Modernizing Legacy Systems: Software Technologies, Engineering Processes, and Business Practices
Language: English
Published by Addison-Wesley Professional, 2003
- Softcover
- Used

Seller: HPB-Red, Dallas, TX, U.S.A.HPB-Red
AbeBooks seller since March 11, 2019
Condition: Used - Good
£ 8.31
Quantity: 1 available
Add to basketItem description from seller
Connecting readers with great books since 1972! Used textbooks may not include companion materials such as access codes, etc. May have some wear or writing/highlighting. We ship orders daily and Customer Service is our top priority.
Seller Inventory # S_456089177
- Title
- Modernizing Legacy Systems: Software Technologies, Engineering Processes, and Business Practices
- Author
- Lewis, Grace,Plakosh, Daniel,Seacord, Robert,Peter Gordon
- Publisher
- Addison-Wesley Professional
- Publication year
- 2003
- Condition
- Good
- Binding
- Paperback
- Language
- English
- ISBN 10
- 0321118847
- ISBN 13
- 9780321118844
Most organizations rely on complex enterprise information systems (EISs) to codify their business practices and collect, process, and analyze business data. These EISs are large, heterogeneous, distributed, constantly evolving, dynamic, long-lived, and mission critical. In other words, they are a complicated system of systems. As features are added to an EIS, new technologies and components are selected and integrated. In many ways, these information systems are to an enterprise what a brain is to the higher species--a complex, poorly understood mass upon which the organism relies for its very existence. To optimize business value, these large, complex systems must be modernized--but where does one begin? This book uses an extensive real-world case study (based on the modernization of a thirty year old retail system) to show how modernizing legacy systems can deliver significant business value to any organization.
"Synopsis" may belong to another edition of this title.
About the Author
Robert Seacord began programming (professionally) for IBM in 1982 and has been programming in C since 1985, and in C++ since 1992. Robert is currently a Senior Vulnerability Analyst with the CERT/Coordination Center at the Software Engineering Institute (SEI). He is coauthor of Building Systems from Commercial Components (Addison-Wesley, 2002) and Modernizing Legacy Systems (Addison-Wesley, 2003). The CERT/CC, among other security-related activities, regularly analyzes software vulnerability reports and assesses the risk to the Internet and other critical infrastructure.
Daniel Plakosh is a senior member of the technical staff in the COTS-Based Systems initiative at the SEI. Prior to joining the SEI, he was the lead software engineer for the Systems Engineering Department at the Naval Surface Warfare Center (NSWCDD).
Grace A. Lewis is a member of the technical staff at the SEI. Before joining the SEI, she was Chief of Systems Development for Icesi University in Cali, Colombia.
"About the title" may belong to another edition of this title.
Shipping rates within U.S.A.
| Item | 4 to 14 business days | 2 to 6 business days |
|---|---|---|
| First item | £ 2.80 | £ 5.22 |
Payment methods
Store description
Half Price Books has been connecting readers to great books since 1972. Customer service is our top priority.
Specialty
AllSeller's business information
Half Price Books, Records, Magazines, Inc.
5803 E. Northwest Hwy.
Dallas, TX U.S.A. 75231
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to HPB-Red, Carrollton, Texas, U.S.A., +1 800-883-2114, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.