Information System Implementations
Language: English
Published by AuthorHouse, 2012
- Softcover
- New

Seller: PBShop.store UK, Fairford, GLOS, United KingdomPBShop.store UK
AbeBooks seller since June 11, 1999
Condition: New
£ 14.61
Quantity: Over 20 available
Add to basketItem description from seller
New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.
Seller Inventory # L0-9781468541151
- Title
- Information System Implementations
- Author
- Andries J Jacobs
- Publisher
- AuthorHouse
- Publication year
- 2012
- Condition
- New
- Binding
- PAP
- Language
- English
- ISBN 10
- 1468541153
- ISBN 13
- 9781468541151
- Item weight
- 250 grams
Excerpt. © Reprinted by permission. All rights reserved.
Information System Implementations: Using a Leadership Quality Matrix for Success
System Implementations, Gain Significant Momentum, An Insiders Guide to What you need to knowBy Andries J JacobsAuthorHouse
Copyright © 2012 Andries J JacobsAll right reserved.
ISBN: 978-1-4685-4115-1
Contents
Preface.....................................................................ixAcknowledgments.............................................................xiiiIntroduction................................................................xvChapter One Background to the Leadership Quality Matrix.....................3Chapter Two Stakeholders....................................................13Chapter Three Implementation Process........................................24Chapter Four Project Management.............................................33Chapter Five Process Standardization........................................41Chapter Six Project Transition..............................................47Chapter Seven Benefit Realization...........................................54Chapter Eight Troubleshooting...............................................60Chapter Nine Selection of Diagnostic Instruments............................69Conclusion..................................................................85Appendix A: A Step-by-Step Approach.........................................87Appendix B: Leadership Quality Matrix.......................................89Appendix C: Diagnostic Instruments..........................................95References..................................................................97Recommended Reading.........................................................99Index.......................................................................101About the Author............................................................103
Chapter One
Background to the Leadership Quality MatrixIn this chapter, I'll offer you a synopsis of the five most challenging system implementations in which I have participated to provide an understanding of not only my system-implementation experience and the challenges my various teams and I had to deal with, but also my insights into the system-implementation environments that have molded the modified leader in me and contributed to the development of the leadership quality matrix.
From a Modified Leader's Pen
Project 1. In May 1996, as director of marketing administration, I had just researched and developed for the fertilizer industry in South Africa a price-decision, support-system, functional-user specification, and was then assigned the task of client system-implementation lead for the northern region to lead a SAP R/3 version 4.0 h system implementation. The team delivered the SAP R/3 version 4.0 h implementation slightly outside the budget of US$3 million and the scheduled implementation period of twelve months. The configuration and implementation effort included the FI/CO (finance and corporate controlling), SD/MM (sales and materials management), PP (production planning), AM (asset management), and HR (human resources) modules. The infrastructure-technology platform, which at the time was leading-edge, consisted of HP hardware, Oracle database, and Unix operating system. The technical team implemented a three-tier development landscape.
The primary goal was to migrate from a corporate business system developed in-house—including finance, costing, and sales—to an integrated, process-driven enterprise resource planning (ERP) system. The results were remarkable: we reduced onetime plant-maintenance inventory by 30 percent, stock levels on a month-by-month basis by 15 percent, distribution costs by 10 percent, customer complaints by 2 percent, and administration cost by 1 percent.
As Winston Churchill once said, "I was strengthened by the critics' comments." Throughout the implementation, there was no lack of criticism, which in the end contributed to the molding of the modified leader in me and the understanding that leadership is a team effort rather than a management-only issue.
