Informationssysteme Im Bauwesen 2: Anwendungen
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 4 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
Condition: New
Quantity: 4 available
Add to basketBuilding Information Modelling, BIM, stellt eine neue Arbeitsweise in der Kooperation, der Steuerung und dem Management von Bauprojekten dar. Multimodelle erhöhen die Qualität des koordinierten Zusammenarbeitens durch die Vernetzung der Informationen um eine weitere Größenordnung. Das Buch zeigt anhand von zwei realen Projekten, wie diese Methoden eingesetzt werden können und welche Werkzeuge hierzu nötig sind. Band 2 geht zunächst auf die Anwendung von BIM und Multimodellen in der Baustelleneinrichtungsplanung ein und zeigt auf, wie diese neue Arbeitsmethode neue Perspektiven auch für die Montage- und Logistiksimulation bietet und wie aus den verlinkten Informationen mit wenigen Schritten Simulationsmodelle generiert werden können. Es wird aufgezeigt, wie die digitale Vernetzung von Geometriedaten, Bauelementen, Kosten, Zeit und Vorgangsdaten Zusammenhänge erschließt und neue Transparenz bei Ausschreibung, Kosten- und Terminkalkulation, Disposition und Projektfortschrittsüberwachung schafft. Risikomanagement, eine weitere Anwendung, bekommt eine ganz neue Perspektive. Die Erfassung, Klassifikation und Verfolgung von Risiken kann wesentlich genauer und detaillierter erfolgen. Die Transparenz wird durch die neuen Visualisierungsmöglichkeiten erheblich gesteigert.
Prof. Dr.-Ing. Raimar Scherer leitet seit 1994 das Institut für Bauinformatik an der TU Dresden und war Initiator und Leiter des Projekts Mefisto. Schon 1987 als Professor für CAD und Zuverlässigkeitstheorie an der Universität Karlsruhe konzentrierte er sich auf Informations- und Wissensmanagement im Bauwesen und war 1989 bis 2001 aktiv in ISO 10303 STEP, wo der Grundstein für die Datenmodelle IFC und BIM gelegt wurde. 1994 gründete er die BIM Konferenzreihe European Conference on Product and Process Modelling, 1995 entstand einer der weltweit ersten BIM Server auf STEP Basis, 1999 der erste BIM Server auf IFC Basis, 2001 das erste BIM Labor, 2003 das erste mobile Bautagebuch für die Baustelle und 2013 stellte er das erste BIM Labor für energieeffiziente Gebäude vor. 2014 erhielt er für seine Verdienste in der Bauinformatik die Konrad Zuse Medaille.
Sven-Eric Schapke ist seit 2013 Business Development Manager BIM bei der think project! GmbH in München. Von 2001 bis 2013 beschäftigte er sich als wissenschaftlicher Mitarbeiter am Institut für Bauinformatik an der TU Dresden mit der Anwendung von Texttechnologien, Ontologien, Prozess- und Produktmodellen im Bauwesen und war Projektkoordinator des Projekts Mefisto. Er ist aktiv in BIM Arbeitsgruppen von buildingSMART, dem Verein Deutscher Ingenieure und der Reformkommission Großprojekte des Bundesministeriums für Verkehr und digitale Infrastruktur.
"About this title" may belong to another edition of this title.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books Puddle, New York, New York, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 3.00 | £ 5.26 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.