Geological Line Selection for the Qinghai-Tibet Railway Engineering
Language: English
Published by Springer Berlin Heidelberg, 2017
- Hardcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 82.36
Quantity: Over 20 available
Add to basketSeller Inventory # 151050520
- Title
- Geological Line Selection for the Qinghai-Tibet Railway Engineering
- Author
- Jincheng Li|Wenwu Chen|Zhengping Liu
- Publisher
- Springer Berlin Heidelberg
- Publication year
- 2017
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 3662555700
- ISBN 13
- 9783662555705
- Seller catalogs
- Mathematik/Naturwissenschaften/Technik/Medizin
"Synopsis" may belong to another edition of this title.
About the Author
Mr. Jin-Cheng Li, Vice President of China Railway First Survey & Design Institute Group, has been working as the Chief Engineer on the Qinghai–Tibetan railway construction project since 2000 and has accumulated substantial first-hand experience of railway routing in complicated geological environment on Qinghai–Tibetan plateau, such as railway routing in permafrost regions, active fault zones, meizoseismal areas, natural reserves, slope-geohazard regions, as well as geothermal, windy-sand, and snow drift hazard regions. He has several important publications to his name and has won a number of honors for his outstanding contributions to the construction of more than ten national key railway projects.
Selected Publications:
1. Jin-Cheng Li, Design of Access Tunnels for Guanjiao Super-long Tunnel, Modern Tunneling Technology, 46 (2009) 1-7
2. Jin-Cheng Li, Waterproofing and Drainage Measures Adopted in Guanjiao Super-long Railway Tunnel, Modern Tunneling Tec
hnology, 5 (2008) 65-713. Jin-Cheng Li, Frost Damages in Permafrost Regions along the Qinghai-Tibet Railway in 2001-2006:Investigation and Analysis, Journal of Glaciology and Geocryology, 30 (2008) 147-152
4. Jin-Cheng Li, Research on Geological Route Selection in Valley Zone between Semai-Dazhuca of Lhasa-Rikaze Railway, Journal of Railway Engineering Society, 1 (2008) 22-25
5. Jin-Cheng Li, Mutually Supportive Relationship between Engineering and Environment, Chinese National Geography, 2 (2004) 20-22
6. Jin-Cheng Li, Research on Route Selection Scheme of Lhasa-Rikaze Railway in Brahmaputra’s Canyon Area, Railway Investigation and Surveying, 5 (2007) 1-6
7. Jin-Cheng Li, A Summary for Engineering Geology in Guanjiao Super Long Railway Tunnel, Railway Investigation and Surveying, 6 (2007) 1-4
8. Jin-Cheng Li, Location Scheme Research for Rikaze Railway, Gansu Science and Technology, 24 (2008) 92-94
9. Jin-Cheng Li, Research on L
ocation of Geothermic Tunnel of Lhasa-Rikaze Railway, Journal of Railway Engineering Society, 4 (2011) 42-46Honors:
1. Qinghai-Tibetan railway project has won the outstanding award of National Science and Technology Progress Special Award in 2008. The chief engineer of Qinghai-Tibetan railway project, Mr. Jin-Cheng Li, was ranked as the second contributor. Award No. 2008-J-221-0-01-R022. The whole railway design from Golmud to Lhasa of Qinghai-Tibetan railway project has won the gold prize of national excellent project of ministry of railways in 2008. Mr. Jin-Cheng Li, was ranked as the first contributor.
3. The whole railway design from Golmud to Lhasa of Qinghai-Tibetan railway project has won the outstanding award of national excellent project of ministry of railways in 2007. Mr. Jin-Cheng Li, was ranked as the first contributor.
4. Technique on permafrost of Qinghai-Tibetan railway project has won the outstanding award of Chineserailway so
ciety in 2007. Award No. 2007-0665. The design of active protection of permafrost roadbed in Qinghai-Tibetan railway project has won the first prize of excellent design of China Railway Construction Corporation in 2007. Award No. SJ-2007-02-02
6. 1:2000 digital topographical map from Golmud to Lhasa of Qinghai-Tibetan railway project by aerial survey has won the bronze prize for national excellent project survey and design of ministry of railways in 2006. Mr. Jin-Cheng Li was ranked as the second contributor.
7. Mr. Jin-Cheng Li was awarded as the pacesetter of national science and technology 2008.
8. Mr. Jin-Cheng Li was awarded the certificate of special government allowances of the state council in 2007.
9. Mr. Jin-Cheng Li was awarded the certificate of national excellent scientific and technological worker in 2005.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.12 | £ 42.12 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.