Interfacing Risk and Earned Value Management: 1

APM Risk Management SIG and APM Earned Value Management SIG

ISBN 10: 1903494249 ISBN 13: 9781903494240
Published by Association for Project Management, 2008
Used Soft cover

From WeBuyBooks, Rossendale, LANCS, United Kingdom Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

AbeBooks Seller since 14 November 2005

This specific item is no longer available.

About this Item

Description:

Most items will be dispatched the same or the next working day. An apparently unread copy in perfect condition. Dust cover is intact with no nicks or tears. Spine has no signs of creasing. Pages are clean and not marred by notes or folds of any kind. Seller Inventory # wbs8778075944

Report this item

Synopsis:

This publication examines in detail the interfaces between project risk management and earned value management, two elements of a cohesive body of knowledge that constitutes project management as we know it today. Project management has sometimes been compartmentalised into its discrete skill elements product decomposition, planning, scheduling, cost estimating, requirements management, risk management, and performances techniques such as earned value management. Specialising may occasionally overlook the interfaces that make the management disciplines of project management a cohesive whole. This guide represents the outputs of the discussions between two specialist groups of practitioners from the Association for Project Managements Risk Management SIG (Specific Interest Group) and the APM Earned Value Management SIG. To find out more, please contact the SIG at http://www.apm.org.uk/sigcontacts.asp. The Association for Project Management (APM) is Europes largest single national professional body dedicated to project management.

About the Author: Contributing authors (in alphabetical order by surname): Dave Boden (Quintec), Lauren Bone (Bone Consulting Limited), Peter Campbell (APM Risk SIG), David Chard (BAE Systems), Edwina Hayward (BMT Sigma), David Hillson (Risk Doctor & Partners), Val Jonas (Risk Decisions Limited), Bob Llewelyn (Rolls Royce), Pete Mill (BAE Systems), Ken Newland (Quintec), Kerry Smith (Ministry of Defence), Tom Teixeira (Rolls Royce), Tony Welch (BAE Systems), Daniel Wynne (Turner & Townsend)

"About this title" may belong to another edition of this title.

Bibliographic Details

Title: Interfacing Risk and Earned Value Management...
Publisher: Association for Project Management
Publication Date: 2008
Binding: Soft cover
Condition: Like New

Top Search Results from the AbeBooks Marketplace

Stock Image

APM Risk Management SIG and APM Earned Value Management SIG
ISBN 10: 1903494249 ISBN 13: 9781903494240
Used Paperback

Seller: Greener Books, London, United Kingdom

Seller rating 4 out of 5 stars 4-star rating, Learn more about seller ratings

Paperback. Condition: Used; Very Good. **SHIPPED FROM UK** We believe you will be completely satisfied with our quick and reliable service. All orders are dispatched as swiftly as possible! Buy with confidence! Greener Books. Seller Inventory # 4562847

Contact seller

Buy Used

£ 10
£ 15.99 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Stock Image

APM Risk Management SIG And APM Earned Value Management SIG
ISBN 10: 1903494249 ISBN 13: 9781903494240
New PAP

Seller: PBShop.store UK, Fairford, GLOS, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

PAP. Condition: New. New Book. Shipped from UK. Established seller since 2000. Seller Inventory # LW-9781903494240

Contact seller

Buy New

£ 13.33
£ 9.36 shipping
Ships from United Kingdom to U.S.A.

Quantity: 15 available

Add to basket

Stock Image

APM Risk Management SIG And APM Earned Value Management SIG
ISBN 10: 1903494249 ISBN 13: 9781903494240
New PAP

Seller: PBShop.store US, Wood Dale, IL, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

PAP. Condition: New. New Book. Shipped from UK. Established seller since 2000. Seller Inventory # LW-9781903494240

Contact seller

Buy New

£ 15.01
Free Shipping
Ships within U.S.A.

Quantity: 15 available

Add to basket

Stock Image

APM Risk Management SIG And APM Earned Value Management SIG
ISBN 10: 1903494249 ISBN 13: 9781903494240
New Paperback
Print on Demand

Seller: THE SAINT BOOKSTORE, Southport, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Paperback. Condition: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days. Seller Inventory # C9781903494240

Contact seller

Buy New

£ 16.26
£ 13.14 shipping
Ships from United Kingdom to U.S.A.

Quantity: Over 20 available

Add to basket