Innovation and Sustainability in Civil Engineering: Shaping Tomorrows Infrastructure Volume 3
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2888654123
This book encapsulates the intellectual rigor and cross-disciplinary collaboration showcased at a global forum dedicated to advancing the understanding and application of geotechnical systems in sustainable infrastructure development. Proceedings of the 1st International Conference on Innovations and Sustainability in Civil Engineering: Shaping Tomorrow’s Infrastructure (ISCESTI—2025), held from May 14–16, 2025, at the National Institute of Technology (NIT) Patna, present a compelling compilation of pioneering research, emerging technologies, and sustainable practices in the field of geotechnical engineering.
It addresses a broad spectrum of contemporary issues, from ground improvement techniques and geosynthetics to the impacts of climate change on soil behavior and foundation design.
The contributions explore innovative approaches to soil stabilization, earthquake geotechnics, underground construction, and slope stability analysis, integrating field investigations, laboratory experimentation, and advanced numerical modeling. Particular emphasis is placed on eco-friendly solutions such as bio-mediated ground improvement, reuse of industrial waste materials in geotechnics, and the development of resilient and adaptive foundation systems.
This book also highlights the role of digital and data-driven technologies—such as machine learning, remote sensing, and geotechnical instrumentation—in enhancing subsurface characterization, predictive modeling, and risk mitigation strategies. Case studies and practical insights illustrate the application of geotechnical innovations in real-world infrastructure projects under challenging environmental and geohazard conditions.
Serving as a vital resource for geotechnical engineers, researchers, academicians, and infrastructure policymakers, this book provides actionable frameworks and future-oriented solutions to address the evolving demands of urbanization, climate adaptation, and sustainability. It positions geotechnical engineering at the forefront of building resilient, safe, and environmentally responsible infrastructure for the generations to come.
Dr. Shiv Shankar Kumar is an assistant professor in the Department of Civil Engineering at National Institute of Technology Patna, Bihar. He has completed his Ph.D. in Geotechnical Engineering from IIT Guwahati in 2018, where his research focused on the dynamic response of soils subjected to seismic excitations, utilizing cyclic triaxial testing. He also holds a Master of Technology in Geotechnical Engineering from IIT Guwahati and a B.Sc. in Civil Engineering from Muzaffarpur Institute of Technology, Bihar. His thrust area of research is Foundation Engineering, Earthquake Geotechnical Engineering, Soil-Structure Interaction, and Ground Improvement Techniques.
Dr. Kumar has an impressive publication record with numerous journal articles, book chapters, and conference papers published in renowned journals such as the Indian Geotechnical Journal, Soil Dynamics and Earthquake Engineering, and International Journal of Geo-engineering. His research has significantly contributed to understanding soil behavior under seismic loads and developing site-specific ground response models, especially for regions like Bihar and Northeast India. His expertise encompasses advanced testing techniques, including cyclic triaxial tests, shake table experiments, and surface wave analysis, which underpin his research on seismic site response, soil liquefaction, and ground improvement.
Dr. Anil Kumar Sharma is an assistant professor in the Department of Civil Engineering at the National Institute of Technology (NIT) Patna, India. He holds a Ph.D. in Geotechnical and Geoenvironmental Engineering from the Indian Institute of Science (IISc), Bangalore, where his research focused on the application of industrial by-products such as Class-F fly ash and ground granulated blast furnace slag (GGBS) for sustainable geotechnical improvements. He completed his B.Tech. in Civil Engineering from Cochin University of Science and Technology in 2009.
Dr. Sharma’s research interests lie in the domains of bio-geotechnics, ground improvement techniques, recycled construction materials, geosynthetics, slope stability, and environmental geotechnics. He has made significant contributions to sustainable construction practices, particularly in the stabilization of problematic soils using eco-friendly and waste-derived materials. His current research also explores microbial-induced calcite precipitation (MICP) for improving coal ash and other geomaterials.
Dr. Arindam Dey is currently an associate professor at Civil Engineering Department of IIT Guwahati. He is also an associate faculty and one of the founder members of the Center for Disaster Management and Research (CDMR), IIT Guwahati. He obtained his B.E. from Jadavpur University Kolkata, followed by M.Tech. and Ph.D. from IIT Kanpur. Before joining IIT Guwahati in 2011, he has been a post-doctoral fellow at the StreGa Laboratory, University of Molise, Campobasso, Italy. He is an active researcher in several streams of geotechnical engineering and disaster management including foundation engineering, geotechnical earthquake engineering, transportation geotechnics, soil-structure interaction, geophysical investigation, geosynthetics engineering, landslide geotechnology, computational geotechnics, as well as applications of AI/ML and soft computing in geotechnical engineering.
Prof. Varenyam Achal is a tenured professor and deputy dean of Undergraduate Studies at the Guangdong Technion—Israel Institute of Technology (GTIIT), China. He holds a Ph.D. in Environmental Engineering and an M.Sc. in Biotechnology from Thapar Institute of Engineering and Technology, India. With a research career spanning over 15 years, Prof. Achal is internationally recognized for his pioneering contributions in environmental biotechnology, bioremediation technologies, biomineralization, and biologically-inspired construction materials.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.95 | £ 41.95 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.