Geomagnetic Disturbances Impacts on Power Systems
Olga Sokolova
Sold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: Over 20 available
Add to basketSold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
Condition: New
Quantity: Over 20 available
Add to basketNew Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.
Seller Inventory # L1-9780367680862
Geomagnetic Disturbances Impacts on Power Systems: Risk Analysis & Mitigation Strategies provides a full risk assessment tool for assessing power systems confronted geomagnetic disturbances (GMDs) and specifies mitigation opportunities for various stakeholders.
“This book deals comprehensively with the threat of solar storms on the world’s power systems. It provides a context to GMDs with respect to other natural hazards, and describes methods to evaluate a particular grid’s risk factors in a straightforward fashion. This is extremely useful to power grid operators, as they are not experts in the field of space weather, but they must be able to deal with its impacts. This is the critical message of this extremely valuable book.”
– William A. Radasky, Ph.D., P.E., IEEE Life Fellow, Metatech Corporation, California USAAimed at risk engineers, policy-makers, technical experts and non-specialists such as power system operators, this book seeks to provide an insight into the GMD as a natural hazard and to perform the risk assessment of its potential impacts on the power systems as critical infrastructures. The reader gets familiar with how the Sun can endanger ground-based technological systems and the physics of solar activity manifestation on the Earth as Geomagnetically Induced Currents (GICs). The reaction of power systems to GMDs and mitigation strategies aiming at reducing and controlling the risks are then addressed. The GMD mitigation strategies, the power systems critical factors analysis, the high-risk zones identification and an estimation of economic loss, which is a valuable input for the (re)insurance sector, are also brought to the attention of the reader. Thereby, this book provides a full risk assessment tool for assessing power systems confronted with space weather risks.
Key features:
• Brings together interdisciplinary perspectives on the topic in one, cohesive book
• Practical guideline on mitigation actions for diverse users and even non-specialists
• Dealing comprehensively with the threat of geomagnetic disturbance on the worlds power systems
• Introducing unique methods to evaluate a particular system risk factors in a straightforward fashion
Authors
Olga Sokolova, Ph.D., is a risk analyst and electrical engineer with expertise in the domain of critical infrastructure risk assessment to natural catastrophes.
Nikolay Korovkin, Ph.D., is a full professor and head of Theoretic Electrical Engineering Department at Peter the Great Saint-Petersburg Polytechnic University (SPbPU).
Masashi Hayakawa, Ph.D., is an emeritus professor of the University of Electro-Communications, and also CEO of Hayakawa Institute of Seismo Electromagnetics, Co.Ltd.
Olga Sokolova, Ph.D., is a risk analyst and electrical engineer with expertise in the domain of critical infrastructure risk assessment to natural catastrophes. She develops structural risk-management tools towards a sustainable future which are accessible to the general public. Olga Sokolova has a record in raising awareness of emerging risks and opportunities brought to the society by infrastructure developments.
Nikolay Korovkin, Ph.D., is a full professor and head of Theoretic Electrical Engineering Department at Peter the Great Saint-Petersburg Polytechnic University (SPbPU). His research interests are inverse problems in electric circuits and electromagnetics, power control systems described by stiff equations, the problems of the earthquakes electromagnetic prediction, and the identification of the biological objects behaviour under the electromagnetic fields.
Masashi Hayakawa, Ph.D., is an emeritus professor of the University of Electro-Communications, and also CEO of Hayakawa Institute of Seismo Electromagnetics, Co.Ltd. His general interests are radio noises around the Earth, including plasma waves in the upper ionosphere/magnetosphere (generation and propagation of plasma waves), radio noise and related phenomena in the atmosphere related to lightning, EMC (Electromagnetic Compatibility), and radio noises from the lithosphere and seismic-associated atmospheric and ionospheric phenomena (for earthquake prediction).
"About this title" may belong to another edition of this title.
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to PBShop.store US, Springfield Gardens, New York, U.S.A., +44 1285 712917, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Books are shipped from our US or UK warehouses. Delivery estimates allow for delivery from either location.
| Order quantity | 7 to 14 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.