Innovative Trends in Hydrological and Environmental Systems
Book 217 of 362: Lecture Notes in Civil EngineeringNew - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book presents select proceedings of the International Virtual Conference on Trends in Hydrological and Environmental Systems (ITHES 2021). Various topics covered in this book include urban hydrology, hydrological extremes, statistical analysis of hy.
Seller Inventory # 859350358
This book presents select proceedings of the International Virtual Conference on Trends in Hydrological and Environmental Systems (ITHES 2021). Various topics covered in this book include urban hydrology, hydrological extremes, statistical analysis of hydro-meteorological data, impacts of climate change, hydrological modelling, groundwater studies, water resource management and applications of RS & GIS in hydrology. The book also discusses various topics on applications of CFD in water resources and environmental engineering, water and wastewater treatment, solid waste management and air quality. The book will be a valuable reference for beginners, researchers, and professionals interested in environmental civil engineering, especially hydrological and environmental systems.
Dr. Anil Kumar Dikshit is Higher Administrative Grade (HAG) Professor in the Environmental Infrastructure & Clean Tech (EICT) Group and In-charge of GIS Laboratory for Environmental Management & Sustainability (GEMS) of the Environmental Science and Engineering (ESE) Department at Indian Institute of Technology, Bombay, India. He did his graduation and masters' in civil engineering in 1985 and 1987, respectively, and completed Ph.D. in civil and environmental engineering from Cornell University, USA in the year 1994. The areas of his teaching interest are environmental systems planning and management; environmental impact assessment; water supply and wastewater engineering; environmental engineering; and solid and biomedical waste management while the areas of research interest include environmental infrastructure; clean technology; urban, biomedical, hazardous and electronic solid waste management; environmental modeling, optimization, impact assessment, sustainability and life cycle assessment; and GIS applications to water and environment related problems. He has more than 30 years of experience in Teaching, Research and Consultancy at IIT Kanpur, Cornell University, IIT Kharagpur and IIT Bombay. He has also taken several short assignments as visiting professor at Kigali Institute of Science & Technology, Rwanda; University of Kwazulu-Natal, South Africa; Nanyang Technological University, and National University of Singapore, Singapore; Malardalen University, Sweden; and Asian Institute of Technology, Bangkok. He has guided 40 masters' and 22 doctoral scholars while 5 research scholars are working on their PhDs. He has also worked on more than 150 national and international research and consultancy projects. He is having research collaboration with German, French, US, Singapore, South Africa, Sweden, Norway and Thailand Universities and Institutions and has organized 10 International Conferences, 8 Workshops and 30 Training Courses. He is prolific speaker and has delivered more than 300 invited talks at various national and international forums. The results of academic research work have provided 1 patent, 7 books, 11 chapters in edited books, 100 reports, 135 publications in international & national journals, 140 in international & national conferences while many more papers are under review. In addition, more than 20 prototypes / equipment related to various environmental pollution management topics; academic versions of more than 10 environmental modeling and simulation software(s); and about 7 GIS applications on environmental management problems have been developed under his guidance. He is associate editor, reviewer or editorial board member for many peer-reviewed environmental journals.
Dr. Balaji Narasimhan is currently a Professor at the Department of Civil Engineering, Indian Institute of Technology Madras, Chennai. He obtained his B.E (Agricultural Engineering) from Tamil Nadu Agricultural University, Coimbatore; M.S. from University of Manitoba, Canada and PhD from Texas A&M University, USA. Balaji Narasimhan is a Hydrologist with expertise in modelling the impact of landuse and climate change on hydrology using GIS, remote sensing and hydrologic / hydraulic / crop growth models with experience of over 20 years. He has published over 35 scholarly articles in reputed international journals. He received the Young scientist award at the 2013 International SWAT conference at Toulouse, France for his contribution in the development of algorithms for the SWAT model. He is one of the coordinators involved in the development of the Ganga River Basin Management Plan and is the lead investigator in the development of a hydrological flow health condition report for the entire Ganga River Basin. Balaji Narasimhan was also a Member of “Think Tank” for development of Water Resources Information System (WRIS), Ministry of Water Resources, Govt. of India. He was involved in a large team project to develop a flood forecasting system for Chennai city, following the floods of 2015, funded by the Principal Scientific Advisor, Govt. of India.
Dr. Bimlesh Kumar is currently a Professor at the Department of Civil Engineering, Indian Institute of Technology Guwahati, Guwahati. He obtained his B.E. (Civil Engineering) from Muzaffarpur Institute of Technology Muzaffarpur, Bihar, and M.E. and Ph.D. from the Indian Institute of Science, Bangalore, Bangalore. His major areas of research interests include river hydraulics and sediment transport. He has published more than 100 papers in respected international journals. Dr. Bimlesh Kumar received the R. J. Garde research award in 2015.
Dr. Ajey Kumar Patel is currently an Assistant Professor at Department of Civil Engineering, National Institute of Technology, Warangal. He obtained his B.Tech (Civil Engineering) from Harcourt Butler Technological Institute (HBTI), Kanpur; M.Tech (Environmental Engineering) from Indian Institute of Technology Roorkee, Roorkee; Ph.D. from the Indian Institute of Science, Bangalore, Bangalore. Ajey Kumar Patel is an Environmental Engineer with expertise in modelling surface aeration system including both experimental and CFD models, urban flood modelling, water hammer analysis and water distribution network analysis. He has published over 30 papers in various peer reviewed journals and international conferences.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.48 | £ 42.48 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.