An Introduction To Critical Path Analysis

K. G. Lockyer

Published by Sir Isaac Pitman & Sons
Used hardcover

From Watermill Books, Ammanford, United Kingdom Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

AbeBooks Seller since 21 February 2013

This specific copy is no longer available. Here are our closest matches for An Introduction To Critical Path Analysis by K. G. Lockyer.

About this Item

Description:

Photograph available on request. Seller Inventory # mon0001517336

Report this item

Bibliographic Details

Title: An Introduction To Critical Path Analysis
Publisher: Sir Isaac Pitman & Sons
Binding: hardcover
Condition: Good

Top Search Results from the AbeBooks Marketplace

Seller Image

K.G, Lockyer
Published by Sir Isaac Pitman and Sons Ltd, 1964
Used

Seller: BoundlessBookstore, Wallingford, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Good. DJ may have small chips and tears. Book will have been read but remains clean. Cover may have light wear or slight soiling. Pages may be slightly tanned. May contain inscriptions. Seller Inventory # 9999-9992560005

Contact seller

Buy Used

£ 2
£ 6.98 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

K.G. Lockyer
Published by Pitman
Used Hardcover

Seller: Anybook.com, Lincoln, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Hardcover. Condition: Fair. Dust Jacket Included. This book has hardback covers. Ex-library, With usual stamps and markings, In fair condition, suitable as a study copy. Dust Jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN: Seller Inventory # 3344287

Contact seller

Buy Used

£ 2.50
£ 13.40 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Lockyer, K.G.
Published by Sir Isaac Pitman & Sons, 1965
Used Hardcover

Seller: Anybook.com, Lincoln, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Good. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. Clean from markings. In good all round condition. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,350grams, ISBN: Seller Inventory # 7057343

Contact seller

Buy Used

£ 3.84
£ 13.40 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Lockyer, K.G.
Published by Pitman Publishing, 1981
ISBN 10: 0273011774 ISBN 13: 9780273011774
Used Softcover

Seller: Anybook.com, Lincoln, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774. Seller Inventory # 9097836

Contact seller

Buy Used

£ 3.93
£ 13.40 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Lockyer, K.G.
Published by Pitman Publishing, 1981
ISBN 10: 0273011774 ISBN 13: 9780273011774
Used Softcover

Seller: Anybook.com, Lincoln, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Poor. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In poor condition, suitable as a reading copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774. Seller Inventory # 4321467

Contact seller

Buy Used

£ 4.55
£ 13.40 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Stock Image

K G Lockyer
Published by Pitman, 1969
ISBN 10: 0273405446 ISBN 13: 9780273405443
Used Hardcover

Seller: Lady Lisa's Bookshop, Chester, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Hardback. Condition: Used: Acceptable. Hardback with D/J in good condition. Ex library with first page removed. 3rd edition Pitman 1969. - used books, secondhand books, out of print books, hard to find books, for sale, second-hand books, college books, student books, nonfiction, first edition, signed copies, non-fiction books delivered world wide. Excess postage may be required for books over 1 kg in weight outside the EU. ISBN 0-273-40544-6 0273405446. Seller Inventory # 10771

Contact seller

Buy Used

£ 5.95
£ 10 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Seller Image

Lockyer, K. G.
Published by Pitman, London, 1974
ISBN 10: 0273405446 ISBN 13: 9780273405443
Used Hardcover

Seller: BOOKBARROW (PBFA member), Cambridge, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Black Cloth. Condition: Near Fine. Dust Jacket Condition: Near Fine. Reprint. illustrated by b/w. diagrams & charts; "this third edition of the pioneer work on Critical Path Analysis is suitable for both student and practitioner. It contains the distillation of wide experience in teaching and using C. P. A. and embraces all the useful manipulations and calculations currently being used. No mathematical expertise is implied or required. Critical Path Analysis (CPA) is a project management tool that sets out all the individual activities that make up a larger project & shows the order in which activities have to be undertaken including which activities can only take place once other activities have been completed & which activities can be undertaken simultaneously, thereby reducing the overall time taken to complete the whole project."; including index - 219 pages. Size: 8vo - over 7¾" - 9¾" tall. Quantity Available: 1. Category: Science & Technology; C. P. A.; Project Planning; Engineering, Industrial, Trade. ISBN: 0273405446. ISBN/EAN: 9780273405443. Inventory No: SCE00042. Seller Inventory # SCE00042

Contact seller

Buy Used

£ 6
£ 13 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Lockyer, K G
Published by Pitman, 1964
Used Hardcover

Seller: A Squared Books (Don Dewhirst), South Lyon, MI, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Hardcover. Condition: Very Good. Dust Jacket Condition: Very Good. Black cloth covered boards with silver spine titles; jacket has mild edge wear, with a few small chips and tears along edges; 8vo - over 7 3/4" to 9 3/4" tall; interior clean and unmarked; 111 pages. Seller Inventory # SKU1144255

Contact seller

Buy Used

£ 6.47
£ 4.80 shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Lockyer, K. G.
Published by Pitman, 1969
ISBN 10: 0273405446 ISBN 13: 9780273405443
Used Hardcover

Seller: Better World Books Ltd, Dunfermline, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Good. Ships from the UK. Former library book; may include library markings. Used book that is in clean, average condition without any missing pages. Seller Inventory # GRP59378160

Contact seller

Buy Used

£ 6.98
£ 8 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

K. G Lockyer
Published by PITMAN
Used Hardcover

Seller: Kennys Bookstore, Olney, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: As New. 1964. Reprint. Hardcover. Clean copy. . . . . Books ship from the US and Ireland. Seller Inventory # KST0003165

Contact seller

Buy Used

£ 7.14
£ 7.77 shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

There are 10 more copies of this book

View all search results for this book