Liu, B: Spatio-temporal Analysis and Optimization of Land Us
Language: English
Published by CRC Press, 2019
- Softcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 83.65
Quantity: Over 20 available
Add to basketItem description from seller
Seller Inventory # 594606208
- Title
- Liu, B: Spatio-temporal Analysis and Optimization of Land Us
- Author
- Biao Liu|Bo Huang|Wenting Zhang
- Publisher
- CRC Press
- Publication year
- 2019
- Condition
- New
- Binding
- Kartoniert / Broschiert
- Language
- English
- ISBN 10
- 0367885751
- ISBN 13
- 9780367885755
This book proposes a method to solve land use problems, and has made some significant contributions to the land use analysis and optimization study fields. Firstly, three spatio-temporal logit models for land use change analysis, namely, geographically and temporally weighted logit model (GTWLM), spatio-temporal panel logit model (ST-PLM) and generalized spatio-temporal logit model (GSTLM), are proposed. GTWLM, which considers spatio-temporal non-stationarity, includes temporal data in a spatio-temporal framework by proposing a spatiotemporal distance. ST-PLM incorporates the spatio-temporal correlation and individual effect in one model. By integrating GTWLM and ST-PLM, the GSTLM explores spatio-temporal non-stationarity and correlations simultaneously, whilst considering their individual effects to construct an integrated model.
Secondly, a MOO-based two-level spatial planning of land use is proposed. The spatial planning aims at managing and coordinating the land use at different geographic extents and involves spatial layouts and structures of land use at different levels. In spatial planning, GIS and Remote Sensing are used to evaluate, analyze, and measure environmental, economic and social issues. The quantitative relationships between these objectives and spatial land use allocation are then used as rules in the MOO process to simulate environmental conditions under different spatial land use allocation scenarios. The book features a case study of Shenzhen city, the most important Special Economic Zone in China.
This book will be of interest to academics and professionals in the fields of urban planning, land resource management, remote sensing and geographic information systems.
"Synopsis" may belong to another edition of this title.
About the Author
Biao Liu is a Senior Engineer at the Center for Assessment and Development of Real Estate in Shenzhen, China. He is also an adjunct researcher at the Key Laboratory of the Ministry of Land and Resources for Construction Land Transformation, at Guangdong Province Key Laboratory for Land use and consolidation, Guangdong Province Engineering Research Center for Land Information Technology, and at the Wuxi Innovations Center (Shanghai Institute of Technical Physics, Chinese Academy of Sciences). He received his Doctorate at the Chinese University of Hong Kong in 2010. Biao's major research interests are land use studies, mass appraisal and smart cities.
Bo Huang is Professor in the Department of Geography and Resource Management at the Chinese University of Hong Kong, where he is also the Associate Director of the Institute of Space and Earth Information Science (ISEIS). Prior to this, Bo held faculty positions at the University of Calgary, Canada and the National University of Singapore. He has a background and experience in diverse disciplines, including Geographic Information Systems (GIS), remote sensing, urban planning and computer science,. His research interests cover most aspects of GIScience, specifically the design and development of models and algorithms for spatial/spatio-temporal statistics, full-property satellite image fusion and multi-objective spatial optimization, and their applications in environmental monitoring and sustainable land use and transportation planning. Dr. Huang serves as the Asia-Pacific Editor of International Journal of Geographical Information Science (Taylor & Francis) and the Editor-in-Chief of Comprehensive GIS (Elsevier), a three-volume GIS sourcebook.
Wenting Zhang, is a lecturer at the College of Resources and Environment at Huazhong Agricultural University, Wuhan, China. She graduated from the department of Geography and Re
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.01 | £ 42.01 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.