Large Floating Solutions
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 25-30 days. Excellent Customer Service.
Seller Inventory # POD-404806
Large Floating Solutions builds on the foundations laid in Large Floating Structures: Technological Advances, extending the analysis to the next generation of Very Large Floating Structures (VLFS) as integrated, climate-adaptive urban systems. This volume provides a comprehensive examination of the engineering, environmental, and architectural innovations required to deliver modular, resilient floating cities, alongside offshore energy, aquaculture, and transport infrastructure. It addresses the complex legal, regulatory, and governance frameworks that underpin buoyant urbanism, including property rights, environmental compliance, and international law, and considers the role of artificial intelligence and autonomous maritime systems in urban management. Together, these contributions position floating infrastructure as a critical solution to escalating global water challenges.
Dr. Brydon Timothy Wang is a scholar working at the intersection of law, architecture, and emerging technologies, with a focus on building climate-resilient cities through trustworthy AI and construction technology. Dually qualified in law and architecture, his research examines the regulation of digital twins, smart construction contracts, and automated decision-making systems to support adaptive infrastructure and floating urbanism. Brydon was lead editor of Automating Cities: Design, Construction, Operation and Future Impact (Springer, 2021) and co-editor of Large Floating Structures: Technological Advances (Springer, 2015). He has held academic appointments in both law and architecture schools. Brydon now advises on major energy and infrastructure projects with KPMG, following a career in construction and technology law with global firm Allens Linklaters and more than 15 years of industry experience delivering award-winning public infrastructure.
Prof. C.M. Wang is Professor in Structural Engineering, The University of Queensland. He is a Fellow of Australian Academy of Technology and Engineering, a Member of the European Academy of Sciences and Arts, a Fellow of Academy of Engineering Singapore, a Fellow of Institution of Structural Engineers, and a Fellow of Society of Floating Solutions (Singapore). His research interests are in the areas of structural stability, vibration, optimization, plated structures and very large floating structures. He has published over 500 journal papers and co-authored 10 books such as Structures, Structural Vibration, Shear Deformable Beams and Plates and Exact Solutions for Buckling of Structural Members. He is an Editor‐in‐Chief of the International Journal of Structural Stability and Dynamics and an Editorial Board Member in several journals including Engineering Structures, International Journal of Applied Mechanics, Journal of Marine Science and Engineering and Shock and Vibration. Currently, he leads the Offshore Engineering Programme of the Blue Economy Cooperative Research Centre that conducts research projects that combine seafood, renewable energy and offshore engineering for the first time, underpinned by a $70 million cash investment from the Australian Government and $259 million from industry partners over a 10-year period.
Dr Kim Weinert is a Lecturer in the TC Beirne School of Law, The University of Queensland. Following a career in legal practice and federal politics Kim became a legal academic and an Adjunct Fellow of Griffith University’s Law Futures Centre. Her research interests are in the areas of governance and property law. Kim’s governance research has been cited by the Supreme Court of Queensland and the Western Australian Parliament. She was the Co-editor of Law, Lawyers and Justice - Through Australian Lenses (Routledge, 2020) and Charity Law and Governance: A Private Purpose, Public Benefit and the Regulation Strategy (Hart, 2024). Kim has been invited to present at esteemed property law conferences and to write for respected property law journals.
Dr. Rutger de Graaf-van Dinther is a Seasoned Entrepreneur, Researcher and Visionary Leader, with over 15 years of expertise in climate-resilient floating urban development. His mission is to deploy floating city technology to alleviate the impact of climate change and sea-level rise for hundreds of millions of people within this century, all while fostering positive ecological and social outcomes. His consultancy roles include advising the Dutch Delta Programme, Topsector Water, City of Rotterdam, and international clients from Japan, China, South Korea, Singapore, the USA, and various European countries. From 2011 to 2021, Rutger held the position of Applied Research Professor of Water Innovation at the Rotterdam University of Applied Sciences. Additionally, he served as the Editor of the Journal of Water and Climate Change for the International Water Association from 2010 to 2015. Notable among his works is the collaboration with Henk Ovink, the Special Envoy for Water of the Netherlands, on the "5 Capacities of Climate Resilient Urban Areas." This framework formed the basis of the book Climate Resilient Urban Areas (Palgrave MacMillan, 2021).
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.