Geopolymer Concrete Structures With Steel and Frp Reinforcements : Analysis and Design
Language: English
Published by Woodhead Publishing, 2023
Series: Book 146 of 149 - Woodhead Publishing Series in Civil and Structural Engineering
- Softcover
- New

Seller: GreatBookPricesUK, Woodford Green, United KingdomGreatBookPricesUK
AbeBooks seller since January 28, 2020
Condition: New
£ 209.54
Quantity: Over 20 available
Add to basketSeller Inventory # 45036298-n
- Title
- Geopolymer Concrete Structures With Steel and Frp Reinforcements : Analysis and Design
- Author
- Crawley, Mohamed Elchalakani; Yang, Bo; Mao, Kuanhong; Pham, Thong
- Publisher
- Woodhead Publishing
- Publication year
- 2023
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 0443188769
- ISBN 13
- 9780443188763
- Series
- Book 146 of 149: Woodhead Publishing Series in Civil and Structural Engineering
Geopolymer Concrete Structures with Steel and FRP Reinforcements: Analysis and Design focuses on structural behavior, including the aspects of compression, bending strength and combined action of GPC members, with the book's content based on published studies over the last two decades. Geopolymer concrete (GPC) structural members reinforced with FRP reinforcement have some advantages in resisting forces compared to conventional concrete or steel tubular members. Among the most important are the high strength and bending stiffness, fire and impact performance and favorable, construction ability and durability.
To this end, there are no significant applications of these new structural elements worldwide, partly due to the lack of the understanding of their behavior and insufficient design provisions in different design manuals. This book, therefore, seeks to highlight their characteristics and future potential.
- Provides comprehensive, up-to-date advances on Geopolymer Concrete (GPC) reinforced with steel and FRP bars and stirrups construction with a summary of over 100 papers published in the last decade
- Compares the behavior and failure modes between Geopolymer Concrete (GPC) structures and Ordinary Portland Concrete (OPC) structures
- Explains important concepts such as bond, confinement, fracture of stirrups and buckling of FRP bars
- Includes an in-depth analysis of ultimate strength of GPC and OPC, considering governing failure modes
- Presents design examples following international standards, including North America ACI 440.1R-15, Canadian CAN/CSA S806, and Australian such as AS 3600
"Synopsis" may belong to another edition of this title.
About the Author
Dr Bo Yang is currently a full professor in the School of Civil Engineering, Chongqing University, China. He obtained his PhD in 2013 from the School of Civil & Environmental Engineering, Nanyang Technological University, Singapore. His expertise includes experimental tests and numerical modelling of steel and composite structures under progressive collapse scenarios. He serves as reviewers for several top international journals in structural engineering, such as Journal of Constructional Steel Research and Engineering Structures. He is listed in Stanford University 2020 list of the top 2% scientists in the world.
Mr Kuanhong Mao is a PhD candidate in the School of Civil Engineering, Chongqing University, China. At present, he is committed to develop new building materials. In addition, he specialises in experiments and numerical modelling of steel and composite structures.
Dr Pham BE, PhD is a Senior Lecturer at the School of Civil and Mechanical Engineering, Curtin University, Australia. He is ranked within the top 2% of researchers in the world in 2021 (one year measure). Pham has published 134 technical papers including 1 book chapter, 3 keynote papers, 105 peer-reviewed journal articles, and 25 conference papers. 9 of his publications have been listed as the most-cited papers in respective journals (SJR Q1). He co-chaired the 7th international conference on Protection of Structures against Hazards in Hanoi, Viet Nam. Pham is currently an elected committee member of Concrete Institute of Australia (CIA), WA. Pham’s research has been well regarded through half dozen research awards and recognitions. Pham as a chief investigator won five competitive research grants and many industrial projects, > $800k in total. He is an editorial board member of two international journals including International Journal of Protective Structures and Journal of Science and Technology in Civil Engineering.
"About the title" may belong to another edition of this title.
GreatBookPricesUK
Woodford Green, United Kingdom
AbeBooks seller since January 28, 2020
Shipping rates from United Kingdom to U.S.A.
| Item | 10 to 27 business days | 10 to 30 business days |
|---|---|---|
| First item | £ 15.00 | £ 15.00 |
Payment methods
Store description
Specialty
TradeBooksSeller's business information
Far Corner Europe Limited
19-20 Bourne Court, 19-20 Bourne Court
Woodford Green, United Kingdom IG8 8HD
Terms of sale
Company Name: GreatBookPricesUK
Legal Entity: Far Corner Europe Limited
Address: 19-20 Bourne Court, Southend Road, Woodford Green Essex, UK IG8 8HD
Registration #: 10691061, VAT GB307932304
Authorized representative: Danielle Hainsey
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to GreatBookPricesUK, Castle Donington, Derby, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Our warehouses across the globe are fully operational without substantial delays. We are working hard and continue to overcome the daily challenges presented by COVID-19. There have been reports that delivery carriers are experiencing large delays resulting in longer than normal deliveries to customers. We would like to apologize in advance if your item arrives later than the expected delivery due date.
Internal processing of your order will take about 1-2 business days. Please allow an additional 4-14 business days for Royal Mail delivery.