Handbook for Designing Cement Plants
Language: English
Published by BS Publications, 2021
- Hardcover
- New

Condition: New
£ 244.66
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. KlappentextrnrnThe first Edition of the book came out in 2008. It covered all aspects of Designing Cement Plants- mainly Dry Process Cement Plants with 6 stage Preheaters and Calciners, Vertical Mills, Electro Static Precipitators and various au.
Seller Inventory # 491823399
- Title
- Handbook for Designing Cement Plants
- Author
- Deolalkar, S P
- Publisher
- BS Publications
- Publication year
- 2021
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 9389974429
- ISBN 13
- 9789389974423
- Edition
- 2nd Edition
The first Edition of the book came out in 2008. It covered all aspects of Designing Cement Plants- mainly Dry Process Cement Plants with 6 stage Preheaters and Calciners, Vertical Mills, Electro Static Precipitators and various auxiliary machineries as were prevalent then.
The base size for various workouts was 3000 TPD as was prevalent then.
It has begun to dawn on Cement Industry that it was responsible for emitting 5 % of the most common greenhouse gas - CO2. Cement Industry and Cement Plant and Process Designers began to apply their minds to make - GREEN Cement. - which emitted greenhouse gas in much less quantities by making blended cements, using alternate fuels and by recovering waste heat. Mr. Deolalkar's book 'Designing Green Cement Plants' dealing with these aspects came out in 2013.
Cement Industry was also growing in size simultaneously and the base size of 3000 TPD has been replaced by cement plants of + 10000 TPD or + 3mtpa capacity cement plants, requiring sea changes in machinery used therein.
This Second Edition of the Handbook includes all aspects of the basic concepts dealt with in the Handbook but also includes aspects of making green cement. The base capacity is now 10000 TPD. Therefore it has been named Handbook for Designing Green Cement Plants.
This book will also be found to be very useful to the Cement Industry.
Author's two books mentioned above have been included in the top 20 books related to Cement Industry in the World.Contents:
Section - 1 Basics
Section - 2 Machinery Used in Making cement
Section - 3 Technoeconomic Feasibility Studies
Section - 4 Civil Design and Construction
Section - 5 Electricals and Instrumentation
Section - 6 Layouts and Detailed Engineering
Section - 7 Selecting and Ordering Machinery
Section - 8 Sustainable Development
Section - 9 Web Pages
Section 10 - Sources
Section 11 - Recommended Reading
"Synopsis" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.02 | £ 41.02 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.