Manufacturing Processes For Engineering Materials
Language: English
Published by Addison-Wesley, 1991
- Hardcover
- New

Seller: Basi6 International, Irving, TX, U.S.A.Basi6 International
AbeBooks seller since June 24, 2016
Condition: New
£ 51.14
Quantity: 1 available
Add to basketItem description from seller
New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service.
Seller Inventory # ABEOCT25-64131
- Title
- Manufacturing Processes For Engineering Materials
- Author
- Serope Kalpakjia,
- Publisher
- Addison-Wesley
- Publication year
- 1991
- Condition
- Brand New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0201508060
- ISBN 13
- 9780201508062
- Edition
- 2nd Edition
"Synopsis" may belong to another edition of this title.
About the Author
Serope Kalpakjian taught and conducted research at the Illinois Institute of Technology for 38 years prior to his retirement in 2001 as professor emeritus of mechanical and materials engineering. After graduating from Robert College (high honors), Harvard University, and the Massachusetts Institute of Technology, he joined Cincinnati Milacron, where he was a research supervisor in advanced metal-forming processes. He is the author of numerous technical papers and several articles in handbooks and encyclopedias and has edited various conference proceedings. In addition, Professor Kalpakjian has served on the editorial bards of several journals and the Encyclopedia Americana and is the coauthor of Lubricants and Lubrication in Metalworking Operations. Both first editions of his textbooks, Manufacturing Processes for Engineering Materials and Manufacturing Engineering and Technology, have received the M. Eugene Merchant Manufacturing Textbook Award. He is a Life Fellow of the ASME, Fellow of the SME, Fellow and Life Member of ASM International, emeritus member of CIRP (International Institution for Production Engineering Research), and a founding member and past president of NAMRI/SME.
Among the awards Professor Kalpakjian has received are the Forging Industry Educational and Research Foundation Best Paper Award (1966), an Excellence in Teaching Award from IIT (1970), the Centennial Medallion from the ASME (1980), the International Education Award from the SME (1989), a Person of the Millennium Award from IIT (1999), and the Albert Easton White Distinguished Teacher Award from ASM International (2000). SME named the Outstanding Young Manufacturing Engineer Award after Professor Kalpakjian for the year 2002.
Steven R. Schmid is an associate professor with the Department of Aerospace and Mechanical Engineering, University of Notre Dame, where he teaches and performs research in the general areas of manufacturing, machine design, and tribology. As the director of the Manufacturing Tribology Laboratory at the university, he oversees industry- and government-funded research on a variety of manufacturing topics, including tribological issues in rolling, forging and sheet-metal forming, polymer processing, medical-device design and manufacture, and nanomechanics.
He received the B.S. degree in mechanical engineering from the Illinois Institute of Technology (with honors) and M.S. and Ph.D. degrees, both in mechanical engineering, from Northwestern University. He has received numerous awards, including the John T Parsons Award from the SME (2000), the Newkirk Award from the ASME (2000), and the Kaneb Center Teaching Award (2000). He is the recipient of a National Science Foundation CAREERS Award (1996) and an ALCOA Foundation Award (1994). Dr. Schmid is the author of over 50 technical papers; has edited three conference proceedings; has coauthored two books, Fundamentals o f Machine Elements and Manufacturing Engineering and Tecbnology; and has contributed two chapters to the CRC Handbook of Modern Tribology. He serves on the Tribology Division Executive Committee of the ASME, is an associate editor of the Journal o f Manufacturing Science and Engineering, and is a registered professional engineer and certified manufacturing engineer.
"About the title" may belong to another edition of this title.
Basi6 International
Irving, TX, U.S.A.
AbeBooks seller since June 24, 2016
Shipping rates within U.S.A.
| Item | 3 to 6 business days | 5 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Payment methods
Store description
Professional Book Seller offering fast shipping and hassle-free returns for every order. Our 100% satisfaction policy guarantees that you get the best product and the best service at the best price!
Specialty
Educational and reference booksSeller's business information
Basi6 International LLC
1018 Camino Lago
Irving, TX U.S.A. 75039
Terms of sale
Basi6 Interntional LLC
(A Texas State LLC)
Contact Information:
Raman Arora
Basi6.int@gmail.com
+1-214-4998944
Registered Address:
1944 Lantana Ln,
Irving, TX 75063
Returns Address:
1944 Lantana Ln,
Irving, TX 75063
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.