MAINTENANCE PARTNERSHIP RELATIONSHIP
BANNISTER KENNETH E
Sold by Speedyhen LLC, Hialeah, FL, U.S.A.
AbeBooks Seller since 23 January 2026
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 4 available
Add to basketSold by Speedyhen LLC, Hialeah, FL, U.S.A.
AbeBooks Seller since 23 January 2026
Condition: New
Quantity: 4 available
Add to basketThis book's purpose is to discover and review the many relationships that maintenance will need to foster daily if it is to become best in class. Success in any walk of life is dependent on partner relationships. A successful marriage is based on a relationship in which both partners collectively embrace their similarities, whilst they collaborate to use each other's strengths to overcome weaknesses and bridge their differences. Where teams are concerned, there will be many partner relationships that will need to be navigated and managed separately to achieve a defined and unified level of success.
On any single day, a maintainer must interact multiple times with internal and external resource partners to perform their job. To function professionally a maintenance department must set up and manage multiple partnerships on a continual basis. Partnerships are relationships that live or die based on an understanding of the input and output communications and tangible deliverables required from both sides to make quality management decisions and enable each partner to consistently deliver on their performance mandate at minimum cost.
Building healthy business partner relationships allows both partners to state their respective points of view―and teaches us not to make assumptions on each other’s behalf. Understanding, measuring and tracking what we control lets us objectively define how and where the partnership must work together to better manage and resolve issues that are out of our control, or those we must simply manage.
Kenneth E. Bannister is a UK technical apprenticed and accredited mechanical design engineer, credited on several engineering patents, two of which involved tribology aspects in their design. Ken is also a Certified Maintenance Reliability Professional and since 1988 has consulted worldwide helping clients implement practical and meaningful asset management, reliability, and lubrication management programs. Ken is one of a few asset management consultants holding expertise and accreditation in the field of tribology, lubrication failure management and industrial lubrication application as a designated professional Machinery Lubrication Engineer. Ken was the first consultant to assist a company through the ISO 55001 asset management certification process in North America and was part of the development team for the ICML 55® world lubrication standard. More recently Ken was a contributing author and senior editor for the compilation of the ICML 55.0, ICML 55.1, and ICML 55.2 standard documents. The Maintenance Partnership Relationship handbook joins his recently published Practical Lubrication for Industrial Facilities – Fourth Edition lubrication book. Ken also wrote the very successful Lubrication for Industry book, and the lubrication section for the Machinery’s Handbook as well as other books on energy management and predictive maintenance. Over his career, Ken has published over 650 articles and white papers for numerous international maintenance magazines, with over half dedicated to the field of practical lubrication. Ken was a founding board member of the Plant Engineering Maintenance Association of Canada (PEMAC) and currently sits on the board of directors for the International Council for Machinery Lubrication (ICML) responsible for the rollout of the ICML 55® world lubrication standard.
"About this title" may belong to another edition of this title.
All orders are dispatched with tracking infomation. Prioirty orders are dispatched via USPS Prioity which reduces delivery time to 2-4 working days.
If you are a consumer you can cancel the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
INFORMATION REGARDING THE RIGHT OF CANCELLATION
Statutory Right to cancel
You have the right to cancel this contract within 14 days without giving any reason.
The cancellation period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the the last good or the last lot or piece.
To exercise the right to cancel, you must inform us, Speedy Hen LLC, Bank of America Tower, 50 North Laura Street, Suite 2600, 32202, Jacksonville, Florida, U.S.A., 44 02031763829, of your decision to cancel this contract by a clear statement (e.g. a letter sent by post, fax or e-mail). You may use the attached model cancellation form, but it is not obligatory. You can also electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". If you use this option, we will communicate to you an acknowledgement of receipt of such a cancellation on a durable medium (e.g. by e-mail) without delay.
To meet the cancellation deadline, it is sufficient for you to send your communication concerning your exercise of the right to cancel before the cancellation period has expired.
Effects of cancellation
If you cancel this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to cancel with contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to us or Speedy Hen LLC, 5205 NW 108th Ave, 33351, Sunrise, Florida, U.S.A., 44 02031763829, without undue delay and in any event not later than 14 days from the day on which you communicate your cancellation from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of cancellation
The right of cancellation does not apply to:
Model withdrawal form
(complete and return this form only if you wish to withdraw from the contract)
To: (Speedy Hen LLC, Bank of America Tower, 50 North Laura Street, Suite 2600, 32202, Jacksonville, Florida, U.S.A., 44 02031763829)
I/We (*) hereby give notice that I/We (*) withdraw from my/our (*) contract of sale of the following goods (*)/for the provision of the following goods (*)/for the provision of the following service (*),
Ordered on (*)/received on (*)
Name of consumer(s)
Address of consumer(s)
Signature of consumer(s) (only if this form is notified on paper)
Date
* Delete as appropriate.
TBC
| Order quantity | 7 to 10 business days | 5 to 8 business days |
|---|---|---|
| First item | £ 0.00 | £ 22.30 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.