Measured Home Performance: Guide to Best Practices for Home Energy Retrofits in California
Language: English
Published by Institute of Gas Technology, 2011
- Softcover
- New

Seller: Cycle Books LA, south el monte, CA, U.S.A.Cycle Books LA
AbeBooks seller since October 3, 2025
Condition: New
£ 17.26
Quantity: 1 available
Add to basketSeller Inventory # AMTV.1582229945.N
- Title
- Measured Home Performance: Guide to Best Practices for Home Energy Retrofits in California
- Author
- Chitwood, Rick; Harriman, Lew
- Publisher
- Institute of Gas Technology
- Publication year
- 2011
- Condition
- new
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1582229945
- ISBN 13
- 9781582229942
The book was updated and expanded in December of 2012 to include the impressive measured results from 15 home energy retrofits in Redding, California that were accomplished using the principles and practices outlined in this report.
Homeowners may also find this information useful, when they want to understand the techniques that regularly achieve utility bill savings of 40 to 70% on an annual basis.
This approach-called Measured Home Performance-is different from other means of saving energy. Most importantly, all of the home's energy features are redesigned and improved at the same time, so the synergies take effect immediately. Next, measurements are taken all the way through the process, to ensure that both the redesign and the installation are excellent. Improved comfort and energy savings are assured by high-tech field measurements, taken by the craftspeople themselves rather than by 3rd-party auditors. This process provides real-time feedback to the real decision makers-the technicians who do the work.
Measurements of critical parameters like duct air leakage, while-house air leakage, supply air flow at each grill, CO concentration & draft pressure of combustion appliances and superheat and subcooling of the AC equipment make the installation quality-good or poor-are instantly clear to the crews. They can fix any shortcomings on the spot, rather than waiting days or weeks for 3rd-party testing results.
Craftspeople measuring key parameters as they work transforms the workplace. Measured quality not only ensures successful results for the homeowners, it self-trains crew members in the field, where they learn more quickly than in the classroom. At the end of every day, workers know when they have achieved excellent results-a powerful motivator that works to everybody's benefit.
"Synopsis" may belong to another edition of this title.
About the Author
Richard (Rick) Chitwood, BSME, is the founder of Chitwood Energy Management in Mount Shasta, California. As a design-build contractor for over 25 years, Rick is an expert in energy-efficient residential building construction, diagnostic testing, and performance evaluation.
Rick has extensive hands-on experience working with builders to improve the energy efficiency of new homes and with homeowners and remodelers to improve the thermal comfort and energy performance of existing homes. For example, he personally performance tested over 3,000 homes in Northern California though Pacific Power's Home Comfort Program. Rick holds California contractor's licenses A (General Engineering), C-2 (Insulation) and C-4 (Boiler), and has also been a certified as heat pump installation technician by the Refrigeration Service Engineers' Society.
Rick is a leader in the building science-based house-as-a-system approach to green home energy design and retrofits. As the lead diagnosis and remediation trainer for the California Building Performance Contractors Association (CBPCA) Rick is one of the principal designers of the CBPCA's training curriculum. He conducts over 80 days of training every year for Architects, Energy Consultants, HERS Raters, HVAC and insulation contractors.
Lew Harriman
Lewis G. Harriman III is the Director of Research & Consulting for Mason-Grant in Portsmouth, NH. He has 35 years of experience with HVAC, building energy reduction, humidity control and investigation and remediation of indoor moisture problems.
Lew has served as the lead author of several chapters in the ASHRAE Handbook (American Society of Heating, Refrigerating and Air Conditioning Engineers). He was also the Project Manager, lead author and illustrator of ASHRAE's Design Guide for Humidity Control, ASHRAE's Guide for Buildings in Hot & Humid Climates and the report to the California Energy Commission titled "A Builder's Guide to Mold Risk Reduction."
Lew has lectured extensively throughout North America, the Carribbean, Asia and Europe on the subjects of building energy reduction, infrared thermal analysis of building enclosures and humidity & moisture control.
In recognition of his consulting and teaching excellence, in 2009 Lew was elected a Fellow of ASHRAE.
"About the title" may belong to another edition of this title.
Cycle Books LA
south el monte, CA, U.S.A.
AbeBooks seller since October 3, 2025
Shipping rates within U.S.A.
| Item | 3 to 14 business days | 3 to 5 business days |
|---|---|---|
| First item | £ 2.23 | £ 9.69 |
Payment methods
Store description
Founded in 2017, Cycle Books began with a simple mission: to share the joy of reading by offering quality books to readers around the world. What started as a small passion project has grown into a trusted source for literature lovers, collectors, and curious minds alike. We specialize in a wide range of titles—from timeless classics and academic texts to rare finds and contemporary favorites. Every book we list is carefully selected and handled with care, because we believe every book has a story, and every reader deserves a great one. Customer satisfaction is at the heart of what we do. We take pride in fast shipping, accurate listings, and responsive service. Whether you're searching for a specific edition or just browsing for your next read, we're here to help you find something special. Thank you for visiting Cycle Books. We look forward to being part of your reading journey.…
Specialty
NOVELSeller's business information
CA, U.S.A.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Cycle Books LA, south el monte, California, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.