Handbook of Maintenance Management and Engineering
Mohamed Ben-Daya
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
Condition: New
Quantity: 1 available
Add to basketDruck auf Anfrage Neuware - Printed after ordering - To be able to compete successfully both at national and international levels, production systems and equipment must perform at levels not even thinkable a decade ago. Requirements for increased product quality, reduced throughput time and enhanced operating effectiveness within a rapidly changing customer demand environment continue to demand a high maintenance performance. In some cases, maintenance is required to increase operational effectiveness and revenues and customer satisfaction while reducing capital, operating and support costs. This may be the largest challenge facing production enterprises these days. For this, maintenance strategy is required to be aligned with the production logistics and also to keep updated with the current best practices. Maintenance has become a multidisciplinary activity and one may come across situations in which maintenance is the responsibility of people whose training is not engineering. This handbook aims to assist at different levels of understanding whether the manager is an engineer, a production manager, an experienced maintenance practitioner or a beginner. Topics selected to be included in this handbook cover a wide range of issues in the area of maintenance management and engineering to cater for all those interested in maintenance whether practitioners or researchers. This handbook is divided into 6 parts and contains 26 chapters covering a wide range of topics related to maintenance management and engineering.
Seller Inventory # 9781447157625
Dr Mohamed Ben-Daya has been a professor in the Department of Systems Engineering at King Fahd University of Petroleum and Minerals in Dhahran, Saudi Arabia, since 1999. He gained his PhD in Operations Research in 1988 from Georgia Institute of Technology, USA, where he also gained his MSc in 1984. Dr Ben-Daya’s research interests are: mathematical programming; production and inventory control; scheduling; and maintenance engineering and quality control.
Dr Salih O. Duffuaa has been a professor in the Department of Systems Engineering at King Fahd University of Petroleum and Minerals in Dhahran, Saudi Arabia, since 1994. His research interests include: mathematical modelling; network flow; mathematical programming; quality assurance and control; maintenance engineering; and management optimization of quality and maintenance systems. Dr Duffuaa gained his PhD in Operations Research in 1982 from the University of Texas at Austin, USA.
Dr Abdul Raouf has been a professor at the Institute of Management and Technology, University of Management and Leadership in Lahore, Pakistan, since 2000. He gained his PhD from the University of Windsor.
Dr Jezdimir Knezvic established the self-financing centre for Management of Industrial Reliability, Cost and Effectiveness (MIRCE) at Exeter University in 1991, where he is still a professor. He has contributed to over 300 publications worldwide including books, papers and reports. Dr Knezvic gained his Bachelors degree, Masters degree and PhD from the University of Belgrade.
Dr Daoud Ait-Kadi has been a professor in the Department of Mechanical Engineering at the Université Laval, Sainte-Foy, Quebec, since 1990. He gained his PhD from the Université de Montréal in 1985. Dr Ait-Kadi’s research interests include: design and control of production systems; optimization of themaintenance and reliability systems subject to random failures; optimization of a system’s life cycle; development of advanced technologies for the design and control of supply chains in a probabilistic context; optimization of validation texts for the reliability of innovative systems; and reliability.
"About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 30 to 40 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 56.32 | £ 64.88 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.