Handbook Factory Planning and Design
Hans-Peter Wiendahl
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
Condition: New
Quantity: 1 available
Add to basketDruck auf Anfrage Neuware - Printed after ordering - This handbook introduces a methodical approach and pragmatic concept for the planning and design of changeable factories that act in strategic alliances to supply the ever-changing needs of the global market.In the first part, the change drivers of manufacturing enterprises and the resulting new challenges are considered in detail with focus on an appropriate change potential.The second part concerns the design of the production facilities and systems on the factory levels work place, section, building and site under functional, organisational, architectural and strategic aspects keeping in mind the environmental, health and safety aspects including corporate social responsibility.The third part is dedicated to the planning and design method that is based on a synergetic interaction of process and space. The accompanying project management of the planning and construction phase and the facility management for the effective utilization of the built premises close the book.The AuthorsProf. em. Dr.-Ing. Dr. mult. h.c. Hans-Peter Wiendahl has been director for 23 years of the Institute of Factory planning and Logistics at the Leibniz University of Hannover in Germany.Prof. Dipl.-Ing. Architekt BDA Jürgen Reichardt is Professor at the Muenster school of architecture and partner of RMA Reichardt - Maas - Associate Architects in Essen Germany.Prof. Dr.-Ing. habil. Peter Nyhuis is Managing Director of the Institute of Factory Planning and Logistics at the Leibniz University of Hannover in Germany.
Seller Inventory # 9783662463901
This handbook introduces a methodical approach and pragmatic concept for the planning and design of changeable factories that act in strategic alliances to supply the ever-changing needs of the global market.
In the first part, the change drivers of manufacturing enterprises and the resulting new challenges are considered in detail with focus on an appropriate change potential.
The second part concerns the design of the production facilities and systems on the factory levels work place, section, building and site under functional, organisational, architectural and strategic aspects keeping in mind the environmental, health and safety aspects including corporate social responsibility.
The third part is dedicated to the planning and design method that is based on a synergetic interaction of process and space. The accompanying project management of the planning and construction phase and the facility management for the effective utilization of the built premises close the book.
The Authors
Prof. em. Dr.-Ing. Dr. mult. h.c. Hans-Peter Wiendahl has been director for 23 years of the Institute of Factory planning and Logistics at the Leibniz University of Hannover in Germany.
Prof. Dipl.-Ing. Architekt BDA Jürgen Reichardt is Professor at the Muenster school of architecture and partner of RMA Reichardt – Maas – Associate Architects in Essen Germany.
Prof. Dr.-Ing. habil. Peter Nyhuis is Managing Director of the Institute of Factory Planning and Logistics at the Leibniz University of Hannover in Germany.
Univ.-Prof. Dr.-Ing. Dr. h.c. mult. Hans-Peter Wiendahl, born in 1938, studied mechanical engineering at the RWTH Aachen University, Germany. After studies at MIT and Cambridge, he completed his PhD in 1970 and his habilitation in 1972 at RWTH Aachen. Later he transferred over to the industry, heading first the Department for Planning and Quality at Sulzer Escher Wyss in Ravensburg and since 1975, their department of paper machinery design and technology. In 1979 he was appointed as a professor at the Leibniz University of Hannover and became the director of the university’s Institute of Production Systems and Logistics (IFA). He led the institute until 2003. From 1988 to 1992 Professor Wiendahl was also the vice-president of the Leibniz University of Hannover. From 1988 to 2007 he was a managing partner of the Institute for Integrated Production Hannover (IPH).
Prof. Dipl.-Ing. BDA architect Jürgen Reichardt is a professor at the msa, muenster school of architecture and partner of the RMA Reichardt - Maas - Associated Architects in Essen.
Univ.-Prof. Dr.-Ing. habil. Peter Nyhuis, born in 1957, studied mechanical engineering at the Leibniz University of Hannover, Germany. He completed his PhD at the university’s Institute of Production Systems and Logistics (IFA) in 1991 and his habilitation there in the field of production logistics in 1999. In the same year, he began working as a project manager and partner at Siemens SPLS Supply Chain Consulting in Munich. Since 2003, he has been appointed both as a professor for Production Systems, Logistics and Work Sciences as well as the director of the Institute of Production Systems and Logistics at the Leibniz University of Hannover. Since 2008 he is a managing partner of the Institute for Integrated Production Hannover (IPH). Professor Nyhuis is the author of numerous book contributions and articles on manufacturing and production planning and control, Logistic Operating Curves, shortening setup
times and procurement logistics."About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 7 to 10 business days | 5 to 7 business days |
|---|---|---|
| First item | £ 33.88 | £ 39.41 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.