Innovation in Construction: A Practical Guide to Transforming the Construction Industry
Ghaffar, Seyed Hamidreza (Editor) / Mullett, Paul (Editor) / Pei, Eujin (Editor) / Roberts, John (Editor)
Language: English
Published by Springer, 2023
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 151.46
Quantity: 2 available
Add to basketItem description from seller
477 pages. 9.25x6.10x0.97 inches. In Stock.
Seller Inventory # x-3030958000
- Title
- Innovation in Construction: A Practical Guide to Transforming the Construction Industry
- Author
- Ghaffar, Seyed Hamidreza (Editor) / Mullett, Paul (Editor) / Pei, Eujin (Editor) / Roberts, John (Editor)
- Publisher
- Springer
- Publication year
- 2023
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 3030958000
- ISBN 13
- 9783030958008
- Item weight
- 0.73 kilograms
This book tackles the complex topic of implementing innovation and the successful application of advanced technology in the construction industry. It provides a practical guide for the transformation of the industry by detailing appropriate and effective implementation methods, required skill sets and structural changes necessary to facilitate the practical and innovative application of technology.
This book provides readers from both industrial and academic backgrounds with a comprehensive guide on transforming the construction industry with the efficient and effective implementation of technologies and modern methods of construction.
"Synopsis" may belong to another edition of this title.
About the Author
Dr Seyed Hamidreza Ghaffar: Dr Ghaffar is an Associate Professor in Civil Engineering. He is a Chartered Civil Engineer (CEng, MICE), a Member of the Institute of Concrete Technology (MICT) and a Fellow of Higher Education Academy (FHEA). He is the founder and director of Additive Manufacturing Technology in Construction (AMTC) Research Centre. The focus of AMTC is on valorising construction and demolition waste using materials science and 3D printing to achieve the circular economy goals of sustainable construction. Dr Ghaffar's research covers several construction materials, with a focus on the development of low carbon technologies suitable for new and retrofitting applications by combining materials sciences and innovative technologies. He has been successful in attracting research grants of circa £6 million on 8 projects funded by the Engineering and Physical Sciences Research Council, British Council, and the European Commission. Dr Ghaffar is the Associate Editor of the Journal of Results in Engineering (Elsevier).
Mr Paul Mullett: Paul’s role as Group Engineering and Technology Director is to drive forward and sustain the relentless pursuit of engineering excellence through the strategic application of transformative technologies, the identification and adoption of value-adding innovation and the development of staff skills necessary for the future of engineering across the global business. As an accomplished professional consultant with over 25 years' experience in a variety of technical and managerial roles, Paul has a proven track record of providing sound, considered advice to clients based on a practical, technically grounded approach to engineering with a commitment to quality and risk management. Paul is a Chartered Fellow of the Institution of Civil Engineers, a Fellow of the Chartered Institute of Arbitrators, and a registered Professional Simulation Engineer with NAFEMS.
Dr Eujin Pei: Eujin is Associate Dean ofthe College of Engineering, Design and Physical Sciences; and Programme Director for Product Design Engineering at Brunel University London. He is a Chartered Engineer (CEng), Chartered Technological Product Designer (CTPD) and Chartered Environmentalist (CEnv). He is a Fellow of the Institution of Engineering Designers and chairs the British Standards Institute BSI/AMT/8 for Additive Manufacturing; Convenor for the International Organization for Standardization ISO/TC261/WG4 for Additive Manufacturing Data and Design. Eujin leads the Additive Manufacturing and 4D Printing Research Group and Editor-in-Chief for the Progress in Additive Manufacturing Journal.
Mr John Roberts: John Roberts has worked as a technical integrator and collaborator at several of the UK’s top companies for 35 years; winning, designing, and delivering innovative projects. He is currently Chief Engineer for McGee Group’s construction engineering team as well as working as an independent consultant. John previously led and influenced at Laing O’Rourke, Atkins, and Arup, working in London, Los Angeles, Bangalore, and Hong Kong, taking consultant and contractor teams through all project stages from conception to construction. As civil and structural engineer, he has delivered major projects in sectors including aviation, rail, nuclear, water, offices, stadia, and public buildings. The evolving use of digital technology has been a continuing area of focus, starting with CAD and coding in the 1980s, through optimisation and BIM to ongoing involvement with Construction Technology today. The impact this evolution is having on teams and skills continues to be a key interest for him.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 25.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.