Function Approach to Transportation Projects - A Value Engineering Guide
Language: English
Published by iUniverse, 2009
- Softcover
- New

Seller: Ria Christie Collections, Uxbridge, United KingdomRia Christie Collections
AbeBooks seller since March 25, 2015
Condition: New
£ 25.66
Quantity: Over 20 available
Add to basketItem description from seller
In English.
Seller Inventory # ria9781440151446_new
- Title
- Function Approach to Transportation Projects - A Value Engineering Guide
- Author
- Kasi, Muthiah
- Publisher
- iUniverse
- Publication year
- 2009
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 144015144X
- ISBN 13
- 9781440151446
- Item weight
- 391 grams
"Synopsis" may belong to another edition of this title.
Excerpt. © Reprinted by permission. All rights reserved.
Function Approach to Transportation Projects
A Value Engineering GuideBy Muthiah KasiiUniverse, Inc.
Copyright © 2009 Muthiah KasiAll right reserved.
ISBN: 978-1-4401-5144-6
Contents
Preface..................................................vAcknowledgements.........................................ix1.0 Introduction.........................................12.0 Information Phase....................................93.0 Information Phase-Functions..........................194.0 Information Phase-Function Logic.....................275.0 Information Phase-Cost...............................456.0 Information Phase-Function Cost......................577.0 Speculation Phase....................................758.0 Evaluation Phase-Screening...........................879.0 Evaluation Phase-Ranking.............................10110.0 Development Phase...................................12311.0 Presentation Phase..................................13312.0 Organizing a VE Study...............................15113.0 Conclusion..........................................161Glossary.................................................171References...............................................177Index....................................................179
Chapter One
IntroductionObjective
The objective of this chapter is to introduce the VE methodology and VE job plan.
History Of Value Engineering Methodology
Larry Miles developed the concept of value methodology while working at General Electric during World War II. Due to shortage of materials, parts and personnel, products were in great demand. Mr. Miles, when purchasing, approached the problem of shortage by asking the question, "What does it do?" Once he had an answer, he explored the question, "What else will do the job?" Through this process he substituted an equivalent or better product that performed the same function as the one in shortage. This new "function based approach" became very successful and was accepted as a value analysis technique. Larry Miles defined value analysis as "... a system for use when better than normal results are needed."
In the 1960's, Charles Bytheway developed a structure for functions which later became a widely known concept, Function Analysis System Technique (FAST). Later, Thomas J. Snodgrass and Ted Fowler developed the concept of a customer-oriented FAST diagram. The term FAST in this book refers to a Function Logic Diagram.
What is Value?
Value is achieved when the project has a very high performance while reaching a broad acceptance at a reasonable cost. Value is subjective. It reflects people's feeling and their needs at the time. Sometimes people can't define or describe what they want. They confuse needs and desires leading to the perception of a constraint.
People value things differently. Consider this the next time you are in a large parking lot. You will see cars of different types, size, color and price. Each one of those cars was purchased because the owner decided it was the best value for them. As an outsider, we cannot make assumptions about the motivation behind those purchases because we don't know the owners. Don't be surprised if a wealthy person chose an economical car or if a luxury car owner can't quite afford the car payment. Similarly, value engineers should not assume how owners set emphasis on the variables that define value. The VE process described in this book places a high priority on understanding the stakeholders-including the owner, their needs, desires and constraints-in order to determine value.
For example, during a VE study of a train station entrance, the owner insisted on an entrance with the best spatial quality. The team developed the entrance with various shapes and dimensions. The owner kept rejecting each idea as too small, too big, too intimidating or too restrictive. As the team got frustrated, they asked him to define his version of spatial quality. He calmly replied, "I will tell you when I see it." The team proposed more ideas until the owner became excited and said, "That's it!" This example demonstrates how subjective the term value can be and how important it is to involve the owner in this part of the process. When the owners, or their representatives, participate in the study, it helps the team define the value of a project.
Determining Value
Exploring the definition of value is a key task during any VE study. When defining value, value engineers should weigh the circumstances under which value is determined. In addition, they should recognize that the constraints, needs and desires of the users, owners and stakeholders influence value.
Years ago, I arrived at a train station around 5:30 am. The temperature was -20 degrees with a lower wind chill index. I needed 40 cents for a bus ride. I checked my pocket and realized that I had only 39 cents. I checked my wallet for a dollar bill to drop in, but all I had was a $20 bill. I couldn't find a cab anywhere. I ended up walking a mile to the office in the cold weather. I would have used as much as $5 to get a bus ride. The question is "What is my estimated value of a penny?" It is definitely not $20. Under the circumstances, I set an upper limit value of $5. What I learned was that the circumstances often dictate the value, but there is always a limit.
