Geotechnical Engineering for the Preservation of Monuments and Historic Sites III
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Renato Lancellotta is Emeritus Professor of Geotechnical Engineering at Politecnico di Torino. From 2014 to 2021 he is has been Chairman of the International Commettee on Preservation of Historic Sites and Monuments (TC301) and in 2012 h.
Seller Inventory # 733930899
This book contains the invited lectures presented at the 3th International Symposium on Geotechnical Engineering for the Preservation of Monuments and Historic Sites (IS NAPOLI 2022, Naples, Italy, 22-24 June 2022). It collects the opening address, the third Kerisel Lecture, four keynote lectures and eleven panel lectures, and provides a broad impression of 1. the current state of knowledge and 2. the techniques used worldwide for the preservation of built heritage. When confronted with structures relevant to local and global history, there is only one way to select the best possible conservation solution: the multidisciplinary approach. Therefore, the invited speakers have been selected with different pertinent skills, to represent this complexity from the points of view of geotechnical engineers, structural engineers, architects and conservation experts.
The book will be useful to researchers, practitioners, administrations and all those working or interested in the preservation of built heritage.
Renato Lancellotta is Emeritus Professor of Geotechnical Engineering at Politecnico di Torino. From 2014 to 2021 he is has been Chairman of the International Commettee on Preservation of Historic Sites and Monuments (TC301) and in 2012 he delivered the XI Croce Lecture.
He is editor of the Book Series on Built Heritage and Geotecnics, CRC Press, Taylor and Francis group, London and Editor in chief of Rivista Italiana di Geotecnica. Professional experience refers to geotechnical studies for the preservation of historical monuments, including the Leaning Tower of Pisa, the Ghirlandina Tower and the Cathedral of Modena, the S.Stefano church in Bologna, the Campanile of Giotto in Florence, the Garisenda tower in Bologna.
Carlo Viggiani is Emeritus Professor at the University of Napoli Federico II where he had been teaching Foundation Engineering from 1975 to 2009.
He is Author or Co-Author of 5 books and 230 technical papers; has been Editor of the Italian Geotechnical Journal; component of the Editorial Board of the Journal of Numerical and Analytical Methods in Geomechanics
He has been State of the Art Reporter at the ICSMFE in New Delhi, 1994 (Mitigation of Natural Hazards: Landslides and Subsidence) and at the ICSMGE in Osaka, 2005 (Pile foundations).
He has been Chairman of TC19 (later TC301) (Preservation of Monuments and Historic Sites) of the ISSMGE, and participated to the conservation of a number of monuments affected by geotechnical problem, including the Leaning Tower of Pisa.
Involved in the design and construction of earth dams, civil and industrial buildings, bridges, tunnels and underground constructions, stabilisation of landslides. Consultant for Italian Railways and Underground Transportation Systems in Rome, Napoli, Torino, Bologna, Firenze. Involved in the design of the suspension bridge over the Messina Straits.
Alessandro Flora is professor of geotechnical engineering at the University of Napoli Federico II (Italy). He has been visiting researcher at the University of Tokyo (Japan) in 1993 and visiting professor at the University of Rio Grande do Sul (Porto Alegre, Brazil) in 2008. He is chairman of TC301 (Preservation of Historic Sites) of ISSMGE, member of the Editorial Board of the Built Heritage and Geotechnics Books series (CRC press), Member of the editorial board of the Italian Geotechnical Journal (RIG), Italian representative in TC211 (Ground Improvement) of ISSMGE. He is co-author of a book on Jet Grouting (CRC Press), co-author of the Chapter on Foundations in the Encyclopedia of Engineering Geology (Springer), co-editor of a volume on Geotechnics and Heritage 2013 (CRC Press), co-editor of a volume on Geotechnics and Heritage: historic towers 2017 (CRC Press). He is author of more than 200 papers published on international journals and presented at international conferences, receiving some awards. He has been appointed Kerisel Lecturer in 2022, and has been invited to deliver Keynote or State of the Art Lectures at many international conferences around the world. He has been involved as geotechnical consultant in the design of many major works.
Filomena de Silva has deeply studied the effects of the dynamic soil-foundation structure interaction (SFSI) on the response of ideal structures and case-studies, through analytical tools and numerical simulations performed by following the sub-structure method and by modelling the full SFS system during her PhD under the supervision of prof. Francesco Silvestri,. She has been hosted by the Geotechnical Team of the Aristotle University of Thessaloniki (Greece) and worked with prof. Dimitris Pitilakis who has a deep experience on experiments on SFSI. She has again collaborated with him in the 2018 EU project Seismic Impedance for Soil-structure Interaction From On-site tests, SISIFO funded by the HORIZON2020-supported program SERA (Seismology and Earthquake Engineering Research Infrastructure Alliance for Europe). On such a topic she has been the co-supervisor of the M.Sc. thesis of Chiara Amendola, awarded with the prize on the application of geophysics to earthquake engineering, sponsored by the National Institutes OGS and CNR and dedicated to Marco Mucciarelli.
Thanks to her expertise on SFSI, she gained a fellowship at the University of Leeds to work on the effects of the soil on the seismic fragility of tunnels in the frame of the international EPSRC project Shaking Tunnel Vision, whose results were selected for the Geotechnique symposium in print 2019.
Lucia Mele is a Research Fellow at University of Napoli Federico II, Italy. In 2017 she started a PhD course in the framework of the European Project LIQUEFACT, focusing the attention on improving the basic understanding of liquefaction behaviour of sandy soils and studying several techniques to mitigate liquefaction risk. She mainly worked in laboratory, performing monotonic and cyclic (triaxial and simple shear) tests. She spent two months in Tokyo University (Japan), where she studied in depth the effect of non-saturation on liquefaction resistance. She took part to several conferences presenting the results of her research to scientific community.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.27 | £ 42.27 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.