Microgrids
Book 5 of 6: Big Data for Industry 4.0New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book addresses the needs of researchers on the fundamental level as well as those with more advanced knowledge of microgrids and their evolution. This book covers newly emerging trends in fields such as computer science, energy, electrical engineeri.
Seller Inventory # 497310571
This book addresses the needs of researchers on the fundamental level as well as those with more advanced knowledge of microgrids and their evolution. This book covers newly emerging trends in fields such as computer science, energy, electrical engineering, and electronics and brings the reader current on the newly emerging fields that play an important role in the power infrastructure.
Microgrids: Design, Challenges, and Prospects provides knowledge on decision making for newly evolving trends in microgrid design. It discusses techniques on how to improve the existing power quality and reduce load shedding and power imbalances. The book presents the emerging fields such as data science, machine learning, AI, and IT that now play an important role in microgrid design. The readership includes: researchers, academia, practicing engineers, consumers, power companies, and policy makers located across the globe.
Ghous Bakhsh Narejo is an Associate Professor in the department of Electronic Engineering in the faculty of Electrical, Computer Engineering at NED University of Engineering & Technology in Pakistan. He has 18 years of academic experience in Electronic Engineering, and teaches undergraduate, masters and PhD courses related to Electronic Engineering, Microsystems design, Industrial Electronics, Renewable Energy, and imaging and analog ICs. He received his master’s degree in microsystems, Electronic Engineering from NED University, and PhD in Electrical Engineering from Michigan Technological University, USA. He has to his credit numerous research papers and has authored many research articles which are published in international journals of repute.
Biswaranjan Acharya is an academic currently associated with Kalinga Institute of Industrial Technology Deemed to be University along with pursuing PhD in computer application from Veer Surendra Sai University of Technology (VSSUT), Burla, Odisha, India. He received his MCA in 2009 from IGNOU, New Delhi, India and M.Tech in Computer Science and Engineering in the year of 2012 from Biju Pattanaik University of Technology (BPUT), Odisha, India. He is associated with various educational and research societies like IEEE, IACSIT, CSI, IAENG, and ISC. He has along with 2 years of industry experience as a software engineer, a total of 10 years experience in both academia and industry. He currently is working in research area of multiprocessor scheduling along with other fields such as Data Analytics, Computer Vision, Machine Learning and IOT. He has published research articles in international repute journals as well as serving as a reviewer.
Ranjit Singh Sarban Singh is currently associated with the Faculty of Electronic and Computer Engineering, Universiti Teknikal Malaysia Melaka as Senior Lecturer. He is a member of Advanced Sensors & Embedded Control System Research Group under Center of Telecommunication, Research & Innovation (CeTRI), Universiti Teknikal Malatsia Melaka. Ir. Dr. Ranjit obtained his Bachelor of Elecronic Engineering (Computer Engineering) from Kolej Universiti Teknikal Kebangsaan Malaysia (KUTKM) in 2006, then pursued his Master of Science Engineering by research at Multimedia University, Melaka Malaysia and graduate in 2010. Later in 2013, Ir. Dr. Ranjit was offered a scholarship by the Ministry of Higher Education of Malaysia to pursue his PhD in Electronic and Computer Engineering at Brunel University, London, United Kingdom. Ir. Dr. Ranjit graduated in 2016. His research work is focusing on simulation, modelling and development of renewable energy system and embedded system design, development and validation. He is a registered Professional Engineer with the Board of Engineers, Malaysia and also is registered as a Chartered Engineer with The Institution of Engineering and Technology, United Kingdom.
Fatma Newagy received the B.Sc., M.Sc., and Ph.D. degrees in electronics and electrical communications engineering from Cairo University in 1998, 2002, and 2008, respectively. She was an Assistant Professor with Cairo University from 2008 to 2011. Since 2011, she has been an Assistant Professor with Ain Shams University. She also taught several courses in wireless communications, advanced digital communications, and cognitive radio. Her current research interest focuses on advanced methods of channel coding, Cognitive radio networks, and 5G mobile communications.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.74 | £ 41.74 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.