Fluidization Processes
Ray Cocco
Sold by Books-by-Floh, Paderborn, Germany
AbeBooks Seller since 13 March 2026
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by Books-by-Floh, Paderborn, Germany
AbeBooks Seller since 13 March 2026
Condition: New
Quantity: 1 available
Add to basketNeuware -A comprehensive and up-to-date look at fluidization processes Fluidization Processes: Design and Operation delivers a thorough, practical guide to the design and operation of gas-solid fluidized-bed systems. It grounds readers in the critical concepts that underpin industrial performance, including jets, bubbles, entrainment, heat transfer, particle cohesion, attrition, and fluidization regimes. With a strong emphasis on application, the book explains key design calculations and modeling approaches used in industry. It also provides scale-up methodologies and essential design considerations, along with discussions of bubbling and turbulent fluidized-bed hydrodynamics, circulating fluidized bed (CFB) riser hydrodynamics, and the major components of fluidized-bed units. Readers will also find: - Thorough introductions to core fluidization concepts and particle properties, including Geldart particle classifications - Comprehensive coverage of fluidization regimes, including particle elutriation and entrainment - Practical discussions of design and operation, including distributors, attrition and erosion - Complete treatments of cyclone design and operation, diplegs and standpipes, and pressure-loop calculations Perfect for chemical engineers and process engineers, Fluidization Processes: Design and Operation will also benefit environmental engineers, catalytic chemists, materials scientists, and industrial chemists. 688 pp. Englisch.
Seller Inventory # 9783527354504
A comprehensive and up-to-date look at fluidization processes
Fluidization Processes: Design and Operation delivers a thorough, practical guide to the design and operation of gas-solid fluidized-bed systems. It grounds readers in the critical concepts that underpin industrial performance, including jets, bubbles, entrainment, heat transfer, particle cohesion, attrition, and fluidization regimes.
With a strong emphasis on application, the book explains key design calculations and modeling approaches used in industry. It also provides scale-up methodologies and essential design considerations, along with discussions of bubbling and turbulent fluidized-bed hydrodynamics, circulating fluidized bed (CFB) riser hydrodynamics, and the major components of fluidized-bed units.
Readers will also find:
Perfect for chemical engineers and process engineers, Fluidization Processes: Design and Operation will also benefit environmental engineers, catalytic chemists, materials scientists, and industrial chemists.
Jia Wei Chew, Ph.D., is Professor of Chemical Engineering at Chalmers University of Technology (Sweden). She has worked in both academia and industry, with research interests in multiphase flow and separations.
Ray Cocco, Ph.D., is President and CEO of Particles in Motion, LLC. He has spent most of his career in industry, where his work has contributed to the development of several particle technology platforms.
"About this title" may belong to another edition of this title.
General Terms and Conditions
Table of Contents
1. Scope
These General Terms and Conditions (GTC) apply to all orders placed via the Abebooks or ZAVB website by consumers and entrepreneur...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books-by-Floh, Paderborn, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 91.13 | £ 112.83 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.