Lightning Protection (Energy Engineering)
Cooray, Vernon
Sold by GoldBooks, Denver, CO, U.S.A.
AbeBooks Seller since 15 May 2019
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 1 available
Add to basketSold by GoldBooks, Denver, CO, U.S.A.
AbeBooks Seller since 15 May 2019
Condition: New
Quantity: 1 available
Add to basketNew Copy. Customer Service Guaranteed.
Seller Inventory # 81U41_90_0863417442
Lightning is a natural phenomenon that has always fascinated humans. It is also a destructive force, and the science of protecting humans and their belongings on earth is called lightning protection. This book provides the reader with a thorough background in almost every aspect of lightning protection. The contents of the book, distributed over 23 chapters, covers all aspects of lightning protection including lightning parameters of engineering interest, the evaluation of the risk imposed by lightning strikes, the art of installing lightning protection systems on various structures, basic principles and procedures necessary to protect electronic equipment in buildings from lightning flashes, grounding in lightning protection, the function of surge protection devices, protection of power transmission lines and telecommunication towers from lightning, the interaction of lightning flashes with wind turbines, various aspects of lightning strikes to trees, medical and engineering aspects of lightning strikes to humans, and lightning warning systems. In addition to providing essential information on lightning protection for engineers and scientists, the book is intended for use as a textbook on lightning protection at both undergraduate and postgraduate level.
Vernon Cooray is a professor in electricity, with special attention to transients and electrical discharges, at Uppsala University, Sweden. Vernon Cooray is an experienced teacher and currently conducts several courses, including the physics of lightning, physics of electrical discharges, and lightning protection for postgraduate students and personnel working in industry. He has conducted experimental and theoretical research in the physics and effects of lightning flashes, electromagnetic compatibility, electromagnetic wave propagation, lightning protection, and the physics of electrical discharges. He has authored more than 250 scientific papers and edited The Lightning Flash (IET, 2003). Vernon Cooray is the editor in chief of the Journal of Lightning Research and Open Access Atmospheric Science Journal. He is a member of the scientific committee of the International Symposium on Lightning Protection and vice president of the scientific committee of the International Conference on Lightning Protection.
"About this title" may belong to another edition of this title.
We ship from Colorado, U.S.A!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to GoldBooks, Comfort, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 4 to 14 business days | 3 to 8 business days |
|---|---|---|
| First item | £ 4.09 | £ 9.47 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.