From Inspiration to Solutions
Language: English
Published by Springer Verlag GmbH, 2026
- Hardcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 199.02
Quantity: Over 20 available
Add to basketSeller Inventory # 3439035837
- Title
- From Inspiration to Solutions
- Publisher
- Springer Verlag GmbH
- Publication year
- 2026
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 981923526X
- ISBN 13
- 9789819235261
"Synopsis" may belong to another edition of this title.
About the Author
Dr. Mia Tedjosaputro is a Senior Lecturer in Architecture at Liverpool John Moores University, with professional and academic experience in Indonesia, Singapore, China, and the UK. She holds a PhD from the University of Nottingham and a PGCHE teaching qualification from Falmouth University. She previously served as Assistant Professor at Xi’an Jiaotong-Liverpool University, where she held several academic leadership roles, including Deputy Head of Architecture, BEng Architecture Programme Director, and Coordinator of the Digital Design and Fabrication Research Lab. She is currently recognised as a Visiting Scholar at XJTLU. Her research focuses on design behaviour, digital design cognition, and digital architecture, with particular interest in the relationship between human creativity, digital tools, and architectural practice.
Dr. Davide Lombardi is a chartered architect, scholar, and Senior Associate Professor in Architecture at Xi’an Jiaotong-Liverpool University. He previously served as Head of the Department of Architecture and has contributed to academic leadership, curriculum development, accreditation processes, and international research initiatives. His work focuses on computational design, digital fabrication, blockchain and Web3 applications for the AEC sector, gamification, and digital education in architecture. He has published across books, journals, and conference proceedings, and has delivered invited lectures and keynote contributions at international institutions. Alongside his academic work, he has collaborated with architectural practices on projects across Europe, Asia, Africa, and the Middle East. He is currently a Visiting Professor at De Montfort University Dubai and an Associate Editor of Architectural Science Review.
Giancarlo Di Marco is a Senior Associate Professor and architectural engineer whose work redefines the intersection of artificial intelligence and the built environment. With over two decades of international experience spanning Europe, the Americas, and Asia, he leads research into intelligent construction automation. His current focus is developing an AI-enabled performance-prediction model for 3D concrete printing, integrating multimodal large language models, computer vision, and real-time sensor feedback to achieve closed-loop adaptive control. He is also building trust infrastructure for digital construction through blockchain-anchored “3DPC Specimen Passports” for equipment-agnostic certification. Drawing on his industry background as Senior Advisor for Confindustria, he bridges advanced research and industrial application. He served as Academic Director of the Design FabLab and Programme Director for the Master of Architecture, embedding AI and robotic fabrication into curricula. He has published widely, authored the book Simplified Complexity (2018), and is a regular keynote speaker at international conferences.
Professor Marc Aurel Schnabel is a recognised expert in digital transformation, design, heritage, intelligent cities, and extended reality environments. With over 30 years of experience across Germany, China, Australia, New Zealand, and Japan, his career bridges academia, research leadership, and the creative industries. He is Dean of the Design School at Xi’an Jiaotong-Liverpool University and was previously Dean of a New Zealand university. He also served as Founding Director of the FORUM8 Research Lab in Tokyo, working with Japan’s leading company in virtual city and building simulation. Trained as an architect, he has held senior academic leadership roles internationally and is a Fellow of both the Architectural Science Association and the Association for Computer-Aided Architectural Design Research in Asia.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.98 | £ 41.98 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.