The team experienced a wide range of challenges related to people, process, and technology, including:
• Building an information-technology (IT) and systems team using the regional talent pool
• Dealing with poor IT infrastructure between regional headquarters and distribution and sales offices
• Transforming from a mainframe to a client-server environment
• Working with management's ability to design software for solution-supported business processes
• Getting regional alignment within the broader organization
• Developing processes and procedures that fit the real-time client-server environment
• Getting employees computer-literate enough to be trained in the new transaction-based client-server environment
• Motivating employees to execute transactions according to the flow and order of the business process
• Operating the business as an integrated unit (production, sales, procurement, maintenance, and finance)
• Restructuring administrative departments
• Avoiding putting the business at risk
• Getting system-output acceptance
Project 2. In August 2001, as information-system consultant and part of a high-performance management team, I performed a forward-looking assessment for the largest city in Canada of the value-for-money of the Information System Implementations: Using a Leadership Quality Matrix for Success process-control-system and IT components of the program-integration and coordination-services contract. When a carpool friend and colleague wassuddenlysidelinedbyamedicalcondition,Ialsotooktheresponsibility to lead the Lawson Enterprise Resource Planning conference-room pilot project.
I led the team with a focus on implementing a resource-related software solution, including the design of the selection criteria, software selection process, vendor qualification, and project recommendation and approval processes. The outcome was the rejection of the proposed system and selection of SAP R/3 version 4.6 d as the preferred ERP business system.
The centralized resource-related SAP R/3 implementation was for a global engineering-services company with forty-seven offices on all major continents around the world. Major offices were located in Australia, South Africa, the United Kingdom, Canada, the United States, and Chile. The team had an outstanding performance and implemented, within eight months, the FI/CO, SD/MM, PS (project systems), HR, ITS (Internet transaction services), and employee self-service modules. A company strategic direction drove the infrastructure-technology platform, consisting of Microsoft operating system, Compaq hardware, and SQL database. As a team, we developed, implemented, and managed the global operational-support infrastructure, including the help-desk environment. The support team implemented and managed the global training-program and learning-material-development environments. The support team consisted of sixty people, delivering training to three thousand employees globally.
The main focus of the project was to amalgamate three legacy systems (SAP R/3 version 2.2, Oracle, and SUN) and three different company business processes into a single SAP R/3 version 4.6 d system. The US$10 million implementation effort reduced time spent on reconciling and management of time sheets among various countries by 50 percent, invoice time out to customers in Australia from five to three working days, effort of reconciling intercompany accounts by 50 percent, and time spent on data transfer between various systems by 75 percent.
The system implementation challenged the team leadership's capability mainly in terms of environment, people, process, and to a lesser extent technical issues. The key factors derived from this implementation vastly contributed to the understanding of the importance and management of leadership qualities of all team members in reaching successful implementation completion. The team leadership skills and qualities were challenged by:
• The big-bang rollout approach
• The project being managed by me as a company employee, supported by a vendor-assigned system-implementation manager
• The incorporation of three different companies and three different systems into a single centralized system
• A management style and diverse business requirements that resulted in conflicting system requirements
• Differing backgrounds of project-team members from the United States, South Africa, and Australia
• The team's makeup of seven independent consultants, seven internal consultants, and seven business experts
• Business requirements, training, and rollout stretching across multiple time zones, religions, cultures, legislation, and languages
Project 3. In August 2003, as SAP technology manager, I led a team of SAP R/3 professionals supporting global engineering services of SAP R/3 systems in six countries and forty-seven offices around the world. Through leadership-quality development, the team improved the overall end-user satisfaction and system acceptance, reducing end-user complaints and response times by 40 percent. As I was spearheading the SAP R/3 project systems enhancement and improvement initiative, a good friend and IT colleague reached out and challenged my leadership qualities with a request to accept an assignment on an engineering, procurement, and construction management (EPCM) project for a leading aluminum client in Russia. The focus of the assignment was to implement, support, and maintain for three project offices around the country a state-of-the-art local-area network (LAN), office automation, and integrated-project-delivery software suite.