Value by Comparison
Value engineering encourages people to ask the question "Why?" It makes people compare the benefits of various options and determine their worth. This approach can be practiced within the context of every decision in life. When my son, who was living in Illinois, wanted to go to an out-of-state university, I asked the question, "Why do you prefer to go to an out-of-state university?" His answer indicated that he wanted to go school with some of his friends. Out-of-state tuition would have cost $9,000/year ($36,000 for four years). For my son the out-or-state school would accomplish the function of Feel Comfortable. Instead of telling him it would cost us an additional $36,000 we equated that to a cost of a sports car. We promised him a car upon graduation if he chose the in-state university. He was given a choice of two functions: Feel Comfortable vs. Receive Gift. In the end, he chose the Attract User function over Assure Convenience function by opting for the in-state school. When he graduated from school, his accomplishment and his maturity made him decide he didn't want the sports car from us. He understood later that his decision to stay in-state resulted in a much higher value. My wife and I were not surprised with the outcome. Similarly in projects, value engineers should look for ideas with alternative functions to compare. Decision makers will be able to understand appropriate value comparisons and will be able to better appreciate its long term use.
Consider an interchange reconstruction project with two alternatives: one would keep all ramps open for a three year construction period, the second would require the ramp traffic to be rerouted with a two year construction period. Which alternative has more value, more inconvenient for a shorter period or less inconvenient for a longer period? These questions are very subjective. Under various circumstances both alternatives are acceptable. Defining value is a critical part of the VE process and instrumental to the ultimate satisfaction of the stakeholders. One way to define value is by comparing various alternatives.
What is Value Engineering?
Value engineering is a systematic team approach to creatively enhance the value of a project or product. In the industry, VE is often referred to with various other names such as value analysis, value planning and value management. When the technique is applied during project planning, it is called value planning. If the techniques are used on an already designed or constructed project, it is called value analysis. The approach to each of these varies slightly, however the job plan remains the same.
VE Job Plan
Value engineering advocates a step-by-step, systematic approach to solve a problem. This systematic approach is embodied within a job plan that has several phases and imposes a set of rules that must be adhered to. The rules may appear to be simple, but they are vital to the success of the value engineering study. This section describes a typical job plan and explains the rules of the job plan and the reasoning behind them.
A typical job plan consists of the following phases:
Job Plan
* Information Phase - Function Analysis Phase * Speculation Phase
* Evaluation Phase
* Development Phase
* Presentation Phase
These phases are illustrated below and are described in more detail in the chapters that follow. These phases can also be summarized with a series of questions, also presented here.
Information Phase
The Information Phase is divided into two sections. The purpose of the first section is to understand the user, owner and stakeholders, and their constraints, needs and desires. The second section is to translate this information into functions of the project. This includes a unique VE technique, function analysis. Function analysis lists the functions, places them in a logical manner and allocates cost to each of them. High cost functions will be tested for their worth. This will be the basis for the speculation of ideas.
Critical questions answered:
What is it?
What does it do? (functions)
What does it cost?
What should it cost? (function cost)
To define functions of the project, the VE team needs to know the owner's/designer's intended solution. The status of this solution depends upon the stage of the project. The following are suggested terms to use to convey the status of the project:
Phase Designation
During Planning As Given
During Design As Intended
At the Completion of Design As Designed
The VE alternatives generated by the VE team should be designated As Proposed.
Speculation Phase
In this phase, the VE team explores alternative ways of performing functions that enhance, or at least maintain, performance or acceptance at a reasonable cost. The key to speculation is to let the mind wander freely, with no limitations. Several techniques can be used to assist the participants in exploring the widest possible range of ideas. These are described in Chapter 7.
Critical questions answered:
What else will do the job?
What if ...?
What is the least expensive way of performing each function?
Evaluation Phase
In the Evaluation Phase the VE Team will rate and rank feasible ideas. The evaluation phase is performed in two steps, screening and ranking.
Critical questions answered:
Will it work?
Will it be acceptable?
Can we afford it?
Development Phase
In this phase the VE team will add information that will facilitate selection of a preferred alternative among the highest ranked alter- natives in the Evaluation Phase.
Critical questions answered:
How can we make it acceptable to owners/users?
What can we do to make it better?
What can be done to make it cost less?
What are the strengths and weaknesses of the leading alternatives?
Presentation Phase
In the Presentation Phase the VE team prepares to convince decision makers to accept the study results. This is accomplished through an effective presentation with facts and features.
Critical questions answered:
How do we present our recommendations?
What are the road blocks?
Who really makes the decision?
Rules for the VE Job Plan
The rules that govern each phase of a value engineering study are briefly described next.
Information Phase
Do not speculate
Do not jump to conclusions. Gather as much information as possible
Do not evaluate
Understand the problem
Speculation Phase
Do not bring preconceived notions to the discussion
Do not question the validity of an idea
Encourage everyone to participate in the creative phase
Evaluation Phase
Do not create
Do not jump to conclusions
Judge each idea against the criteria
Always be prepared to explain your ratings
Development Phase
Improve ideas
Double check that assumptions are reliable
Presentation Phase
Do not assume that ideas are good
Demonstrate their worth
Follow these three steps: inform, instruct and influence
Conclusion
In this chapter, an overview of the value engineering methodology was presented. The questions listed under each phase provide foundations for the understanding of the phase. Rules were presented for each phase. These can be used as checkpoints to ensure the overall objectives for that phase are being met, while adhering to the appropriate parameters. The next chapter describes the first part of the Information Phase: Understanding the project and the stakeholders.
