Intelligent and Sustainable Power and Energy Systems
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDr. M. Premkumar is working as a Professor and head of the Electrical and Electronics Engineering Department at the Dayananda Sagar College of Engineering, Bengaluru, India. He has over 17 years of teaching experience. He has published over 180 te.
Seller Inventory # 2375253759
“Intelligent and Sustainable Power and Energy Systems” delves into the critical advancements shaping the future of global energy. This compilation presents cutting-edge research and innovative solutions addressing the urgent need to transition towards environmentally responsible and technologically sophisticated energy infrastructures. Explore the integration of artificial intelligence, machine learning, and advanced control systems in optimising energy generation, distribution, and
consumption. Discover novel approaches to renewable energy integration, smart grid technologies, and energy storage solutions, all geared towards enhancing efficiency and minimising environmental impact. From theoretical frameworks to practical implementations, this work offers a comprehensive overview of the latest developments, providing essential insights for researchers, engineers, and policymakers striving to build a resilient and sustainable energy future. This book is a vital resource for navigating the complex challenges and opportunities in the evolving landscape of power and energy systems.
Dr. M. Premkumar is working as a Professor and head of the Electrical and Electronics Engineering Department at the Dayananda Sagar College of Engineering, Bengaluru, India. He has over 17 years of teaching experience. He has published over 180 technical articles in various National/International peer-reviewed journals, such as IEEE, Elsevier, Springer, and so on, with over 4500 citations and an H-index of 37. He has published/granted twelve patents by IPR, India, and IPR, Australia. He is also an Editor/Reviewer for leading journals of different publishers, such as IEEE, IET, Wiley, Taylor & Francis, Springer, MDPI, etc. He is recognised as one of the Top 2% of Scientists Worldwide based
on the Study Conducted by Stanford University for the four consecutive years (2020, 2021, 2022, and 2023). His current research interests include power converters/inverters, renewable energy systems, smart grid and microgrids, PV parameter extraction, modern PV MPPTs, PV array faults, non-isolated/isolated dc-dc converters for renewable energy systems and electric vehicles, BMS for electric vehicles, and optimisation algorithms, including single-, multi-, and many-objectives for real-time power electronics and power systems problems.
Dr. Pasumarthi Usha received the B.Tech from E&EE in 1990, M.Tech in Power System with emphasis in High Voltage from J.N.T.U, College of Engineering Kakinada in 1992, and the Ph.D. in HVDC Power Transmission from Visvesvaraya Technical University in 2013, respectively. She works as a Professor at the Department of Electrical and Electronics Engineering, Dayananda Sagar College of Engineering. Her research areas are HVDC Power systems, Microgrid, and Power Electronics.
Dr. Sujit Kumar received his PhD in Electrical Engineering from MPUAT, CTAE, Udaipur, with the collaboration of IIT Roorkee with the DST Inspire Fellowship. He also worked as SRF at IIT Roorkee during the period of his PhD. He did his M. Tech from Sharda University, Greater Noida, as a Gold Medallist, and his B.E from Birla Institute of Technology and Science, Pilani (BITS Campus) as a gold medallist. During his B.E., he received a Governor of France Scholarship for his academic excellence. He is currently posted as an Assistant Professor in the Department of Electrical and Electronics Engineering at Dayananda Sagar College of Engineering, Bengaluru, India. He receives the prestigious Gold Medal in the NPTEL training course (Fuzzy Sets, Logic and Systems & amp; Applications) and exemplifies professional development and lifelong learning excellence. He secured all India ranks in GATE 2017 and GATE 2018 as 16 and 17, respectively. His expertise includes Nanotechnology, Material Science, Sustainable Energy, and Artificial Intelligence in Power Systems.
Dr. Manikanta Gopisetti is an assistant professor at Dayananda Sagar College of Engineering, Bengaluru, India. He completed his Ph.D. in Electrical Engineering from AUUP, Amity University in 2021. He received his M. Tech. degree in Power System Engineering, from SRM University Chennai, India. He graduated from Chaitanya Engineering College, Visakhapatnam, India. He has received two best paper awards in IEEE indexed conferences. He has published many research papers in reputed journals and conference proceedings. He delivered some talks on Distributed generators, Network reconfiguration and Electric Vehicles. His research interests include Distributed Generation, Network Reconfiguration, Electric Vehicles, Evolutionary Computation, and Renewable Energy Sources.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.27 | £ 42.27 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.