The US $15 million investment effort covered a LAN consisting of twenty servers and 340 end users. The server environment included a Web front end for access to database and applications, external portal to allow vendors access to project documentation, database, active directory, e-mail, application for project-delivery software suite, and documentation filing. The infrastructure technology platform consisted of HP and Dell hardware, SQL database, Windows 2000 operating system, and Windows NT networks. Information System Implementations: Using a Leadership Quality Matrix for Success
The four-month effort was about the implementation of a project-delivery suite of applications that included SAP R/3 version 4.6 c (time capturing and reporting), custom-developed cost control and progress management system, Primavera P3 (scheduling), document management system (OpenText LiveLink v9.0—document control and management), BMS's safety information management system, and Win Estimator (estimating). The support and maintenance team developed and implemented configuration, change-request, authorization, and disaster-recovery procedures. We also implemented and managed a support desk that enabled improved services, increased accuracy, increased availability of information, better management control, and improved management decision making.
When I stepped onto the international playing field, the importance of applying people-leadership qualities to following and maintaining agreed-upon business processes as a critical factor for system-implementation success dramatically impacted and molded the modified leader in me. The international business arena and the difficulty of mastering the local language put a new spin on team challenges, which included:
• IT and systems budget under client control
• No participation by implementation team in the budget-estimation effort
• IT infrastructure and accompanying administration team belonging to the client
• Part-time functional and technical support teams outside of project control
• Software systems not developed and tested to run in a client-infrastructure environment or support multiple joint-venture partner requirements
• Client requirements for process, function, and reporting not consistent with software design
• No business practices or supporting procedures agreed on before implementation and rollout
• EPCM management changes
• Difference in management style between locals and foreigners
• Failure by foreign management to fully understand the local legal requirements
Project 4. In June 2005, after a challenging fourteen months in Russia, I returned home to spend more time with family and took on the role of core-systems development lead, providing leadership and direction to the software development team and collaborating with the product-support team within the company to ensure that the required functionality and modifications were included in appropriate releases. In conjunction with product managers for the software vendor, we evaluated new technologies and products to determine the feasibility and desirability of incorporating their capabilities within the company core-system components.
Increased activity in the aluminum industry around the world raised the demand for system-implementation leadership skills, leading to me accepting the role of scoping, planning, and managing the implementation, support, and maintenance of a state-of-the-art integrated project-delivery software suite on an EPCM project for a leading aluminum client in Brazil.
The systems environment encompassed two locations, seven hundred end users, and twenty servers. The four-month, US$21 million system-implementation effort covered the implementation of a project-delivery software suite that included MARIAN (procurement, logistics, and materials management), SAPR/3Projects (time management, project-breakdown structure, and invoicing), custom-developed engineering progress management system, custom-developed cost control system, document management system (OpenText—document control and management), and Primavera P5 (project scheduling). As part of the integration effort, the task also included the preparation, planning, and management of the implementation, support, and maintenance of a BizTalk integration platform, transferring data among four project delivery systems: MARIAN, iPAS, APMS (client system), and EBS-Oracle finance (client system). This time around, the new buzzword and technology introduced to the project was the implementation of a Web-based voice-and-video-over-IP communication platform called AliceStreet Conference Center.
Coming off the Russia project and going on to a second international assignment brought me to a strong realization that in non-first-world countries, the perception and belief exists that control is a proof of leadership and is required above all to bring project success. With a couple of minor exceptions, it seemed as if the international project-driven system implementations had very much the same challenges:
• IT and systems budget under client control
• No participation by implementation team in the budget-estimation effort
• IT infrastructure and accompanying administration team belonging to the client
• Part-time functional and technical support teams outside of project control
• Software systems not developed and tested to run in a client-infrastructure environment or support multiple joint-venture partner requirements
• Client requirements for process, function, and reporting not consistent with software design
• No business practices or supporting procedures agreed on before implementation and rollout
• EPCM management changes
• Difference in management style between locals and foreigners
• Failure by foreign management to fully understand the local legal requirements
Project 5. In August 2008, with my major international project assignments behind me, it was time to focus on and reconcile with my family. My relationship with my wife, Anna was increasingly strained, and my two wonderful daughters were grown up and on their way to university. It was time for me to keep my family together. In doing so, I had to change direction, travel less, and bring us all together in Vancouver.
