Geotechnical Aspects of Underground Construction in Soft Ground
Sold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 1 available
Add to basketSold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
Condition: New
Quantity: 1 available
Add to basketNew Book. Shipped from UK. Established seller since 2000.
Seller Inventory # FT-9780415683678
Geotechnical Aspects of Underground Construction in Soft Ground comprises a collection of 118 papers, four reports on symposium themes, and four invited lectures presented at the seventh International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, held in Rome, Italy, 16-18 May 2011.
The symposium was organized by the Technical Committee TC28 “Underground Construction in Soft Ground” of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE). This is the latest in a series which began in New Delhi in 1994, and was followed by symposia in London (1996), Tokyo (1999), Toulouse (2002), Amsterdam (2005), and Shanghai (2008). The Rome symposium was organised by the Italian Geotechnical Society (AGI), under the auspices of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE) and the Italian Ministry for Public Works, and sponsored by various national and international companies.
Geotechnical Aspects of Underground Construction in Soft Ground includes contributions from 30 countries on research, design and construction of underground works in soft ground. The contributions cover:
- Construction, design, and measured performance of bored tunnels
- Physical and numerical modelling of deep excavations and bored tunnels
- Construction, design, and measured performance of deep excavations
- Design methods and predictive tools for deep excavations and bored tunnels
- Ground movements, interaction with existing structures and mitigation measures
- Activities of TC204 working groups
The general reports give an overview of the papers listed in the symposium’s technical sessions. The proceedings include the written version of the four invited lectures covering topics ranging from the geotechnical aspects of construction of the new Mexico City deep sewerage system (as a special contribution of TC214 “Soft Soils”), to the long-term settlement mechanisms of tunnels in Shanghai, the lessons learned from the deep excavations for the North-South Line in Amsterdam, and the evaluation of the effects of tunnel excavation on historical buildings, drawing on experience gathered during construction of subway line C in Rome.
Similar to previous editions, Geotechnical Aspects of Underground Construction in Soft Ground represents a valuable source of reference on the current practice of analysis, design, and construction of tunnels and deep excavations in soft ground. The book is particular aimed at academics and professionals interested in geotechnical and underground engineering.
"About this title" may belong to another edition of this title.
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to PBShop.store US, Springfield Gardens, New York, U.S.A., +44 1285 712917, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Books are shipped from our US or UK warehouses. Delivery estimates allow for delivery from either location.
| Order quantity | 7 to 14 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.