Hydropower Project EPC Contract Project Management Theory and Practice
Language: English
Published by China Water Power Press Pub. Date :2011-02-01, 2011
- Softcover
- New

Condition: New
£ 56.78
- Bank Wire Transfer
- Paypal
Quantity: 10 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pages Number: 207 Publisher: China Water Power Press Pub. Date: 2011-02-01. Hydropower Project EPC Contract Project Management Theory and Practice from the status of the development of general contracting and development of hydropower projects of practical significance to general contracting. design-leading EPC project management and hydropower projects. hydropower The total project EPC contractor and the contents of the main management tasks. the owners and general contractors hydropower project under Asymmetric Information EPC project schedule of a quality control decision-making and optimal contract design theory and method. the total project hydropower project EPC contractor business risk assessment method. under the influence of various risk factors EPC project cost hydropower project risk analysis. based on the visual simulation of hydroelectric engineering EPC project schedule control. considering the interest rates and price rises under the influence of a risk target of Investment Fuzzy EPC project schedule optimization method. the total hydropower project EPC contract project management information integration. Kunming Hydropower Investigation and Design Institute for EPC Turnkey Project Management of specific control procedures. Malutang Phase II Hydropower Project management practices and other aspects of contracting a more systematic hydropower projects are introduced EPC Turnkey Project Management Theory and Practice. Hydropower Project EPC Contract Project Management Theory and Practice for general contracting in the Water Resources and Hydropower project owners. general contractors. subcontractors. supervision. and related Management to read. but also for teachers and students refer to relevant professional colleges . Contents: Preface Introduction Chapter 1 Introduction 1.1 Classification and general contracting of construction projects in China 1.2 Development of management system development and general contracting status of hydropower development of hydropower projects in China 1.3 EPC 1.3.1 Significance of the traditional management of hydropower projects disadvantages 1.3.2 Development of Hydropower Project 1.4 Significance of EPC research status issues 1.4.1 Overview and general contract management on the basic theory of general contractor on the project 1.4.2 Cost and schedule control of 1.4.3 on the total Contract Project Quality Management 1.4.4 Information Integration on the Contract Project Management 1.4.5 Project general contractor on the study of risk issues 1.4.6 1.5 book Chapter 2 to design hydropower projects as the leading EPC project management model 2.1 Introduction 2.2 The hydropower project EPC general contract management model hydropower project 2.2.1 Definition 2.2.2 EPC Contract EPC turnkey projects and hydropower project construction program 2.2.3 general contractor for the design of units of the hydropower project management 2.2 EPC .4 relevant departments of the general contractor relationship with the external 2.3 units of the general contractor for the design of the hydropower project EPC project management organizational structure and duties of the hydropower project 2.3.1 Organizational Structure 2.3.2 EPC project management and hydropower projects in the EPC project management organization 2.4 square duties to carry out the design as the leading EPC hydropower projects the need for and advantages of general contracting design-build 2.4.1 Trends 2.4.2 to design hydropower projects as the leading EPC contractor to carry out the necessity to design as the leading 2.4.3 hydropower project the advantages of EPC 2.5 EPC EPC project hydropower project owners manage the contents of the EPC hydropower projects and tasks 2.5.1 main content owners to manage the project 2.5.2 IndustryFour Satisfaction guaranteed,or money back.…
Seller Inventory # F12654
- Title
- Hydropower Project EPC Contract Project Management Theory and Practice
- Author
- CAI SHAO KUAN DENG
- Publisher
- China Water Power Press Pub. Date :2011-02-01
- Publication year
- 2011
- Condition
- New
- Binding
- paperback
- Language
- English
- ISBN 10
- 7508482182
- ISBN 13
- 9787508482187
"Synopsis" may belong to another edition of this title.
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.44 | £ 22.41 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
JS, China
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.