[Genuine] Introduction to isolated building Jing-Yu Su(Chinese Edition)
Language: Chinese
Published by Metallurgical Industry Press, 2000
- Softcover
- New

Seller: liu xing, Nanjing, JS, Chinaliu xing
AbeBooks seller since April 7, 2009
Condition: New
£ 52.51
- Bank Wire Transfer
- Paypal
Quantity: 1 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Pub Date: 2012 Pages: 242 Publisher: Metallurgical Industry Press title: Introduction to isolated building original price: 45.00 yuan Author: Jing-Yu Su Press: Metallurgical Industry Press Publication Date: April 1. 2012 ISBN: 9787502458898 Number of words: Page: 242 Edition: 1st Edition Binding: Paperback: 16 commodity identification: asinB007Y4IZMA Editor's Choice Jing-Yu Su. had Germany and China. Tian Jie written the Introduction to isolated building on the one hand summarizes the author over the years in isolation technology research and experience in engineering applications. on the other hand close contact with the research and application of domestic and international isolation technology trends and the latest progress in recent years. the course of development and application of seismic isolation technology implemented progressively to elaborate. The book is available for the majority of civil engineering and technical personnel to read the reference. as the teachers and students of institutions of higher learning civil engineering and other professional teaching reference books. Abstract no directory to a building isolation principle with progress 1.1 basic concepts of building isolation 1.1.1 building isolation system 1.1.2 the development process of building isolation system 1.1.3 earthquake isolation technology test 1.2 every Classification 1.3.1 1.2.1 isolation system composed of the basic principles of shock technology 1.2.2 Principles of isolation technology 1.3 isolators for buildings divided by isolation technology 1.3.2 divided by the location of the isolation layer 1.4 Isolation Technology in China Research and Application Development 1.4.1 1.4.2-based research to friction slip system based rubber bearings system 1.4.3 Isolation technology diversified. practical and in-depth study of 1.4.4 of 1.4.5 of construction of the building isolation technology isolation technology standardization 2.1.1 Rubber 2.1 of the mechanical properties of the materials used in the performance of laminated rubber bearings and Design 2.1 laminated rubber bearings. The structural features 2 lead 2.2 laminated rubber bearings parameters 2.2.1 laminated rubber bearings geometric characteristics 2.2.2 laminated rubber bearings of the mechanical characteristics of 2.3 Mechanics of laminated rubber bearings performance test 2.3.1 laminated rubber bearings compression performance 2.3.2 laminated rubber bearings shear properties 2.3.3 laminated rubber bearings performance 2.3.4 laminated rubber isolation durability of bearing ultimate shear properties 2.3.5 laminated rubber bearing tensile properties of 2.4 laminated rubber bearings 2.4.1 2.4.2 2.4.3 Creep performance fatigue performance 2.5 aging properties design pressure and design of shear strain 2.5.3 mechanical isolation bearing laminated rubber bearings performance requirements and design 2.5.1 Classification of laminated rubber bearings 2.5.2 laminated rubber bearings performance requirements 2.5.4 isolation bearing the design building isolated structure analysis method 3.1 isolation bearing construction mechanics model and parameter calibration mechanics model 3.1.2 3.1.1 Building isolation bearing isolators for buildings rubber branch the mechanical parameters a seat and structural columns in series mechanical model of the system 3.1.3 tandem isolation bearing mechanical model 3.1.4 architectural isolation bearings 3.2 isolated structure dynamic analysis model selection and the establishment of the power equation 3.2.1 single particle basis Dynamic analysis of isolation architecture 3.2.2 multi-particle structure of the base isolation system dynamic analysis 3.2.3 base isolation structural system of vertical ground vibration response analysis of the time history analysis of the 3.3-isolated building 3.3.1 for Structural Dynamics 3.4 isolated building energy analysis methods 3.…
Seller Inventory # FR035022
- Title
- [Genuine] Introduction to isolated building Jing-Yu Su(Chinese Edition)
- Author
- SU JING YU
- Publisher
- Metallurgical Industry Press
- Publication year
- 2000
- Condition
- New
- Binding
- paperback
- Language
- Chinese
- ISBN 10
- 7502458891
- ISBN 13
- 9787502458898
"Synopsis" may belong to another edition of this title.
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.44 | £ 22.40 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.