Integration of Distributed Resources in Smart Grids for Demand Response and Transactive Energy: A Case Study of TCLs
Language: English
Published by Springer, 2022
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 164.12
Quantity: 2 available
Add to basketItem description from seller
288 pages. 9.25x6.10x0.75 inches. In Stock.
Seller Inventory # x-9811671729
- Title
- Integration of Distributed Resources in Smart Grids for Demand Response and Transactive Energy: A Case Study of TCLs
- Author
- Song, Meng/ Gao, Ciwei
- Publisher
- Springer
- Publication year
- 2022
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 9811671729
- ISBN 13
- 9789811671722
- Item weight
- 0.45 kilograms
The proliferation of renewable energy enhances the sustainability of power systems, but the inherent variability also poses great challenges to the planning and operation of large power grids. The corresponding electric power deficiencies can be compensated by fast ramping generators and energy storage devices. However, frequent ramp up/down power adjustments can increase the operation and the maintenance cost of generators. Moreover, storage devices are regarded as costly alternatives. Demand response (DR) and transactive energy can address this problem owing to its attractive and versatile capability for balancing the supply-demand, improving energy efficiency, and enhancing system resilience. Distributed resources are the typical participants of DR and transactive energy programs, which greatly contribute to keep the supply and demand in a balance.
Thermostatically controlled loads (TCLs) (i.e., air conditioners, water heaters, and refrigerators) represent an exampleof distributed resources, the ratio of which to the total power consumption in developed countries is up to 30%–40%. Providing tremendous potentials in adjustable power consumption, TCLs have attracted major interests in DR and transactive energy opportunities. It has highlighted the advantages of TCLs in responding to uncertainties in power systems.
This book provides an insight of TCLs as typical distributed resources in smart grids for demand response and transactive energy to address the imbalance between supply and demand problems in power systems. The key points on analysis of uncertainty parameters, aggregated control models, battery modelling, multi-time scale control, transactive control and robust restoration of TCLs are all included. These are the research points of smart grids and deserve much attention. We believe this book will offer the related researcher a better understanding on the integration of distributed resources into smart grid for demand response and transactive energy. And it will be helpful to address the problems in practical projects.
"Synopsis" may belong to another edition of this title.
About the Author
Prof. Meng Song received the B.S. degree from Southeast University, Nanjing, China in 2012, the M.S. degree from the Harbin Institute of Technology, Harbin, China in 2014, and Ph.D. degree from Southeast University in 2018. From 2018 to 2020, she was a Post-Doctoral fellow in University of Central Florida. She is currently working in the department of electrical engineering, Southeast University. Her research interests include demand response, smart grid modeling and control, transactive energy and power system resilience. She has focused on demand response and transactive energy for 6 years which covers her doctoral and postdoc duration and thus has a deep insight into this field. This book collects and summarizes most highlights of all her research.
Prof. Ciwei Gao is the full professor of school of electrical engineering, Southeast University, P.R.China. He is the IEEE senior member, received the B.S. degree from North China Electric Power University,Baoding, China in 1999, the M.S. degree from Wuhan University, Wuhan, China in 2003, and Ph.D. degree from Politecnico di Torino in 2006 and Shanghai Jiaotong University in 2007. He has More than 20 years research experience in the field of electrical engineering, focusing on electricity market, demand side management and demand response, power planning and integrated energy systems. Provide course “Power system analysis”, “Fundamentals of Power Economics” and “Power Planning” in the university for the graduate and undergraduate students. Authored nearly 200 publications of journals or conferences. PI of more than 100 research projects cooperating with State Grid Corporation of China, Southern Grid Corporation of China, China EPRI (Electrical Power Research Institute), Electricity/Energy Regulation Agencies, Energy Foundation of America and Prosperity Fundation of UK etc.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 10.00 | £ 30.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.