Integrated Energy Systems with a Carnot Battery
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 2 available
Add to basketCondition: New
Quantity: 2 available
Add to basketIntegrated Energy Systems with a Carnot Battery: A Pathway to Low-Carbon Energy Systems explores Carnot battery technology and its integration into modern energy systems, demonstrating how it can efficiently store and convert energy. It presents optimization approaches of Carnot batteries, including various system layouts, thermal energy storage options, and round-trip efficiency improvements.
Covering the modeling of integrated energy systems (IES), the book focuses on the interaction among various energy carriers (electricity, steam, heat, etc.). It explores the integration of Carnot batteries into IES, featuring case studies illustrating their applications in optimizing system performance, stability, and cost-effectiveness in industrial environments.
This book serves as a comprehensive guide for energy researchers, engineers, and industry professionals seeking innovative solutions for energy storage and conversion.
Xiaojie Lin is Associate Professor at the College of Energy Engineering, Zhejiang University. He graduated with a bachelor’s degree in Energy and Environmental Systems Engineering from Zhejiang University in 2012 and obtained a PhD degree in Mechanical Engineering from the University of Maryland, USA, in 2017. During his PhD study, he worked under renowned experts in refrigeration and HVAC fields, researching dynamic simulation modeling and demand response optimization control of variable refrigerant flow systems and phase change materials. After obtaining his PhD, he worked at Mitsubishi Electric R&D Center on dynamic simulation and design of energy systems for zero energy buildings in Japan. In 2018, Dr. Lin joined Zhejiang University as a postdoctoral researcher, focusing on theoretical research on multi-complementary smart heating technologies, and received funding from the "International Postdoc Exchange Program" of the Ministry of Human Resources and Social Security. His current research directions are integrated energy system modeling, control theory, and smart heating technologies.
Jian Song is Assistant Professor at the Birmingham Centre for Energy Storage and School of Chemical Engineering, University of Birmingham, UK; Honorary Research Fellow at the Department of Chemical Engineering, Imperial College London; and Managing Editor of Applied Thermal Engineering. He has been acting as the Deputy Group Leader of Clean Energy Processes Laboratory at Imperial College London prior to joining Birmingham in May 2023. He received his PhD Degree from Tsinghua University in 2018 and was awarded the Zijing Scholar Fellowship, Outstanding PhD Thesis by Chinese Society for Internal Combustion Engines, and Wu Zhonghua Outstanding Postgraduate Award. Dr. Jian Song visited the Whittle Laboratory at the University of Cambridge in 2016 and participated in an internship at Mitsubishi Heavy Industries in 2015. His research focuses on clean and sustainable energy technologies, which covers thermal fluids, processes, devices, and systems, with an emphasis on multi-scale integrated design and optimization of energy conversion and storage options, aiming at enhancing energy utilization efficiency across conventional and renewable resources, and contributing to energy harvesting and sustainability.
Wei Zhong is Professor at the College of Energy Engineering, Zhejiang University. He is Deputy Director of the Institute of Thermal Science and Power Systems, Energy Engineering College and Deputy Director of Power Engineering Center, Polytechnic Institute, Zhejiang University. His current research interests include smart energy system, complex thermal hydraulic system modeling and simulation, thermal system engineering, cyber-physical system, model predictive control, artificial intelligence, industrial big data, and other thermal energy engineering/information technologies. He is also interested in optimization and control of heating system in future smart cities, district integrated energy system regulation, circular economy and industrial ecology, power plant (industrial boiler) performance design and simulation, and smart power plant engineering application technology research. He has published more than 30 papers on SCI and EI and has won more than 10 provincial and ministerial-level scientific and technological progress awards. So far, he has undertaken more than 100 major projects, including the National Key R&D Project, the Provincial Natural Science Funding Project, and other enterprise cooperate projects.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 13 to 40 business days | 13 to 40 business days |
|---|---|---|
| First item | £ 42.29 | £ 42.29 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.