Guide to JCT Intermediate Building Contract 2024 (Paperback)
Language: English
Published by RIBA Publishing, London, 2025
- Softcover
- New

Seller: Grand Eagle Retail, Bensenville, IL, U.S.A.Grand Eagle Retail
AbeBooks seller since October 12, 2005
Item description from seller
Seller Inventory # 9781915722799
- Title
- Guide to JCT Intermediate Building Contract 2024 (Paperback)
- Author
- Sarah Lupton
- Publisher
- RIBA Publishing, London
- Publication year
- 2025
- Condition
- new
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1915722799
- ISBN 13
- 9781915722799
- Edition
- 5th or later Edition
Guide to the JCT Intermediate Building Contract 2024 is a must-have resource for architects and construction professionals navigating the latest JCT Intermediate Building Contract (IC and ICD). This updated edition provides clear, practical guidance on key provisions, procedures and conditions, making it essential for both everyday use and on-site problem-solving.
Organised by topic, it offers clarity on the obligations of all parties, highlighting crucial contractual updates and issues commonly encountered during a project.
Key updates in the 2024 edition:
- In-depth analysis of the JCT Intermediate Building Contract 2024, covering key revisions.
- Legislative updates, including the Building Safety Act, Building Regulations Part 2A and Procurement Act 2023.
- Case law coverage, addressing topics such as concurrent delay, right to suspend, practical completion, liquidated damages and more.
- Comparative insights with other JCT contracts, as well as NEC4 and RIBA Building Contracts.
- New figures and tables, enhancing clarity and usability.
Whether you're an experienced professional or preparing for exams, this guide provides the insights and analysis needed to navigate JCT contracts with confidence. Designed for ease of reference, it’s an essential tool for staying informed and compliant in today's evolving construction landscape.
"Synopsis" may belong to another edition of this title.
About the Author
Professor Sarah Lupton holds a personal chair at the Welsh School of Architecture and is a partner at Lupton Stellakis. She lectures widely on construction law and serves as arbitrator, adjudicator and expert witness. Sarah represents the RIBA on the JCT Drafting Sub-Committee and is the author of books on construction law, including the JCT and RIBA standard form contracts. She is a member of the CIC Liability Panel, and has chaired the Panel for over ten years. Sarah has authored Design Liability in Construction *and co-authored *Which Contract? with Manos Stellakis.
Manos Stellakis is a partner at Lupton Stellakis and teaches at several architecture schools. He is External Examiner at Queens University Belfast and APEAS. He has held visiting academic roles, including Distinguished Visiting Fellow at the Welsh School of Architecture. Manos has served on various RIBA committees and co-authored several books with Sarah Lupton, including Which Contract? and the Through the Legislation Maze series on energy conservation and health and safety.
"About the title" may belong to another edition of this title.
Grand Eagle Retail
Bensenville, IL, U.S.A.
AbeBooks seller since October 12, 2005
Shipping rates within U.S.A.
| Item | 6 to 14 business days | 6 to 16 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Payment methods
Seller's business information
APOLLO ONLINE CORP.
605 Geddes Street
Wilmington, DE U.S.A. 19805
Terms of sale
We guarantee the condition of every book as it¿s described on the Abebooks web sites. If you¿ve changed
your mind about a book that you¿ve ordered, please use the Ask bookseller a question link to contact us
and we¿ll respond within 2 business days.
Books ship from California and Michigan.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Grand Eagle Retail, Bensenville, Illinois, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. All books within the US ship free of charge. Delivery is 4-14 business days anywhere in the United States.
Books ship from California and Michigan.
If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.