Hester, P: Systemic Decision Making
Book 22 of 27: Topics in Safety, Reliability and QualityPatrick T. Hester|Kevin MacG. Adams
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Winner of a 2018 TAA Textbook Excellence AwardProvides a holistic, cross-discipline method for problem structuring and assessmentAllows readers to gain a deeper understanding of complex, real-world problemsInvokes who, what, why,.
Seller Inventory # 458625764
This expanded second edition of the 2014 textbook features dedicated sections on action and observation, so that the reader can combine the use of the developed theoretical basis with practical guidelines for deployment. It also includes a focus on selection and use of a dedicated modeling paradigm – fuzzy cognitive mapping – to facilitate use of the proposed multi-methodology. The end goal of the text is a holistic, interdisciplinary approach to structuring and assessing complex problems, including a dedicated discussion of thinking, acting, and observing complex problems. The multi-methodology developed is scientifically grounded in systems theory and its accompanying principles, while the process emphasizes the nonlinear nature of all complex problem-solving endeavors. The authors’ clear and consistent chapter structure facilitates the book’s use in the classroom.
Dr. Patrick T. Hester is an Associate Professor of Engineering Management and Systems Engineering at Old Dominion University. Dr. Hester received a Ph.D. in Risk and Reliability Engineering from Vanderbilt University and a B.S. in Naval Architecture and Marine Engineering from the Webb Institute. He has been involved in research and consulting activities focused on systems thinking and decision analysis for diverse agencies including NIST, Naval Surface Warfare Center Dahlgren Division, NASA Langley Research Center, DHS, Sandia National Laboratories, NOAA, TRADOC, and General Dynamics National Steel and Shipbuilding Company. The results of his research have led to over one hundred publications in books, journals, and conferences. His research has been published in Systems Engineering, International Journal of System of Systems Engineering, International Journal of Operations Research, International Journal of Critical Infrastructures, and Journal of Defense Modeling and Simulation, among others. Dr. Hester is a Senior member of the Institute of Industrial and Systems Engineers (IISE), the Performance Management Association, and the International Society on Multiple Criteria Decision Making, a Board member of IISE’s Society of Engineering and Management Systems, and an Editorial Board Member of Systemic Practice and Action Research. He is a two-time Outstanding Author Contribution Award Winner from the Emerald Literati Network, and in 2016, he was named one of 20 “Engineering Management Professors You Should Know” by OnlineEngineeringPrograms.com.
Dr. Kevin Adams is a much sought after speaker and lecturer who specializes in providing systems-based solutions for complex real-world problems. He is the author of books on systemic thinking and non-functional requirements and has published over 50 articles in peer-reviewed journals and conference proceedings.
His presentations merge both philosophical and theoretical concepts from academia with the everyday problems being faced by businesses operating in the highly connected, fast-paced, global economy – providing effective and lasting solutions. Kevin’s systems-based solutions emphasize the importance of organizational stakeholders and the use of tailored methodologies for each and every solution.
His unique foundation for problem solving is based upon over 35 years of practical management experience. He has been able to integrate his first career in the United States Navy, where he served aboard three submarines and as a maintenance officer with second and third careers as a private-sector information technology consultant specializing in enterprise solutions and as an academic teaching in both engineering and management curriculums.
He is currently an adjunct associate professor at the University of Maryland University College and Virginia Wesleyan College. He volunteers on the Editorial Board of the Journal Systemic Practice and Action Research and as a Program Evaluator for the Accreditation Board for Engineering and Technology (ABET). Dr. Adams is a retired Navy submarine engineering duty officer, and a senior member of the Institute of Electrical and Electronics Engineers (IEEE).
Dr. Adams is a member of Tau Beta Bi (NJ Beta) - the National Engineering Honor Society, Keramos - the National Ceramic Engineering Honor Society, and Phi Kappa Phi, the nation's oldest, largest, and most selective collegiate honor society for all academic disciplines.
Dr. Adams hold engineering degrees from Rutgers University (B.S.), the Massachusetts Institute of Technology (dual M.S. degrees), and Old Dominion University (Ph.D.).
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.90 | £ 41.90 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.