The Modern Inverter Mini-Split Operation And Service Handbook: A Field Technician’s Guide to Ductless Heat Pump Installation, Diagnostics, and Refrigerant Charging
Language: English
Published by Independently published, 2026
- Softcover
- New

Seller: California Books, Miami, FL, U.S.A.California Books
AbeBooks seller since October 27, 2023
Condition: New
£ 50.94
Quantity: Over 20 available
Add to basketItem description from seller
Seller Inventory # I-9798191318783
- Title
- The Modern Inverter Mini-Split Operation And Service Handbook: A Field Technician’s Guide to Ductless Heat Pump Installation, Diagnostics, and Refrigerant Charging
- Author
- Kerr, Dillon; McLean, Stewart
- Publisher
- Independently published
- Publication year
- 2026
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 13
- 9798191318783
The ductless inverter mini-split has quietly become one of the most common pieces of comfort equipment a technician will ever touch — and one of the least understood. Most techs can install a line set and pull a vacuum. Far fewer can explain why a suction pressure that would signal a fault on a fixed-speed system is perfectly normal on an inverter running at low speed, or read a pressure-enthalpy diagram well enough to separate a charge problem from an airflow problem before they've burned an afternoon guessing.
This handbook closes that gap. Written for the practicing HVAC/R technician and field engineer who already know their way around a manifold gauge set and a multimeter, it builds from the physics up: the vapor-compression cycle and the P-h diagram that makes it a working diagnostic tool, not a classroom abstraction — the power electronics inside the inverter drive itself: rectification, PFC, the IGBT/IPM bridge, PWM, and sensorless PMSM motor control — system components, controls, and inter-unit communication — load calculation, installation, and commissioning — and a full diagnostic arc across error codes, electrical/electronic faults, and refrigerant-side faults.
Critically, this edition treats the refrigerant transition every technician now has to navigate. R-410A dominated the field for two decades, but under the AIM Act, new U.S. equipment as of January 2025 must use refrigerants under a 700 GWP threshold — which means R-32 and R-454B, both mildly flammable A2L refrigerants. This book covers R-410A because a vast installed base still runs on it, but builds in the A2L safety practices, charge limits, blend glide, and fractionation rules that older reference titles simply predate.
Every chapter closes with fully worked examples and practice problems — in both SI and inch-pound units — with a boxed answer key, so the math of superheat, subcooling, COP, and mass flow becomes something you can actually do at the truck, not just read about.
Inside, you'll find:
- The vapor-compression cycle made quantitative — refrigerating effect, work, COP, and the P-h diagram as a real diagnostic tool
- Refrigerants, ASHRAE 34 safety classes, and the A2L (R-32/R-454B) transition, including EPA Section 608 and AIM Act compliance
- Inverter drive fundamentals: rectifiers, DC bus, power-factor correction, IGBT/IPM bridges, PWM, and sensorless PMSM control
- Component-by-component coverage of indoor units, outdoor units, controls, sensors, and communication protocols
- Load calculation, sizing, electrical rough-in, and full commissioning/evacuation/charging procedures
- Preventive maintenance schedules and a systematic fault-diagnosis methodology across electrical and refrigerant-side faults
- 100+ worked examples and practice problems with full answer keys, in SI and inch-pound units throughout
Whether you're a working technician sharpening your diagnostic method or a field engineer who wants the "why" behind the manufacturer's troubleshooting flowchart, this handbook is built to live on the truck and get used.
"Synopsis" may belong to another edition of this title.
California Books
Miami, FL, U.S.A.
AbeBooks seller since October 27, 2023
Shipping rates within U.S.A.
| Item | 3 to 7 business days | 2 to 5 business days |
|---|---|---|
| First item | £ 0.00 | £ 8.86 |
Payment methods
Store description
Specialty
All authorized categoriesSeller's business information
Miramar International Services LLC
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to California Books, Fort Wayne, Indiana, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.