Guide to Good Practice in the Management of Time in Major Projects: Dynamic Time Modelling
Language: English
Published by Wiley-Blackwell, 2018
- Softcover
- New

Seller: Books Puddle, New York, NY, U.S.A.Books Puddle
AbeBooks seller since November 22, 2018
Condition: New
£ 89.43
Quantity: 3 available
Add to basketItem description from seller
Seller Inventory # 26375526793
- Title
- Guide to Good Practice in the Management of Time in Major Projects: Dynamic Time Modelling
- Author
- CIOB (The Chartered Institute Of Building)
- Publisher
- Wiley-Blackwell
- Publication year
- 2018
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1119428394
- ISBN 13
- 9781119428398
- Edition
- 2nd Edition
A practical treatise on the processes and standards required for the effective time management of major construction projects
This book uses logical step-by-step procedures and examples from inception and risk appraisal―through design and construction to testing and commissioning―to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion.
Guide to Good Practice in the Management of Time in Major Projects―Dynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling.
- Provides guidance for the strategic management of time in construction and civil engineering projects
- Demonstrates how to use a dynamic time model to manage time pro-actively in building and civil engineering projects
- Sets out processes and standards to be achieved ensuring systematic documentation and quality control of time management
- Integrates with the CIOB major projects contract
Guide to Good Practice in the Management of Time in Major Projects―Dynamic Time Modelling, 2nd Edition is an ideal handbook for project and program management professionals working on civil engineering and construction projects, including those from contractors, clients, and project management consultants.
"Synopsis" may belong to another edition of this title.
About the Author
The Chartered Institute of Building is at the heart of a management career in construction. It is the world's largest and most influential professional body for construction management and leadership, with a Royal Charter to promote the science and practice of building and construction for the benefit of society. With over 46,000 members worldwide, the CIOB is the international voice of the building professional.
"About the title" may belong to another edition of this title.
Books Puddle
New York, NY, U.S.A.
AbeBooks seller since November 22, 2018
Shipping rates within U.S.A.
| Item | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 2.95 | £ 5.17 |
Payment methods
Store description
Specialty
South Asian and South East Asian Culture, Religion, Art etcSeller's business information
PLETOS INC
6931 51st Avenue, WOODSIDE
Woodside, NY U.S.A. 11377
Terms of sale
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books Puddle, New York, New York, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.