Monitoring Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT): Contributions by the German National Data Center (Geologisches Jahrbuch / Reihe B / Regionale Geologie Ausland und angewandte Geowissenschaften - Geological Yearbook / Series B / Regional Geology and Applied Geosciences)
Language: English
Published by Schweizerbart Sche Vlgsb., 2017
- Hardcover
- Used

Seller: killarneybooks, Inagh, Clare, Irelandkillarneybooks
AbeBooks seller since April 20, 2017
Condition: Used - Very good
£ 26.14
Quantity: 1 available
Add to basketItem description from seller
Heavy hardcover, 325 pages, NOT ex-library. VG, clean and bright throughout. Issued without a dust jacket. Contents: Overview & Role of Germany in the Verification Regime: - 1 CTBT Verification & its Implementation in Germany [Verification regime; Seismological monitoring of nuclear explosions in Germany before the CTBT; Implementation & Verification; Main CTBT actors of the German Federal Government; Others] 2 German Contributions to the International Monitoring System IMS [Station Operation & maintenance; Primary & Auxiliary seismic monitoring Station PS19 & AS035; Infrasound array IS26 & IS27; Radionuclide monitoring Station RN33]; - Verification Technologies of the IMS: - 3 Seismic Network of the IMS [IMS seismic network stations; Global seismicity & nuclear explosion tests; Event discrimination & magnitude-yield relationships; Detection capability of the seismic network: methodology & results; Comparison of the detection capability against REB events] 4 Infrasound Network of the IMS [Infrasound: an overview; Infrasound activity in Central/Northern Europe & from Mt Etna volcano; IMS global network performance] 5 Hydroacoustic Network of the IMS [Hydroacoustic stations & technology & propagation & monitoring: examples of natural & anthropogenic Signals; Worldwide location of hydroacoustic events] 6 IMS Radionuclide Network Supported by Atmospheric Transport Modelling ATM [Anthropogenic fission products in the atmosphere; ATM]; - Verification Test Cases for the IMS: - 7 Verification of the North Korean Nuclear Explosions 2006, 2009, 2013, 2016 [Seismic event localization; Source Identification; Yield estimation; Moment tensor Inversion; Radionuclide evidence; New & future System developments for CTBT] 8 National Data Center Preparedness Exercises NPE for an Independent Performance Assessment [First ideas realized in NPE2007 & NPE2008; NPE2009: introducing data fusion; Complex multi-technology scenario for NPE2010; Straight non-compliance in NPE2012; NPE2013; NPE2015] 9 Tohoku Earthquake with Tsunami and the Fukushima Releases as Performance Test for the IMS [Tohoku earthquake of March 11, 2011; ATM simulating the Fukushima radionuclide plume arrival at IMS stations across the globe; Backward modelling: finding Fukushima; Potential blinding of the IMS] 10 Chelyabinsk: Benchmark for Global Infrasound Detections [Chelyabinsk: event description and source characteristics; Detections and non-detections by the global IMS network; Infrasound propagation modelling; Discussion of Parameters influencing detection capability; Seismoacoustic fingerprint of the fireball across Central and Northern Europe]; - International Data Center IDC, National Technical Means and On-site Inspection: - 11 Some Considerations on the Quality of IDC Standard Waveform Products [Quality control work on the IDC Reviewed Event Bulletin; Impact of Interactive analysis on bulletin quality at the IDC in 2007] 12 Remote Sensing Data in Support of CTBT Monitoring: Case Studies of Underground Nuclear Explosions [DlnSAR Processing of ERS data over NTS; Co- & Post-seismic deformation; Wide-area change-detection: Case study of Nevada Test Site Underground nuclear explosions using conventional multispectral satellite data; Comparison of differential SAR interferometry and wide-area change-detection results; Study of the nuclear test in North Korea of October 9, 2006] 13 Role of On-Site Inspections OSI of the CTBT [Regulations & provisions from the Treaty; Decision about the conduct of an OSI; Possible scenarios for an OSI request; Role of NTM in case of an OSI; OSI technologies; OSI search logic & management Systems; Results of an OSI; Integrated Field Exercises 2008 and 2014; Training and nomination of inspectors] 14 Seismic Aftershock Monitoring System SAMS for OSI of the CTBT [Physical background; Role of SAMS in case of an OSI; Method of Nanoseismic Monitoring; SAMS at the IFE14; Detection threshold estimation of SAMS networks].…
Seller Inventory # 005309
- Title
- Monitoring Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT): Contributions by the German National Data Center (Geologisches Jahrbuch / Reihe B / Regionale Geologie Ausland und angewandte Geowissenschaften - Geological Yearbook / Series B / Regional Geology and Applied Geosciences)
- Author
- Christoph Pilger; Lars Ceranna; Christian Bönnemann
- Publisher
- Schweizerbart Sche Vlgsb.
- Publication year
- 2017
- Condition
- Very Good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 3510968581
- ISBN 13
- 9783510968589
"Synopsis" may belong to another edition of this title.
killarneybooks
Inagh, Clare, Ireland
AbeBooks seller since April 20, 2017
Shipping rates from Ireland to U.S.A.
| Item | 5 to 7 business days | 2 to 4 business days |
|---|---|---|
| First item | £ 29.97 | £ 32.68 |
Payment methods
- Bank Wire Transfer
- Paypal
Store description
All U.S.-bound orders are now shipped with UPS for reliable delivery. Additional customs or import fees are highly unlikely; however, please note buyers remain responsible for any duties or taxes that U.S. Customs may assess. -- Killarneybooks is a family-run bookshop based in the Republic of Ireland. We take pride in accurate listings, careful packaging, and prompt service - most orders ship within 24 hours. All books listed are in stock and ready for immediate dispatch - we are not dropshippers. Inquiries always welcome.…
Specialty
professional, academic, non-fictionSeller's business information
killarneybooks
Ireland
Terms of sale
Business Name: killarneybooks
Business Type: Sole Trader
Trade Register Number: 1976607T (not VAT-registered)
Business Address: Ballynoe, Inagh, Co. Clare
Customer Service representative: Ada Boosey
Phone: 00353 857512674
Email: killarneybookseu@yahoo.com
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to killarneybooks, Inagh, Clare, Ireland, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
TNT / FedEX express available on request. Please contact us for more details. Thank you.