IP Routing Primer Plus
Language: English
Published by Sams Publishing, 2001
- Softcover
- Used

Seller: -OnTimeBooks-, Phoenix, AZ, U.S.A.-OnTimeBooks-
AbeBooks seller since March 9, 2023
Condition: Used - Good
£ 275.11
Quantity: 1 available
Add to basketItem description from seller
A copy that has been read, remains in good condition. All pages are intact, and the cover is intact. The spine and cover show signs of wear. Pages can include notes and highlighting and show signs of wear, and the copy can include "From the library of" labels or previous owner inscriptions. 100% GUARANTEE! Shipped with delivery confirmation, if you're not satisfied with purchase please return item! Ships via media mail.
Seller Inventory # OTV.0672322102.G
- Title
- IP Routing Primer Plus
- Author
- Osterloh, Heather
- Publisher
- Sams Publishing
- Publication year
- 2001
- Condition
- good
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 0672322102
- ISBN 13
- 9780672322105
IP Routing Primer Plus takes the reader on a methodical journey through the OSI model and shows the relationship of the different IP protocol suite. It gives the readers a "big picture view" design to equip them to use the protocols, or to prepare for a certification exam. Topics covered include a review of the OSI model as well as:
- IP Addressing;
- IP Operation;
- IP Routing;
- RIP;
- IGRP and EIGRP;
- OSPF.
In addition the appendices offer valuable reference materials concerning RFC's, ports, VLANs, and Subnetting.
"Synopsis" may belong to another edition of this title.
About the Author
Heather Osterloh has earned industry recognition as a Cisco Certified Network Associate (CCNA), Cisco Certified Network Professional (CCNP), Cisco Certified Design Associate (CCDA), Cisco Certified Design Professional (CCDP), Network Associate Sniffer trainer, Certified Network Expert (CNX) for Ethernet and Token Ring, Novell CNI/ECNE, Microsoft Certified Systems Engineer (MCSE), and Microsoft Certified Trainer (MCT). She also holds her Cisco Certified Internetworking Expert (CCIE), written portion and is currently waiting to take the practical lab exam.
Having spent the past 15 years training and consulting worldwide, Heather is an acknowledged leader in the networking industry. Author of one book, CCNA 2.0 Prep Kit 640-507 Routing and Switching, and of several popular Microsoft, Cisco, and Novell video series geared towards the busy professional, Heather continues to produce material that helps educate people about the world of networking. Heather also has lectured at the University of California, Berkeley; NetuCon's NetWare User Conference in San Jose; and the University of Puerto Rico; and was president of IT Academy, LLC for three years.
Heather lives in Northern California with her husband Kirk and her dogs, Cocoa and Kato.
"About the title" may belong to another edition of this title.
-OnTimeBooks-
Phoenix, AZ, U.S.A.
AbeBooks seller since March 9, 2023
Shipping rates within U.S.A.
| Item | 3 to 8 business days | 2 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 3.01 |
Payment methods
Specialty
Used books of all typesSeller's business information
BookDrop LLC
601 S 54th Ave, STE 101
Phoenix, AZ U.S.A. 85043
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to -OnTimeBooks-, Phoenix, Arizona, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.