Microgrid Protection and Control
Language: English
Published by Elsevier Science Publishing Co Inc, 2021
- Softcover
- New

Seller: THE SAINT BOOKSTORE, Southport, United KingdomTHE SAINT BOOKSTORE
AbeBooks seller since June 14, 2006
Condition: New
£ 139.23
Quantity: Over 20 available
Add to basketItem description from seller
This item is printed on demand. New copy - Usually dispatched within 5-9 working days.
Seller Inventory # C9780128211892
- Title
- Microgrid Protection and Control
- Author
- Dehua Zheng
- Publisher
- Elsevier Science Publishing Co Inc
- Publication year
- 2021
- Condition
- New
- Binding
- Paperback / softback
- Language
- English
- ISBN 10
- 012821189X
- ISBN 13
- 9780128211892
- Item weight
- 449 grams
Microgrid Protection and Control is the result of numerous research works and publications by R&D engineers and scientists of the Microgrid and Energy Internet Research Centre. Through the authors long-routed experience in the microgrid and energy internet industry, this book looks at the sophisticated protection and control issues connected to the special nature of microgrid.
The book explains the different ways of classifying types of microgrids and common misconceptions, looking at industrial and research trends along with the different technical issues and challenges faced with deploying microgrid in various settings.
Forecasting short-term demand and renewable generation for optimal operation is covered with techniques for accurate enhancement supported with practical application examples.
With chapters on dynamic, transient and tertiary control and experimental and simulation tests this reference is useful for all those working in the research, engineering and application of microgrids and power distribution systems.
- Contains practical examples to support the research and experimental results on microgrid protection and control
- Includes detailed theories and referential algorithms
- Provides innovative solutions to technical issues in protection and control of microgrids
"Synopsis" may belong to another edition of this title.
About the Author
Wei Zhang is technical director of Microgrid Business Unit of Etechwin Electric Co., Ltd., Goldwind Sc. & Tech. Co., Ltd of China. He has won the national scholarship at master's degree in 2013 and the first prize of Shanghai postgraduate academic BBS for "new energy and power electronic technology". He has three invention patents on "dynamic stability control system and method for microgrid", "Load data acquisition device, predictive control device and load monitoring system" and "Control methods and equipment for super-capacitors in microgrid" and published many papers in the field of microgrid, energy internet and renewable energy integration.
Solomon Netsanet Alemu is senior electrical engineer with Goldwind Sc. & Tech. Co., Ltd of China. Solomon was born in 1987 in Bahir Dar, Ethiopia. He obtained his bachelor degree in Electrical Engineering and M.Sc. in Electrical Power Engineering from Jimma and Arba Minch universities, and doctorate degree in Power system Automation from North China Electric Power University. He has served as lecturer and dean of faculty of engineering & technology in Wachemo University between 2011 and 2014. Solomon has been serving as R&D Engineer during 2015 – 2018 and senior electrical engineer since 2018 in microgrid R&D Centre of Beijing Etechwin/ Goldwind. He is engaged in researching, development and certification of products as well as preparation of standards. His research area include forecasting of renewable generation and load, microgrid protection, control, energy management and operation. He is an IEEE PES member. He has a copy right for a PV Forecaster software and published many papers in journals and conference proceedings.
Ping Wang graduated from North of China Electrical Power College in July, 1984, and studied automation and control major. He is working in Beijing Etechwin Electrical Co., Ltd. Of China, as director of marketing and business. He used to teach in Shenyang Electrical Power College.
Girmaw Teshager Bitew received his Bachelor Degree in Electrical Engineering from Arba Minch University-Ethiopia in 2006, Master’s Degree in electrical power system from Addis Ababa University-Ethiopia in 2011 and Doctoral Degree in Power System and Its Automation engineering from North China Electric Power University-China in 2019. He had been a faculty member in Debre Markos University-Ethiopia for seven years. Currently, he is a senior electrical engineer in R&D department of microgrid at Goldwind Sc. & Tech. Co., Ltd of China. He is also engaged in the development and revision of the IEC standards on protection and control of microgrids. He is an IEEE member. His research interest covers protection and dynamic control in the areas of hydro-pumped storage power system, HVDC transmission, MVDC distribution, and microgrid with the application of power electronics. He has published more than 18 papers in journals and conference proceedings.
"About the title" may belong to another edition of this title.
THE SAINT BOOKSTORE
Southport, United Kingdom
AbeBooks seller since June 14, 2006
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 28 business days | 7 to 28 business days |
|---|---|---|
| First item | £ 15.24 | £ 17.24 |
Payment methods
Store description
The Saint Bookstore has a range of over 1 million titles available.
Specialty
GeneralSeller's business information
SB ONLINE LTD
50 Devonshire Road
Southport, United Kingdom PR9 7BZ
Terms of sale
Please order through the Abebooks checkout. We only take orders through Abebooks - We don't take direct orders by email or phone.
Refunds or Returns: A full refund of the purchase price will be given if returned within 30 days in undamaged condition.
As a seller on abebooks we adhere to the terms explained at http://www.abebooks.co.uk/docs/HelpCentral/buyerIndex.shtml - if you require further assistance please email us at orders@thesaintbookstore.co.uk
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to THE SAINT BOOKSTORE, Southport, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders usually ship within 1-3 business days, but some can take up to 7 days.