GeoPractices Towards Sustainable Infrastructure, Volume 1
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 20-25 days. Print on Demand.
Seller Inventory # POD-393840
This book discusses the proceedings of the National Conference on GeoPractices for Sustainable Infrastructure (GeoPractices 2024), focusing on the sustainable aspects of geotechnical engineering practices, particularly in highway construction and related ground improvement techniques. It covers topics such as alternative and sustainable construction materials, processes, and design considerations for pavement construction and enhancing weak soils. The publication highlights advanced practices and developments, including the use of geosynthetics, bioremediation, and incorporating industrial byproducts to lower carbon footprint, preserve natural resources, and minimize waste generation. The book is intended to be a valuable resource for emerging researchers and industry professionals interested in advancing sustainable infrastructure.
Dr. Sireesh Saride is a Professor in the Department of Civil Engineering and Chairperson of the Greenko School of Sustainability at the Indian Institute of Technology Hyderabad. His expertise and research interests include pavement geotechnics, geosynthetics, recycled materials, and ground improvement. He obtained his B.Tech (Civil Engineering) from the JNTU College of Engineering, Kakinada, and earned his integrated Ph.D. from the Indian Institute of Science, Bengaluru. Before joining IIT Hyderabad, he was a post-doctoral research fellow-cum lecturer at the University of Texas at Arlington. Dr. Sireesh has published over 240 referred journals, conference articles, and technical reports. He is currently developing design guidelines for geosynthetic-reinforced flexible pavements and recycled materials. He has been awarded research proposals from the National Highway Authority of India (NHAI) and the National Technical Textiles Mission, Ministry of Textiles. He also leads a NHAI-funded Centre of Excellence on ‘Transportation Research and Innovation Hub (TRI-HUB) at IIT Hyderabad. He is a recipient of Australia Awards Fellowship 2023, Department of Foreign Affairs and Trade, Australian Government, and a recipient of JICA Fellowship 2024 under FRIENDSHIP 2.0 for new partnership, Japan International Cooperation Agency, Japan, among others. He is an Associate Editor for several journals of repute. He is a member of ASCE, ICE, TRB, International Geosynthetics Society, a life member of IRC, and a fellow of the Indian Geotechnical Society.
Dr. Hari Prasad Chennarapu is Associate Professor of Civil Engineering at Mahindra University with expertise in geotechnical engineering. He obtained Ph.D. from IIT Hyderabad in the geotechnical engineering domain. He has been actively involved in the research areas of soil-reinforcement, quality control of pavement layers with NDT devices, stabilization methods, and pavement geotechnics. He has published 25 publications in reputed Journals and Conferences. He got a patent grant on “An Apparatus for Measuring Transverse Pullout Resistance of a Reinforcing Element and Method Thereof.” He has been awarded research proposals from the Ministry of Textiles, CDRI and Mahindra University. He is presently serving as the Hon’s secretary of IGS Hyderabad chapter. Also, a life member of the Indian Geotechnical Society.
Dr. Padmavathi V is Professor of Civil Engineering at JNTUH University College of Engineering, Science and Technology Hyderabad with expertise in Geotechnical Engineering. She began her Geotechnical Engineer journey with a PG in 1997, successfully navigated the academic realm, earning a Ph. D. in 2009 in the topic of laterally loaded piles while excelling as Assistant Professor. She has around 60 publications in reputed journals and conferences. She has been awarded a research grant from DST for 2022-2025. She got a patent as an inventor on “G Shear Box Test to Determine Shear Stress – Displacement and Strength of Coarse-Grained Soils at Low Normal Stresses.” Elected for Executive Committee member of Indian Geotechnical Society, New Delhi for 2011-12. She is also associated with the Hyderabad Waste Management project for suitability, quality control of liner systems, and slope stability of landfills. She was listed in the book of ‘Daughters of Indian Soil’ published in IGC-2023, as one of the top 75 ‘Influential Indian Women in Geotechnical Engineering’. She has also delivered expert lectures in Engineering Staff College of India and other engineering colleges in India, chaired sessions in several national and international conferences, and attended international conferences like SLOPE 2015, GEOMEAST 2018, and SEE 2019.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.