Chapter Two
Information PhaseObjective
The objective of this chapter is to understand the purpose and need of the project. Needs and desires of the stakeholders, owners and users are also discovered. The team needs to understand the problem, the given solution, the stakeholders affected by the problem and the expectations of these stakeholders. This understanding will later be translated into project functions. Project functions are described in the Chapter 3.
Introduction
"If I had only known what I know now, I could have saved a lot of time and pain."
We have all heard similar statements many times in our lives. Exploration of ideas or events prior to the conclusion is key to a better decision process. This is exactly what value engineering process expects in its job plan. Understanding the existing conditions, exploring people's needs and desires are all a part of the information gathering phase. The job plan for VE begins with the Information Phase. In this phase the following questions are asked and answered:
What is it?
What does it do?
What does it cost?
What should it cost?
These questions can be addressed by describing existing conditions, understanding the issues or the problems, identifying the people behind the issues, discussing the As Given solution, if any, and estimating the cost of the solution. In addition, the question "What does it do?" is addressed in terms of functions. The concept of function is the backbone of the VE process. This process is explained in detail in Chapter 3.
Process
In order to ensure that all of the appropriate information is gathered, the following steps are listed as a guide. Explore each of these steps in detail and document the results. This list is only a guide, feel free to explore other areas that may uncover information useful to the project.
Information
Step 1. Describe project including the project history (Chapter 2)
Step 2. Identify stakeholders and develop constraints/needs/desires (Chapter 2)
Step 3. Determine the project functions from the list of stakeholder constraints, needs and desires (Chapter 3)
Function Analysis
Step 4. Develop a Function Logic Diagram from the perspective of the project. (Chapter 4)
Step 5. Determine the cost of each element. (Chapter 5)
Step 6. Distribute the cost of each element to each of its functions and analyze its worth. (Chapter 6)
Stakeholders
A key component of the Information Phase is to identify the stakeholders. Stakeholders are the ones who determine if the project is a success or failure.
There are three kinds of stakeholders: users, owners and others.
Owner
* Financially responsible for funding the project
* Shares in the funding
* Represents the owner's interests
* Manages the project
User
* Actively uses or maintains the project
Others
* Financially affected by the project
* Environmentally concerned about the project
* Disturbed by any required change in habits or recreation
Define Stakeholder Constraints/Needs/desires
Each stakeholder has expectations regarding the project. These expectations are grouped into constraints, needs and desires. Descriptions of these are as follows:
Constraints
* Legal requirements
* Standards of the owner
* Physical conditions of the site
* Commitments to stakeholders
Needs
* Expectations that must be fulfilled by the project if constraints are not violated
* Limitations or restrictions that are imposed by stakeholders but which can be violated. The degree of violations will be considered in the evaluation of alternatives.
Desires
* Expectations that should be fulfilled if cost is not a factor.
There are several points to keep in mind when identifying the stakeholder constraints, needs and desires. First of all, the majority of constraints are dictated by the law and the applicable codes and standards for land use. These constraints are too numerous to be listed for each VE Study.
(Continues...)
Excerpted from Function Approach to Transportation Projectsby Muthiah Kasi Copyright © 2009 by Muthiah Kasi. Excerpted by permission.
All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
"About the title" may belong to another edition of this title.
Ria Christie Collections
Uxbridge, United Kingdom
AbeBooks seller since March 25, 2015
Shipping rates from United Kingdom to U.S.A.
| Item | 6 to 12 business days | 6 to 12 business days |
|---|---|---|
| First item | £ 9.37 | £ 9.37 |
Payment methods
Store description
Hello! Ria Christie Collections is an online venture that was initially set up in 2012 to sell books. We do not have a physical high street store. We are professional online booksellers. We only sell brand new books in perfect condition that we source from various suppliers and the publishers. Primarily, our aim is to provide an excellent service to all our customers. We always work as a team to achieve this. Our other objectives are to: 1. Ensure that all our products reach their destination quickly in a safe and secure manner 2. Answer to all our customer queries within 24 hours 3. Ensure that our customers are happy with their purchases 4. Provide all the items at a competitive price 5. Always listen to our customers Ria Christie Collections is not a registered company. It is a Sole Trader venture. Other key information is shown below: Contact Person Name: Rakesh Luchmun (Mr) Storefront Name: Ria Christie Collections Place of Establishment Address: Suite B; ARUN House; ARUN Building Arundel Road Uxbridge UB8 2RR United Kingdom E-Mail Address: riachristie@hotmail.co.uk VAT Number: GB 160 5650 25 We always work hard and aim to comply with all of Abebooks Policies. If you have any issues, please do not hesitate to write to us whether before or after a purchase. We promise to reply to you promptly and, in any case, within 24 hours. Thank you kindly! Yours sincerely Mr Rakesh Luchmun (Founder) and the Ria Christie Collections Team…
Specialty
Educational books, Textbooks, Fiction, Non- fictionSeller's business information
Ryefield Investments Limited
175 Pield Heath Road
Uxbridge, United Kingdom UB8 3NL
Terms of sale
All Returns and Refund are as per Abebooks policies.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Ria Christie Collections, Uxbridge, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required. Thank you!