While providing system-implementation management services to a molybdenum-mining client in British Columbia and a gold-mining client in Nunavut, Canada, I was asked by the Vancouver office management—because of my experience in EPCM project-delivery systems, understanding of project-delivery business function, and ability to lead diverse teams—to lead the EPCM project-delivery-services team. The team of approximately sixty professionals provided project-delivery services to all the mineral and mining processing and renewable-power projects in the Vancouver office. I provided leadership to specialists in the following areas: project setup, accounting and time management (SAP R/3 version 4.6 c), capital cost estimating (Candy), planning and scheduling (Primavera P6), procurement and materials management (MARIAN), project cost control (custom-developed application), engineering progress (custom-developed application), and document management and control (OpenText LiveLink version 9.0). Special assigned tasks included optimization of business processes, procedures, computerized tools-that-work, and team and business-functions productivity.
After two major international assignments, I had hoped for a smooth ride and was pleasantly surprised by the variety and large number of challenges that the team faced in implementing and using the various project-delivery systems. The project-delivery-services team's leadership skills and qualities were challenged by:
• Project-delivery systems that were mainly developed for the mineral and mining processing industry and not for the renewable power industry
• Renewable power projects that were small in dollar value, stretching over a large time duration
• Conflicting reporting requirements between project managers and business management
• The perception of project managers that the corporate systems were designed for large EPCM projects
(Continues...)
Excerpted from Information System Implementations: Using a Leadership Quality Matrix for Successby Andries J Jacobs Copyright © 2012 by Andries J Jacobs. Excerpted by permission of AuthorHouse. All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
"About the title" may belong to another edition of this title.
PBShop.store UK
Fairford, GLOS, United Kingdom
AbeBooks seller since June 11, 1999
Shipping rates from United Kingdom to U.S.A.
| Item | 10 to 20 business days | 10 to 20 business days |
|---|---|---|
| First item | £ 3.29 | £ 3.29 |
Payment methods
Store description
**Please note our transit times are from the date of dispatch.** We first started out as “The Paperback Exchange,” a chain of physical bookstores where we would part exchange your beloved books for new stories to transport you to faraway places. However, as shopping started to evolve to online shops and marketplaces, we bid our stores goodbye to become “PBShop.” This transition has only allowed us to blossom as we now ship thousands of titles to book lovers across the globe. We pride ourselves in being a community of local book lovers which allows our passion and devotion to shine in everything we do. In 2020 we not only celebrated our 20th birthday but our 1st birthday as being completely employee owned after becoming an E.O.T in September 2019. We are proud to be different and embrace standing apart on a book mountain by working from a virtual inventory which allows us to provide thousands of books that may be difficult to get for your bookshelf or your studies. Working with a number of different suppliers allows us to explore other avenues such as puzzles, sheet music and even stationery so we really do have something for everyone. Life is about being versatile in all realms of existence. If this is your first purchase with us, or you are a returning customer, we would like to welcome you to the PBShop family, for there is no friend as loyal as a book. We are a company who put our customers at the centre of everything we do as we understand the importance of reading because once you learn to read, you will forever be free. There are a whole lot of things in this world of ours that we are yet to explore, which is why we will forever inspire curious minds.…
Specialty
Hardbacks, PaperbacksSeller's business information
Pbshop.co.uk
Unit 22 Horcott Industrial Estate, Horcott Road
Fairford, United Kingdom GL7 4BX
Terms of sale
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any unwanted order to us is borne by the buyer.
Should your order arrive damaged, not as advertised or faulty, we must be advised of this within 14 days of delivery. Please contact us so we can find the best solution for you.
Our Customer Care Team can be contacted by emailing alborders@paperbackshop.co.uk, or by calling our UK Office on +441285 712 917. We are available 9:00am till 5:30pm GMT Monday to Friday.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to PBShop.store UK, Fairford, United Kingdom, +44 1285 712917, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders are shipped from our UK warehouse. Delivery thereafter is between 4 and 14 business days. Please contact us if you have any queries about our services or products.