These projects have received over 30 million RMB in government funding. Prof. Lu has received numerous honors and awards, such as the Second Prize of the State Science and Technology Progress Award, the Second Prize of the State Natural Science Award, and the 15th Science and Technology Award for Chinese Youth.
Xin Zhou: Dr. Xin Zhou earned his PhD degree in 2022 from the Beijing University of Technology. He subsequently joined the Department of Civil Engineering at Tsinghua University as a Postdoctoral Fellow. His work focuses on constitutive modeling of geomaterials, numerical methods of elastoplastic problems, and nonlocal methods. Over the past five years, he has published more than 20 papers in prestigious international journals. Dr. Zhou has led projects funded by the Youth Program of the National Natural Science Foundation of China and the Postdoctoral Research Foundation of China, among others. In recognition of his academic contributions, Dr. Zhou was selected for the 9th Young Elite Scientist Sponsorship Program by CAST and received the First Prize of the Natural Science Award (4/5) from the Chinese Society for Rock Mechanics & Engineering in 2023.
Jingyu Liang: Dr. Jingyu Liang earned his PhD degree in 2020 from the Beijing University of Technology. Subsequently, he commenced his postdoctoral research at the Beijing University of Civil Engineering and Architecture, where he was subsequently promoted to the position of research associate in 2023. He has been involved in 5 national and provincial fund projects. Additionally, He has published more than·20 academic papers in renowned journals. Dr. Liang has been recognized for his contributions with awards, such as the “Excellent Doctoral Dissertation Award” (1/1) and the “Natural Science Prize” (5/5) from the Chinese Society for Rock Mechanics & Engineering. His primary research interests encompass geotechnical plasticity, urban underground engineering, frozen soil mechanics, and freezing method construction.
Xiuli Du: Professor Xiuli Du is an academician of the Chinese Academy of Engineering. He earned his PhD degree from the Institute of Engineering Mechanics, China Earthquake Administration, in 1990. In 1996, he was exceptionally promoted to professor. In 2001, he joined the Beijing University of Technology as a faculty member up to now. Prof. Du has long been dedicated to research and practical work in earthquake-resistant engineering. He has authored over 400 research papers published in high-impact journals, both domestically and internationally. Prof. Du has led and completed five major national projects. His achievements have been recognized with five Second Prize of the State Science and Technology Progress Award.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.83 | £ 41.83 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.