Managing Design: Conversations, Project Controls a Format: Cloth
Michael LeFevre
Sold by INDOO, Avenel, NJ, U.S.A.
AbeBooks Seller since 9 August 2004
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: Over 20 available
Add to basketSold by INDOO, Avenel, NJ, U.S.A.
AbeBooks Seller since 9 August 2004
Condition: New
Quantity: Over 20 available
Add to basketThis guide to managing design process within the commercial design and construction industry addresses a growing pain point in an industry where collaborative approaches to project delivery are outpacing the way professionals work. It synthesizes issues by investigating the “why,” “how,” and “who” of the discipline of managing design, and gives the “what” and “when” to apply the solutions given various project delivery and contracting methods. The book features candid interviews with over 40 industry leaders―architects, engineers, contractors, owners, educators, technology evangelists, and authors―which present a broad look at current issues and offer paths to future collaboration and change.
Managing Design: Conversations, Project Controls and Best Practices for Commercial Design and Construction Projects is a self-help book for design and construction that provides aninsider’s look at the mysteries of managing design for yourself, team, firm and future. It tackles client empathy; firm culture; owner leadership; design and budgets; dealing with engineers, consultants, and contractors; contracts; team assembly; and much more.
Written in a relatable style, Managing Design: Conversations, Project Controls and Best Practices for Commercial Design and Construction Projects is a welcome resource for owners, contractors, and designers in search of better ways to work together.
“Managing Design blends practical advice from the author's five decades in architecture and construction with wisdom from more than three dozen luminaries in the design, delivery, ownership and operation of the built environment. The result is an extraordinary guide to integrating practice across disciplines.”
―Bob Fisher, Editor-In-Chief, Design Intelligence
“Managing Design peers into the soul of a contentious industry as it grapples with change―a deep dive into the design and construction process in the words of those doing the work. I enjoyed the engineers and contractors’ pleas to be made parties to design process early on. The questions―as interesting as the answers―are both here in this book.”
―Richard Korman, Deputy Editor, Engineering News Record
“Managing Design hits many of the design and construction industry’s ills head-on with insightful interviews by new and established leaders and real-world tactics on creating better teams, better communications between players, and―most vitally―better project results.”
―Rebecca W. E. Edmunds, AIA, Editor, Author and President, r4 llc
Michael Alan LeFevre, FAIA Emeritus, is a Principal with DesignIntelligence Strategic Advisors and a member of the Design Futures Council. He was formerly Vice President, Planning & Design Support at Holder Construction in Atlanta, GA. As an award-winning architect he frequently speaks on the topic of design-construction collaboration. He and has been an advisory board member and guided curricula development for academic programs at the University of Michigan, Georgia Tech, Clemson, and Purdue. In his groundbreaking tenure at Holder he worked with many of the world's leading design firms on high-visibility projects such as the Apple Park Headquarter Campus, and the new Mercedes-Benz Stadium in Atlanta. He now consults nationally and internationally with leading design and construction firms.
"About this title" may belong to another edition of this title.
We sell brand new books from the publisher.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to INDOO, Avenel, New Jersey, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.
| Order quantity | 5 to 14 business days | 5 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.